Five remotes and the wrong input every time? Here is how the TV, soundbar, decoder, lights and curtains are made to act together.
📍 We serve KL, Selangor & Putrajaya.

Home theatre automation means one button, voice command or event that switches on the TV and sound, picks the right input, dims the lights and closes the curtains together. Most of it uses control your equipment already has: HDMI-CEC between the TV and its connected boxes, infrared for older decoders and amplifiers, and an app or hub that ties in lights and curtains. Building the room itself is a different job; this page is about making what is in it behave as one. For the rest of the house, see the smart home hub.
Most living rooms in Malaysia have the same pile of remotes: the TV, an Astro or streaming box, a soundbar or amplifier, the aircon, and sometimes a fan. Watching a film means five button presses in the right order, and anyone who gets the order wrong ends up on the wrong input with no sound.
Automation removes the order. You press one thing and the system does the sequence for you. The useful results are modest and practical: the right input every time, sound that comes on with the picture, lights that drop to a level you chose once, and curtains that close without someone getting up. If you are still planning the room itself, the home theatre and media room guide covers layout, acoustics and cooling.
Every automated home theatre uses one or more of these paths. Knowing which one each device answers to is most of the planning.
| Path | How it reaches the device | Good for | Weak spot |
|---|---|---|---|
| HDMI-CEC | Commands travel along the HDMI cable between TV, soundbar and boxes | Power on/off together, input switching, volume through the soundbar | Each maker implements it differently; some settings switch it off |
| Infrared (IR) | A blaster copies the remote's signal and sends it across the room | Older decoders, amplifiers, projectors, aircon | Needs line of sight; no confirmation the command arrived |
| Network / app | The device joins Wi-Fi or the LAN and takes commands from its app or a hub | Smart TVs, streaming boxes, smart speakers | Depends on the device's app and, often, the internet |
Lights and curtains sit outside these paths. They join the scene through your smart-home app or hub, which is what makes one command reach everything.
Google's help page describes CEC (Consumer Electronics Control) as what allows HDMI devices to be controlled with one remote. With it switched on, casting to the TV changes the input to the streaming box by itself, and certain TVs will even power on. A soundbar on the TV's audio-return port usually follows the TV on and off and takes the volume buttons.
The confusing part is the name. Each TV maker calls CEC something different, so look for these in the TV's settings menu:
| TV brand | What the setting is called |
|---|---|
| Samsung | Anynet+ |
| Sony | BRAVIA Link or BRAVIA Sync |
| LG | SimpLink |
| Panasonic | VIERA Link, HDAVI Control or EZ-Sync |
| Philips | EasyLink |
| Sharp | Aquos Link |
| Toshiba | CE-Link or Regza Link |
Two details from the same page catch people out. A streaming stick must be powered from a wall socket, not from a USB port on the TV, for the power-on trick to work. And some TVs quietly switch CEC off when other settings change, so check it again after a TV software update.
Many decoders, older amplifiers and projectors answer only to their own remote. An IR blaster learns those remotes and sends the same signals, so the box joins the scene like everything else. The catch is line of sight: a decoder behind a solid cabinet door will not hear a blaster across the room. Plan either a glass or open shelf for those boxes or a small emitter placed inside the cabinet.
Choosing and placing a blaster, learning remotes and checking Wi-Fi at the spot are covered in the IR blaster guide.
A scene is a saved list of actions. Write it down the way you would do it by hand, then check every line has a path to its device.
| Step | What happens | Path |
|---|---|---|
| Picture | TV on, correct HDMI input selected | CEC or the TV's app |
| Sound | Soundbar or amplifier on, set to the TV input | CEC, or IR for older amplifiers |
| Source | Streaming box or decoder woken | CEC, or IR for most decoders |
| Lights | Main lights off, a low glow left behind the TV or along the floor | Smart switch, dimmer or bulbs |
| Curtains | Blackout layer closes | Curtain motor through the app or hub |
| Comfort | Aircon to a quieter fan setting | IR blaster or the aircon's own app |
Make a matching “end” scene that turns everything off and brings the lights back up, and a “pause” scene that lifts the lights halfway for a snack run. Those two get used as much as the start scene.
Dimming is where most scenes either feel polished or cheap. There are two routes. Smart bulbs in floor and table lamps dim on their own and need no electrical work. Ceiling downlights and cove lights dim through a smart dimmer or a driver that supports dimming, which sits on the wall circuit.
For smart switches and anything wired into the mains, we supply the devices and set up the app, and the switch or wiring work is done by an electrical contractor registered with Suruhanjaya Tenaga that we coordinate. Some LED downlights flicker or hum at low levels on the wrong dimmer; the smart dimmer and LED flicker guide explains how to match them before you buy.
Afternoon sun on the screen ruins a matinee faster than any setting can fix. A motorised blackout curtain that closes as part of the scene is often the single most noticed upgrade. Battery and plug-in curtain motors can be added to many existing tracks; the smart curtain motorisation guide explains the motor types and what each needs.
A scene needs a trigger. Pick one that suits the whole family, not just the person who set it up.
Which assistant to use for the voice part, and what each understands in Malaysia, is covered in the Google, Alexa or Siri guide.
Google states plainly that automations are for convenience and can depend on working internet, Wi-Fi and the services of every maker involved. In a home theatre that means a few honest limits:
Keep the original remotes in a drawer. For anyone who wants the scene to work with no internet at all, a local hub matters; Home Assistant's HDMI-CEC integration, for example, can power devices on, set them to standby and pick the active input from a CEC-capable computer, and its documentation notes that all Raspberry Pi models support CEC natively.
Automation is easiest when a few things are decided while the TV wall is still open.
Any mains electrical work, such as a new power point, a change at the distribution board or a hardwired switch that needs new wiring, must be done by an electrical contractor registered with Suruhanjaya Tenaga.
If you also want music in other rooms from the same system, the multi-room audio guide takes it from there.
We install IR blasters and battery or plug-in curtain motors, turn on and test CEC across your TV, soundbar and boxes, and set up the scenes, buttons and voice commands in one app. We do the smart device, app and low-voltage side of the job. Where a scene needs dimmers or new power, we will say so at the visit and explain who does that part.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.