Motorised Curtains for Double-Volume & High Windows
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🪟 High-Window Curtains

Motorised Curtains for High Windows
Double-Volume Halls, Stairwells & Tall Glass

How to plan a motorised curtain for glass nobody can reach: access, long and heavy drops, track layout, power at the top of the window and scenes for a void.

📍 We serve KL, Selangor & Putrajaya.

Two-storey glass wall in a double-volume hall with motorised sheer and blackout curtains

On a double-volume or staircase window, a motor is not a luxury: it is the only way the curtain gets used, because nobody can reach it. The hard parts are not the motor itself but the height: getting safe access to fix the track and to service the motor later, handling a long, tall and heavy drop, deciding between one long run and a centre-opening pair, and choosing a power source you will not have to climb up to recharge. Plan those before choosing fabric. High windows are where a smart home pays for itself in daily comfort.

Why high windows are a different job

A curtain on an ordinary bedroom window is a short, light drop on a ceiling you can touch from a stepladder. A curtain across the glass of a double-volume hall, a stairwell or a penthouse living room is a different object: much taller fabric, a track fixed high up on a slab or a void ceiling, and a motor head nobody will see or touch for years. Every decision that is easy at normal height becomes harder, and every mistake costs a second visit with access equipment.

The same houses also suffer most from the problem the curtain is meant to solve. Tall glass facing west turns a void into a heat trap in the afternoon, and the guide to closing or opening a void lists high windows that are hard to maintain among the main reasons owners consider closing one. A well-planned motorised curtain is a much smaller step than closing the void.

Access: plan the climb before anything else

The single biggest risk on this job is how people get up to the track. A stepladder balanced on a staircase landing or on top of a sofa is how falls happen at home. Ask anyone quoting how they will reach the track, and expect the answer to fit the space.

Where the window isTypical accessWhat to ask before the visit
Double-volume living hall with a flat floorA mobile access tower or a sturdy platform ladderWhether furniture must be moved and the floor protected
Over a staircaseA tower or platform designed to stand on stairs, never a stepladder on the landingHow the platform will be levelled and secured on the steps
Clerestory or high glass above a mezzanineAccess from the mezzanine edge, with the edge protectedWhether the railing allows a safe working position
Penthouse or duplex living roomA tower inside the unit; building rules on equipment in liftsManagement rules on access times and moving equipment in
Very high or awkward voidsScaffolding put up for the jobWhether other high jobs can be done in the same visit

Because access is the expensive part, bundle high jobs together. The guide to scaffolding for home renovation explains when a tower or scaffold is worth it, and the same visit can cover painting the upper wall, a high light fitting or cleaning the tall glass.

Long drops and long tracks

A tall window means a long drop of fabric, and a long drop is heavy, especially with a blackout lining. The track and motor have to be chosen for that load, not for the width alone. Wide glass adds a second problem: a track longer than one standard length is joined, and every joint is a place where runners can catch.

  • Ask whether the track will be one continuous length or joined, and where any joint will sit.
  • A joint should be aligned so runners pass it smoothly; a step at the joint is the classic stopping point.
  • A long track needs more fixing points to the ceiling, so it does not sag between them.
  • Check that the track can be delivered and carried into the house in the length required.
  • If the window turns a corner, a bent track or two separate tracks are both possible; ask which suits the motor.

One long run or a centre-opening pair

A single panel that draws all the way across a wide window travels the longest distance and stacks the whole fabric at one end. A centre-opening pair splits the fabric, so each half travels half the distance and the stacks sit at both sides. On wide, tall glass the pair is often the smoother choice, but it can mean two shorter tracks with two motors rather than one track and one motor.

LayoutStrengthsWatch out for
Single draw, one motorOne control, simple pairingLong travel and a big stack at one side
Centre-opening pair on one trackShorter travel per half, balanced lookThe overlap in the middle must not catch
Two tracks, two motors, groupedEach motor carries less load; halves can be splitBoth motors must be grouped so they move together
Sheer and blackout on separate tracksDay privacy and night blackout from one windowEnough depth for two tracks and two motor heads

Remember the stack. A tall curtain drawn open still covers a strip of glass at each side, so allow room beyond the window edge for the fabric to park if you want the full view.

Sheer plus blackout on a high window

Many owners want a sheer for daytime privacy and a blackout layer for the evening. At height, that means two motorised tracks side by side, each with its own motor head, and enough depth in the ceiling or curtain box for both. If a recessed slot is being formed during renovation, size it for the second track at the start, because widening it later means opening the ceiling again.

Two motors also mean two devices to pair and two to group. Set up scenes that move them sensibly: sheer closed and blackout open on a hot afternoon, both closed at night, both open on a dull morning.

Fixing into a high slab or a void ceiling

A heavy curtain pulled by a motor tugs on its fixings every day. On a bare concrete slab, the track is fixed into plugs in the concrete. On a plaster ceiling in a void, the screws must land on framing or a backing strip built in for the purpose; plasterboard alone will not hold a long, heavy drop for long. Where the ceiling is still being built, ask for a continuous backing strip above the window.

In a condo duplex or penthouse, drilling into the slab is renovation work. Check the management's rules on working hours and approvals before the visit, and ask whether a metal detector will be used before drilling near concealed conduits.

Where the motor head should sit

The motor sits at one end of the track, and at height that choice matters more than usual. Put it at the end that can be reached most easily later: the side next to a mezzanine, above a landing, or nearest a future power supply. If the track sits in a curtain box, make sure the box is deep enough and that the motor can be removed without taking the box apart.

Ask for the motor's manual override too. Most decent motors can be moved by hand or have a manual release, and on a window you cannot reach easily, that override decides whether a failed motor leaves the room light or dark until it is fixed.

Power at the top of a tall window

This is the decision that most often goes wrong. A rechargeable battery motor needs no cable, which sounds ideal, but its battery sits at the top of the window, so every recharge means getting up there again unless the motor accepts a charging lead run down to reachable height or a small solar panel on the glass. On a window that is only reachable with a tower, ask exactly how charging will work before choosing battery.

A mains motor solves charging but needs a supply at the head of the window, which is best planned while the walls and ceiling are open. Section 2 of the Electricity Supply Act 1990 treats "the adding of any part" to an installation as electrical work. Any mains electrical work, such as a new power point, a change at the distribution board or a hardwired switch that needs new wiring, must be done by an electrical contractor registered with Suruhanjaya Tenaga.

The general trade-offs are set out in the battery versus mains curtain motor comparison, and the guide to smart home pre-wiring during renovation explains what to run before the ceiling closes.

Control and scenes for a void

A high curtain is almost always run from a remote, an app, a wall keypad or a schedule, never by hand. Useful automations for a double-volume space include:

  • Closing the west-facing glass before the afternoon sun reaches the hall.
  • Opening at sunrise on the side that catches morning light, and staying closed on the hot side.
  • Closing both layers at night for privacy from the road or neighbours, since high glass is very visible.
  • Grouping every curtain in the void so one button moves them together.
  • Keeping one simple remote or keypad near the stairs for guests and helpers.

If you are adding a motor to a track that is already up, the guide to adding a motor to an existing curtain track explains which tracks can take one.

Upkeep you can plan for

High curtains collect dust like any other, but nobody notices until the fabric looks grey. Plan cleaning for the same visit as other high jobs, and remember that taking a motorised curtain down and rehanging it may mean resetting the motor's end positions. The guide to cleaning high windows at home covers access for the glass itself, and the high-ceiling design ideas show how curtains are dressed on tall walls.

How ClickBina helps

We plan motorised curtains for double-volume halls, stairwells and duplex living rooms: the layout, single draw or pair, sheer and blackout tracks, the motor end and how it will be reached, and the scenes for the space. For battery and plug-in motors, we install the motors, pair the remotes and group them in your app. For smart switches and anything wired into the mains, we supply the devices and set up the app, and the switch or wiring work is done by an electrical contractor registered with Suruhanjaya Tenaga that we coordinate.

Whoever does the work, ask how they will reach the track safely, where the motor head will sit, how charging or power will work, and keep the app account in your own name. The smart curtain motorisation guide covers motor types and control layers in general.

Sources & references

  • Electricity Supply Act 1990 (Act 447), Suruhanjaya Tenaga copy: section 2, the definition of electrical work, which includes adding any part to an installation.
  • Your curtain motor and track manuals: load limits, manual override and charging differ by maker and model.
  • ClickBina guides on voids, scaffolding, high-window cleaning and smart curtain motorisation.

This page is general planning guidance for motorised curtains on high windows. Access arrangements, track lengths and motor choice depend on the window, the building and its management.

Ready to set up your smart home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Are motorised curtains worth it on a double-volume window?
Usually yes. A curtain nobody can reach is rarely used by hand, so a motor is what makes it work at all, especially on west-facing glass that heats the hall.
How is a curtain track fixed so high up?
From a mobile tower, a platform designed for stairs, or scaffolding, depending on the space. A stepladder on a landing or a sofa is not a safe option.
Is a battery curtain motor a good idea for a high window?
Only if charging is easy: a lead run down to reachable height, or a small solar panel. Otherwise every recharge means another climb.
Should I use one long curtain or a centre-opening pair?
On wide, tall glass a pair is often smoother, because each half travels less. It may need two motors grouped to move together.
Can I have both sheer and blackout curtains on a high window?
Yes, on two tracks with two motors, if the ceiling or curtain box is deep enough. Plan the depth during renovation.
Where should the motor go on a high track?
At the end that is easiest to reach later, such as next to a mezzanine or above a landing, and near the power supply if it is a mains motor.
What happens if the motor fails on a curtain I cannot reach?
Most decent motors have a manual override or release. Learn how it works at handover, before you need it.