Closing or Opening a Void
Double-Volume Spaces in Landed Houses (2026)

Turning a double-height hall into an extra room, or cutting a void for light: what the job really involves.

📍 We serve KL, Selangor & Putrajaya.

Double-height living hall with a void under the upper landing and tall windows

Closing a void means building a new floor across a double-height space; opening one means cutting an existing floor slab. Both are structural work: a professional engineer designs the new floor or the opening, and the council approves the change before work starts. As a guide to the new floor itself, ClickBina's mezzanine guide prices timber joists with plywood decking at RM80–RM130 per sq ft installed and a steel I-beam frame at RM120–RM180 per sq ft, with engineer's fees on top.

What a void is, and why owners change it

A void is an opening in the upper floor that makes the room below double-height: over the living hall, the entrance foyer or the staircase. Many semi-Ds, bungalows and newer double-storey terraces are sold with one because it looks generous and brings light from high windows into the middle of the house.

Living with it is a different matter. Owners usually want to close a void for one of four reasons: an extra bedroom or study upstairs, a living hall that is hard to keep cool, noise that carries from the hall into the bedrooms, or high windows and fittings that are hard to clean and maintain. Fewer owners go the other way and cut a new void, usually to bring daylight into a dark ground floor or to create a feature space over a new staircase.

Why this is structural work

A floor is not just boards laid across a gap. It needs beams that carry the load back to columns or load-bearing walls, and those must be able to take it all the way down to the foundations. Closing a void adds weight the original design may not have allowed for; opening one removes part of a slab that may be bracing the structure or carrying loads from above.

That is why a professional engineer has to check the existing structure and design the change before anything is bought or cut. ClickBina's guide to adding a second storey explains the same principle for a bigger job, and lists an engineer's site visit and report at RM1,500–RM3,000. A contractor builds to the engineer's drawings; it does not replace them.

Approval before work starts

Closing a void usually adds floor area, and opening one changes the structure, so both are treated as building works that need plans submitted to the local council. The add-second-storey guide notes that building without plan approval is a criminal offence with a fine of up to RM10,000, and that the council can order the work stopped or removed at the owner's cost. Unapproved works also cause trouble when you sell or refinance.

In a strata development, such as a landed strata scheme or a duplex condo, the management's written approval comes first. ClickBina's duplex and penthouse renovation guide covers the condo version of this job.

Ways to close a void

The engineer chooses the floor system to suit the span, the load and the existing structure. The common options are a reinforced concrete slab, a steel frame with a deck, or a lighter timber floor for short spans. ClickBina's mezzanine guide, which covers floors built inside high spaces, describes timber joists with plywood decking as the lowest-cost system for short spans and a steel I-beam frame for longer spans or heavier loads.

Floor systemSuitsWhat to weigh up
Reinforced concrete slabA full new room upstairs, wet areas, long-term solidityHeaviest; needs formwork, curing time and the most structural checking
Steel frame with deckLonger spans, faster building, less wet work inside the houseNeeds fire and corrosion protection and a finish that hides the steel
Timber joists and plywoodShort spans, light use such as a study or storageLowest cost; more footfall noise; keep away from damp
Partial closure (a gallery or loft)Keeping some height and light while gaining a usable stripStill structural; the open edge needs a proper balustrade

Opening a new void

Cutting a void into an existing floor is the riskier direction. The engineer decides where the slab can be cut, whether new beams or trimmers are needed around the opening, and how the floor is supported while it is cut. The edge of the new opening then needs a balustrade, and the rooms upstairs lose floor area.

Before committing, check whether a skylight, a bigger window or better lighting would solve the dark ground floor more cheaply. ClickBina's skylight cost guide compares those options for landed houses.

What it does to aircon, light and sound

  • Aircon: a double-height room holds a lot of air and warm air collects at the top, so closing the void usually makes the hall easier to cool. Opening one does the reverse; size the units for the real volume.
  • Daylight: closing a void can leave the ground floor darker if the high windows were its main light. Plan new lighting before the ceiling goes up.
  • Sound: a void carries television and kitchen noise straight to the bedrooms; closing it cuts that path.
  • Windows: tall windows that span the void may end up half in the new room and half in the hall below, which the layout and the facade have to deal with.

Lighting, wiring and the chandelier

Most voids have a pendant or chandelier hanging from the roof slab or the upper ceiling. Closing the void means taking it down and planning new points in the hall's new, lower ceiling. Opening one may mean a new high fitting, and ClickBina's chandelier and pendant light guide explains why the fixing, the point and the access cost more than the fitting: a fan or chandelier point reinforced to the slab is listed at RM150–RM480 per point, and a pendant or chandelier over a stairwell void at RM500–RM5,000 for the fitting alone.

Wiring for the new upstairs room, aircon points and any switches on the new floor should be laid while the floor and ceiling are open, not chased in afterwards.

Staircase and railings

Many voids sit beside or over the staircase, so the stair, its railing and the upstairs landing are part of the job. Closing a void can mean a new landing and a shorter railing; opening one means a new edge that must be guarded. ClickBina's mezzanine guide lists a powder-coated steel or timber balustrade at RM350–RM700 per running metre and a structural glass balustrade at RM900–RM1,800 per running metre. The staircase renovation cost guide covers the stair itself if it is being refreshed at the same time.

What the main pieces cost

ItemIndicative price (Klang Valley, 2026)Source guide
Timber joists and plywood decking, per sq ft installedRM80 – RM130Mezzanine floor cost guide
Steel I-beam frame, per sq ft installedRM120 – RM180Mezzanine floor cost guide
Engineer (PE) design fees for a floor inside a high spaceRM3,000 – RM8,000Mezzanine floor cost guide
Engineer's site visit and reportRM1,500 – RM3,000Add a second storey guide
Steel or timber balustrade, per running metreRM350 – RM700Mezzanine floor cost guide
Structural glass balustrade, per running metreRM900 – RM1,800Mezzanine floor cost guide
Fan or chandelier point reinforced to the slabRM150 – RM480Chandelier and pendant light guide

Want this priced for your home?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

A reinforced concrete slab, new beams or foundation work are priced from the engineer's design, so they are not in this table. Finishes on both sides of the new floor, the ceiling below and the flooring above, add to the structure.

Order of work

  1. Decide what you want: a new room, a quieter or cooler hall, or more light.
  2. Have a professional engineer inspect the structure and design the floor or the opening.
  3. Submit plans and get council approval; in a strata scheme, get management approval first.
  4. Protect the house, take down fittings in the void and set up safe access at height.
  5. Build the structure to the engineer's drawings, with the engineer inspecting at the stages they set.
  6. Lay wiring and aircon points, then ceilings, flooring, balustrades and finishes.

How ClickBina can help

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. Once a professional engineer has designed the new floor or the opening and the approvals are in place, the building work, wiring, ceilings, flooring, railings and finishes can be planned and quoted as one job. WhatsApp us your job details for a quote: the area, the property type, where the void is and what you want the space for. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina mezzanine floor cost guide — floor systems, engineer's fees, balustrade prices.
  • ClickBina add a second storey guide — engineer's visit and report, plan approval and the penalty for skipping it.
  • ClickBina duplex and penthouse renovation guide — the condo void, aircon in double-height rooms.
  • ClickBina chandelier and pendant light guide — reinforced points and stairwell fittings.

How we estimated prices: every figure is quoted unchanged from the ClickBina guide named beside it; they are indicative Klang Valley ranges, not a quotation. This page is general information, not structural or legal advice; a professional engineer decides whether and how your void can be closed or opened.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Can I close the void in my house to make an extra room?
Often yes, as structural work: a professional engineer designs the new floor, and the council approves the plans before work starts.
Do I need council approval to close a void?
Yes in most cases, because it adds floor area and changes the structure. Building without plan approval can bring a fine and an order to remove the work.
How much does it cost to close a void?
ClickBina's mezzanine guide prices a timber floor at RM80–RM130 per sq ft and a steel frame at RM120–RM180 per sq ft installed, plus engineer's fees and finishes; a concrete slab is priced from the engineer's design.
Concrete, steel or timber: which floor is best?
The engineer decides from the span and load. Concrete suits a full room, steel suits longer spans and faster work, timber suits short spans and light use.
Will closing the void make my hall cooler?
Usually, because there is less air to cool and warm air no longer collects high above the room, but plan new lighting since the high windows may no longer light the hall.
Can I cut a new void into my floor?
Only with an engineer's design for where the slab can be cut and how the opening is supported, plus approval and a proper balustrade around the edge.
What happens to the chandelier in the void?
It comes down when the void is closed, and new points go in the hall's lower ceiling; the wiring is best laid while the floor and ceiling are open.

Free Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote