For buyers checking a developer's smart home offer, and for small developers planning a show unit that matches what buyers receive.
📍 We serve KL, Selangor & Putrajaya.

A smart home from a developer is only what the sale documents list, not what the show unit displays. Before you sign, get the package schedule in writing, ask which devices, app and hub are included, who owns the app account at handover, and who repairs a faulty device during the defect liability period. Small developers planning a show unit should demonstrate only what buyers will actually receive, and hand every buyer a clear device list. For devices and set-up in general, see smart home installation.
Developers use the phrase "smart home" for very different things. In one project it means a digital lock and a video intercom to the guardhouse; in another, a hub, smart switches in the living room, an aircon controller and an app that also books the building's facilities. Some packages are built into the price; others are an upgrade offered at the sales gallery.
Because the label is so loose, a buyer has to compare what is written, not what is said. The useful question is never "is it a smart home?" but "which devices, from which ecosystem, controlled by which app, and owned by whom after handover?"
A show unit is built to sell. It often carries premium finishes, loose furniture and extra devices that are not part of the standard unit, usually with a small notice saying so. Smart devices are especially easy to over-show: a demo tablet on the wall, motorised curtains and mood lighting scenes can all be display items.
| Question | Why it matters | A good answer looks like |
|---|---|---|
| Which devices come with my unit type? | Show units mix standard and display items | A written list per room |
| Which ecosystem and app do they use? | Decides what you can add later | A mainstream app that supports other brands |
| Is there a hub, and does it stay with the unit? | Without the hub, many devices stop working | Hub listed as part of the unit |
| Is the app the building's or my own? | A building app may control only shared facilities | Unit devices in an account in your name |
| Who repairs a faulty device after handover? | Smart devices fail differently from tiles | A named contact and the maker's after-sales route |
| Do the switches have a neutral wire and deep boxes? | Decides future smart-switch upgrades | Yes, at least in the main rooms |
| Is there a network point or cabinet for a router? | Weak WiFi breaks smart devices | A data point near the fibre entry |
Two different apps often get confused at the sales gallery. A building or community app usually handles visitor passes, facility booking and notices from the management. An in-unit smart-home app controls the lock, lights and sensors inside your home. Ask which is which, and whether the in-unit devices can be moved into an account in your own name on handover day.
Prefer devices that work with a widely used ecosystem, so you can add your own sensors and switches later without replacing the developer's. The comparison of Aqara, Tuya and Xiaomi explains the trade-offs, and the guide to smart homes without internet covers what keeps working if the cloud service ends.
The parts that are hard to change after handover matter more than the gadgets. Smart switches need a neutral wire at the switch and enough depth in the switch box; without them, upgrades later are limited to no-neutral models with their own quirks. The guide to no-neutral smart switches explains why, and the switch box size guide covers the box question.
Network cabling is the other built-in part. A data point near the fibre entry and a place for a router and hub make every later device more reliable; the smart home pre-wiring guide lists what to plan. Battery locks, plug-in sensors and IR controllers, by contrast, are easy to add yourself at any time.
Any mains electrical work, such as a new power point, a change at the distribution board or a hardwired switch that needs new wiring, must be done by an electrical contractor registered with Suruhanjaya Tenaga.
A new property comes with a defect liability period, and the guide to the defect liability period explains how claims work. Smart devices raise a practical question the general rules do not answer for you: if a developer-supplied lock or switch fails, does the developer's team fix it, or are you sent to the device maker?
Ask for the answer in writing before handover, along with a contact for device faults. Keep the device list, model numbers and installation dates, because the maker's after-sales service will ask for them. If you add or change devices yourself, keep a record of what was there at handover, so a fault in the original items is not confused with your own work.
Many buyers wonder whether to take the developer's smart package or skip it and set up their own after key collection. Neither is always right; the comparison below helps.
| Point | Developer package | Your own set-up after handover |
|---|---|---|
| Choice of brand | Fixed by the developer | Yours |
| Ready on moving-in day | Yes, if handed over properly | Needs a few days after keys |
| Hidden parts such as conduits and neutral | Can be planned during construction | Limited to what was built |
| Who fixes faults | Depends on the sale documents | Your installer and the device maker |
| Account ownership | Must be transferred to you | In your name from the start |
For the wider question of developer upgrade packages versus your own contractor, see the developer package vs own contractor guide. If you go your own way, the guide to smart home set-up at key collection covers the first weeks after you get the keys.
For a small developer or a boutique project, a smart show unit is an effective sales tool, as long as it does not promise more than the standard unit delivers. A few habits protect both the sale and the developer's reputation after handover:
Whether you are a buyer asking for it or a developer preparing it, the pack should let a new owner run and reset the devices without calling anyone:
When ownership later changes again, the smart home reset and handover guide explains how to clear accounts properly.
For buyers, we install smart locks, sensors and IR controllers after handover, set up the app in your own name, and can add to what the developer supplied where the ecosystem allows. For developers, we can quote for setting up the smart devices and demo scenes in a show unit. We do the smart device, app and low-voltage side of the job. For smart switches and anything wired into the mains, we supply the devices and set up the app, and the switch or wiring work is done by an electrical contractor registered with Suruhanjaya Tenaga that we coordinate. For a quote, tell us the project or unit type, what is already installed, and your area.
This page is general guidance and is not legal advice. Your sale documents decide what is included.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.