The yearly check that keeps sensors alerting, locks opening for the right people and automations doing what you still want.
📍 We serve KL, Selangor & Putrajaya.

A smart home keeps working when someone looks after it once a year: replace the batteries before they die, install firmware and app updates on purpose, review who has admin access, clear old lock codes and fingerprints, test every sensor and alert, back up the hub and prune automations nobody uses. Most smart-home failures in Malaysian homes come from things that drifted quietly, not from devices that broke. This checklist sets out what to check, what a problem looks like, and when in the year to do it. It sits alongside the wider guide to running a smart home.
Ordinary home maintenance is about wear: filters clog, seals crack, gutters fill. A smart home adds a second kind of decay that is invisible until the day something matters. A leak sensor whose battery died months ago looks exactly like one that works. A former helper's fingerprint still opens the door. The installer's email is still the only admin on the hub. An automation built for a tenant two years ago still switches off the water heater at odd hours.
None of these shows up as a fault light. They show up as a missed alert, a lockout or a household that stops trusting the system. A short, regular check catches them while they are still boring, and it also tells you which devices are near the end of their useful life before they fail on a public holiday.
Work through the table room by room with the app open. Tick each line, note anything that needs a part or a professional, and keep the notes with your house records.
| Area | What to check | Sign of a problem |
|---|---|---|
| Batteries | Every sensor, button, remote and lock | Low-battery icons, slow responses, gaps in history |
| Firmware and apps | Hub first, then devices and the phone apps | Update waiting, device no longer supported |
| Accounts | Admins, members, linked services, sign-in security | Unknown members, installer still admin |
| Locks and access | PIN codes, fingerprints, cards, app users | Codes for people who no longer need them |
| Sensors and alerts | Leak, smoke, door, motion; who gets alerts | Test does not reach every phone |
| Network and hub | WiFi coverage, hub placement, backups | Devices dropping offline, no recent backup |
| Automations | Schedules, scenes, routines | Rules nobody remembers or that fight each other |
| Physical | Dust, damp, adhesive pads, lenses | Sensors hanging loose, fogged camera lenses |
Most wireless sensors run for a long time on one battery, which is exactly why they get forgotten. Open the device list and sort or filter by battery if your app allows it. Replace anything that is low, and anything that has gone quiet in the history without a reason. Many sensors use coin cells; keep a few of the right type sealed in the drawer so a warning does not turn into a week of no protection.
Door locks are a special case because a flat battery locks people out. The guide to smart lock batteries and power cuts covers lock batteries, humidity and emergency entry in detail.
Updates fix security holes and bugs, and occasionally create new ones. The aim is to install them deliberately, when you are at home and can check the result, rather than letting them land the night before you fly.
A smart home is only as secure as the accounts that control it. Once a year, open each app's home or family settings and read the member list properly.
If you are selling, renting out or leaving the property, a yearly review is not enough; the guide to resetting a smart home when you move explains a full handover.
Door access drifts faster than anything else in the house. Contractors get a code during a renovation, a part-time cleaner gets a fingerprint, a relative gets an app key for a holiday, and nobody removes them. Go through every lock's user list with whoever manages it.
Homes with a live-in or part-time helper have a few extra choices to make about doors and cameras; the guide to smart-home access for a domestic helper goes through them.
A sensor that is never tested is a guess. Test each safety sensor in the way its manual describes, and watch where the alert goes.
If an alert reaches only one phone, the system is only as reliable as that one person's battery and signal. Add a second person to every safety alert. For smoke alarms in particular, the smart smoke detector guide covers where they belong and what a smart model adds.
Devices that drop offline now and then are a warning, not a mystery. Look at the hub's device list for devices that keep disconnecting, and note where they are: usually at the edge of the WiFi or the hub's radio range, behind a metal grille, or inside a cabinet. Moving the hub or adding a repeater often fixes several at once.
Back up the hub's configuration if it allows it. Home Assistant's documentation states plainly that it is important to back up the setup regularly, and the same logic applies to any hub that holds your rooms, devices and automations. Keep a copy somewhere other than the hub itself. While you are in the router settings, check that smart devices sit on the network you intended; the guide to IoT network security explains a separate network for them.
Automations accumulate. A yearly look through the list, asking “does anyone still want this?”, removes rules that fight each other, rules that point to devices you no longer have and schedules set for a tenant or a season that has passed. Disable before you delete, live with it for a while, then delete. If a rule you want has stopped working, the guide to automations not triggering walks through the causes.
Malaysian humidity, dust from renovation next door and kitchen grease all reach smart devices. During the check, look at each device as well as its app entry.
Pick one fixed “smart home day” each year, then add a few event-driven checks. The table ties them to moments most households already notice.
| Moment | What to check | Why then |
|---|---|---|
| Before the year-end monsoon | Leak sensors, outdoor devices, battery bays, power backup | Water and power cuts arrive together |
| Before a long holiday | Batteries, away-mode routines, alerts to a second person | Nobody is home to notice a failure |
| When a helper, tenant or contractor leaves | Lock users, app members, shared codes | Access should end with the job |
| After a router or internet change | Every device and linked service | Devices may still be on the old network |
| After a renovation | Sensors, cameras and hubs near the work | Dust, moved furniture, knocked devices |
| Your yearly smart home day | The full checklist above | Catches everything that drifted |
For long trips, the guide to away mode for travel covers lights, cameras and alerts while the house is empty.
We can check the devices, locks and sensors on a visit: batteries, updates, user lists, alert tests, hub placement and the automation list, and we note anything that needs replacing. We do the smart device, app and low-voltage side of the job.
Whatever you decide, keep the admin accounts in your own name and keep a simple record of what was checked and changed.
This page is a general maintenance checklist, not instructions for a specific device. Follow the maker's manual where it differs.
WhatsApp us your job details for a quote — we reply within the hour. Any visit fee is confirmed with you on WhatsApp before we come. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.