A glossy, flowing feature floor without stone? How metallic epoxy is poured, what makes it last, and what it costs.
📍 We serve KL, Selangor & Putrajaya.

A metallic or marble epoxy floor is a decorative resin floor: a primer and usually a dark base coat, then a clear epoxy carrying metallic pigment that is poured and worked by hand while wet to create swirls, depth or a marble-like pattern, finished with a clear protective topcoat. Every floor is one-off, the concrete preparation decides whether it lasts, and indoors it still needs a UV-stable topcoat near windows. On ClickBina's guides a metallic or 3D epoxy system is RM18 – RM28 per sq ft, against RM30 – RM80+ per sq ft for natural marble supplied and laid (indicative 2026, Klang Valley).
Ordinary epoxy floors are a solid colour, chosen for garages, kitchens and factories because they are seamless, tough and easy to clean. A metallic floor uses the same kind of two-part resin, but adds fine metallic pigment to a clear coat. As the coat is moved around, the pigment catches the light at different angles, giving a pearly, flowing look that can resemble marble, lava, water or polished metal.
“3D” and “marble epoxy” are names for the same family: the effect comes from how the pigment and colours are worked, not from a different product. It is a feature floor, chosen for looks first.
| Layer | What it does |
|---|---|
| Surface preparation | Grinding and cleaning so the resin can bond to the concrete |
| Primer | Seals the concrete; on porous floors a separate primer coat goes first |
| Base coat, usually black or very dark | Makes the metallic colours show most vividly; a light base gives lighter colours |
| Metallic coat | Clear epoxy with pigment, poured in ribbons, spread and back-rolled, then worked into patterns |
| Clear topcoat | Protects the colour layer and pigment, and hides small scratches |
The pattern is made in the short time the metallic coat stays workable. Installers add a second colour early for a blended look or later for sharper separation, and some mist a solvent on the surface for a hammered, cratered effect. Any dust or thread on the floor shows clearly in the finish, so the surface is scraped clean just before the pour.
Because the effect is worked by hand on site, no two metallic floors are identical, and a sample board is a guide to colour and style, not an exact preview. Ask to see finished floors by the same installer, agree the colours and the amount of movement you want, and accept that the final pattern is part craft.
That also affects repairs. A patch on a metallic floor almost never matches the swirl around it, so damaged areas are usually sanded and recoated over a larger area. ClickBina's guide to peeling, bubbling and yellowing epoxy notes that new epoxy rarely matches old, faded epoxy exactly; on a feature floor that matters more.
Epoxy bonds mechanically to concrete, so the slab must be ground, clean and dry. Moisture rising through a slab is the main reason epoxy floors fail in our climate: a sealed film traps the vapour and it pushes up blisters. Old sealers, paint and oil stains must come off first.
ClickBina's floor screed and self-levelling guide covers getting a flat base before any seamless finish.
Standard floor epoxies are aromatic resins, and they yellow and chalk in sunlight. Indoors the yellowing is usually strongest in a band near glass doors, windows and skylights, which is exactly where a living-room feature floor gets noticed. On a metallic floor, a yellow tint shifts the colours you chose.
The answer is the topcoat: the epoxy failure guide notes that a UV-stable aliphatic polyurethane or polyaspartic topcoat is needed where the floor sees sun, and that aromatic PU yellows too, so ask to see the topcoat's data sheet. Metallic epoxy is not a good choice for an open car porch or outdoor area.
| Floor | Look | Watch for |
|---|---|---|
| Metallic / marble epoxy | Glossy, pearly, one-off pattern | Yellowing near windows without UV topcoat; patches show |
| Natural marble | Real stone veining | Higher cost, etching from acids, polishing over time |
| Self-levelling solid epoxy | Plain gloss colour | Less decorative; same preparation rules |
| Epoxy flake | Speckled, textured | More forgiving of scratches; less luxurious look |
| Polished concrete or microcement | Matte to satin mineral look | Different upkeep; no metallic depth |
ClickBina's marble flooring guide covers real stone and marble-look porcelain, and the polished concrete guide covers the industrial alternative.
These figures are published on ClickBina's guides (indicative 2026, Klang Valley):
| System | Indicative price | Source guide |
|---|---|---|
| Metallic / 3D epoxy (primer, metallic pigment layer, clear topcoat) | RM18 – RM28 per sq ft | Epoxy floor cost guide |
| Self-levelling epoxy | RM10 – RM18 per sq ft | Epoxy failure guide |
| Epoxy flake (decorative) | RM14 – RM22 per sq ft | Epoxy failure guide |
| Natural marble, supplied and laid | RM30 – RM80+ per sq ft | Marble flooring guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteWhat moves the price within the range: how much preparation the slab needs (grinding, crack repair, levelling, removing old coatings), the number of colours and effects, a UV-stable or anti-slip topcoat, the size of the area and how many rooms must be done in sequence.
We do flooring as part of renovation work and can prepare the base, level the floor and coordinate the epoxy finish with the rest of the job. WhatsApp us your job details for a quote: your area, the space and its rough size in sq ft, the current floor and the colours you have in mind.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guide named in the table; they are indicative Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.