Video Doorbell for a Condo: Corridor, JMB and PDPA
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔔 Condo Doorbells

Video Doorbell for a Condo
Corridor, By-Laws, PDPA and Neighbours

A condo doorbell camera looks into a shared corridor. Here is what the by-laws touch, what the PDPA does and does not cover, and how to set it up without upsetting the neighbours.

📍 We serve KL, Selangor & Putrajaya.

Condo unit door in a tiled corridor with a slim video doorbell fixed on the door leaf

A video doorbell can work well in a condo, but the camera faces a shared corridor, so the building's rules and your neighbours matter as much as the device. Fixing a bracket into common property or changing how the entrance looks needs the management's written approval under the strata by-laws, and the camera should cover your own doorstep rather than the corridor. Most owners choose a battery unit or a peephole-style camera so nothing is drilled outside. For the wider set-up in an apartment, see smart home installation.

Why a condo door is a different job

In a terrace house the doorbell question is mostly about distance: the gate is far from the door and visitors stop outside. In a high-rise the visitor has already passed the guardhouse, the lobby and the lift, and is standing in a corridor a step away from your door and your neighbour's. That changes what a doorbell camera is for. It is less about screening strangers at a gate and more about seeing the parcel rider, the cleaner or the relative who has arrived while you are at work.

It also changes who has a say. The corridor, the walls either side of your door and often the frame surround belong to everyone in the building and are run by the JMB or the management corporation. The landed version of this decision is covered in the video doorbell vs intercom guide for landed houses; this page is only about units that open onto a shared corridor.

What the camera actually sees in a corridor

Doorbell cameras are made for a front porch, so most have a wide lens. Mounted beside a condo door, that lens usually takes in the corridor floor, the lift lobby at one end, and the entrance of the unit opposite or next door. Every resident walking to the lift, and every visitor to the next unit, can appear in your clips. Motion alerts make this worse: a busy corridor can trigger a recording every few minutes and fill your phone with clips of other people.

Before buying, stand at your door with your phone camera in wide mode and look at the screen. What you see is roughly what the doorbell will record. If most of the picture is your neighbour's door, plan the angle, a privacy mask or a different type of device before anything is fixed in place.

The strata by-laws that touch a doorbell

The prescribed by-laws in the Third Schedule to the Strata Management (Maintenance and Management) Regulations 2015 say nothing specific about doorbells, but three of them decide how one may be fitted. By-law 22(2) says a proprietor shall not drive nails or screws, or fasten brackets or the like, into any part of the common property without the prior written approval of the management corporation. By-law 29(2) needs the same written approval for any fitting or alteration to the exterior of the parcel that would change the appearance of the common property or the building facade. By-law 28(3) says a proprietor shall not tap electricity supply from the common property without written approval.

In practice that means three questions: is the spot you want to drill yours or the building's, does the device change how the entrance looks, and where does its power come from? A doorbell powered from the corridor lighting, for example, would be tapping supply from common property. The only place the strata framework mentions cameras is by-law 23(2), which lists CCTV cameras among the building's own fittings that nobody may tamper with; it protects the management's cameras and says nothing about yours. The condo CCTV and JMB rules guide goes through the wider camera rules and how to apply for approval.

⚠️ Where your door, its frame and the wall around it sit on the strata plan differs between buildings. Ask the management office before anything is screwed into the frame surround or the corridor wall.

PDPA: what it does and does not cover at home

Owners often ask whether a doorbell that records the corridor breaks the Personal Data Protection Act 2010. The Act has two filters. Section 2(1) applies it to personal data processed in respect of commercial transactions. Separately, section 45(1) exempts 'personal data processed by an individual only for the purposes of that individual's personal, family or household affairs, including recreational purposes'. A household doorbell watching its own entrance may therefore sit outside the Act, but no published guidance from the Personal Data Protection Department settles how far that goes for a camera in a shared corridor.

The position can be different when the unit is run as a business, such as a homestay, a short-stay rental or an office, because the recording may then be connected with a commercial transaction. Treat this as general information, not legal advice. The safest habits are the same either way: keep the camera on your own doorstep, keep recordings for your household only, and do not post clips of neighbours online.

Questions to put to the management office

A short email to the management office before buying saves most condo doorbell disputes. Useful questions are:

  1. May a resident fix a doorbell camera on or beside the unit door, and is a works form needed?
  2. Is the door frame surround and the wall next to the door common property in this building?
  3. Has the building passed any additional by-law or house rule on resident cameras or doorbells?
  4. Must the existing intercom handset or call button stay in place and working?
  5. Is the unit door a fire-rated door, and may anything be screwed into it?

Keep the reply. If a neighbour complains later, a written answer from the management is the record that matters.

Where the doorbell can go

There are four common places for a doorbell camera at a condo entrance, and each carries a different approval question. The table sets them out.

PositionHow it is heldWhat to check firstNotes
On the door leafScrews or a strong adhesive mount on your own doorWhether the door is fire ratedMoves with the door; the view swings when the door opens
On the frame surround or corridor wallBracket screwed into the wallWritten approval under by-law 22(2)The most common position in landed homes and the one most often questioned in condos
On the grille gateClamp or bracket on the grille frameWhether the grille design is controlled by the buildingKeeps the corridor wall untouched; check the view through the bars
In the door viewerReplaces the existing peepholeThat the viewer hole and door suit the deviceNothing fixed outside; see the peephole camera guide

Setting the angle, motion zones and audio

Once the doorbell is up, most of the neighbour friction comes from settings, not hardware. Turn the camera so the frame is filled by your doorstep and the area right in front of it. In the app, draw the motion zone around your mat and grille, not the corridor. Many apps also offer privacy masks that black out part of the picture permanently; use one over the opposite door if it is in view.

Audio is easy to forget. A doorbell that records sound in a quiet corridor picks up conversations at the next door and in the lift lobby. If you only need to talk to visitors when they press the button, switch off audio recording for motion clips and keep two-way talk for button presses. Review the settings again after an app update, because updates sometimes reset them.

Talking to your neighbours first

A neighbour who learns about a camera from a clip in the residents' group is more likely to complain than one who was asked first. Tell the units nearest you before the doorbell goes up, show them the view on your phone, and offer to adjust the angle. It costs nothing and it is often what decides whether a management committee treats a complaint as serious. If the corridor is already a sore point on your floor, a camera aimed at it will not help.

Power and WiFi at a condo door

Most condo unit doors have no doorbell power at all; the button outside is usually part of the building intercom. That is why battery doorbells are the usual choice in condos. The trade-offs between battery and wired units are set out in the battery vs wired doorbell camera guide.

The second problem is the network. The router often sits in a bedroom or the living room, and the signal has to pass the kitchen, the yard area and a solid door before it reaches the corridor. Test the WiFi at the door before choosing a model, and treat a doorbell as a network device: put it on a guest or separate network if your router allows, as the smart device network security guide explains. Wikipedia's smart doorbell entry notes that researchers have raised security concerns about some connected doorbells, so keep the app and firmware updated.

The building intercom stays

A video doorbell does not replace the building's intercom. The guardhouse still calls your unit through the intercom handset, and the call button at your door may be wired back to that system. Leave both in place and working; removing the handset can leave the guard with no way to reach you. If the whole block's intercom is old, that is a building project for the JMB, covered in the condo intercom replacement guide, not something one unit can change.

Checklist before you buy

CheckWhy it matters
Management's written answer on mountingBy-laws 22(2) and 29(2) need written approval for brackets and facade changes
Whether the door is fire ratedDecides whether anything may be screwed into the door leaf
The view from the mounting spotAvoid recording the opposite unit and the lift lobby
Privacy masks and motion zones in the appLets you keep the camera on your own doorstep
Power sourceNo tapping of supply from the corridor without written approval
WiFi at the doorA weak signal means late alerts and missed visitors
Intercom handset and call buttonThe guardhouse still needs to reach you

For the rest of the unit, from locks to lighting, the condo smart home guide covers what usually fits a high-rise.

How ClickBina helps

We install video doorbells and peephole cameras at condo unit doors, set the angle, motion zones and privacy masks with you, and connect the doorbell to your WiFi and app. We do the smart device, app and low-voltage side of the job. Bring the management office's answer on mounting to the site visit, and we will plan a position that keeps the corridor wall untouched where the building asks for that.

Sources & references

This page is general guidance, not legal advice. Your building's by-laws and the management office's written answer decide what is allowed at your door.

Ready to set up your smart home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Can I install a video doorbell in my condo?
Usually, with the management's agreement. Screwing a bracket into common property and changing the look of the entrance both need written approval under the strata by-laws, so ask the management office first.
Does a condo video doorbell break the PDPA?
The Act exempts data processed only for personal, family or household affairs, so a household doorbell may sit outside it. Nothing official settles the corridor question, and a unit run as a business may be treated differently. Keep the camera on your own doorstep.
Can my neighbour stop me from installing a doorbell camera?
A neighbour cannot approve or refuse it, but a complaint to the management can lead to questions about the mounting and the angle. Talking to the nearest units first avoids most of that.
Where should a doorbell camera go on a condo door?
On your own door or grille, or in the door viewer, rather than on the corridor wall. Each position has its own check, so see the mounting table above.
Do I need power at the door for a video doorbell?
Not with a battery model, which is why most condo owners use one. Do not take power from the corridor lighting; that needs the management's written approval.
Will a video doorbell replace my condo intercom?
No. The guardhouse still uses the intercom to call your unit. Keep the handset and call button working.
Can I record audio with a condo doorbell?
You can, but it picks up corridor conversations. Many owners keep two-way talk for button presses and turn off audio recording for motion clips.

Get a Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides