Stop guessing which appliance pushed up the bill: the three ways to see your electricity use, and how to turn what you find into schedules.
📍 We serve KL, Selangor & Putrajaya.

A smart energy monitor shows where your electricity goes, appliance by appliance or as a live whole-house reading, so you can see what is pushing up the TNB bill instead of guessing. There are three layers: the myTNB app, which shows daily and monthly use for homes with a TNB smart meter; plug-in smart plugs that measure one appliance each; and clamp monitors that read the whole house from inside the distribution board, which is electrical work. Most homes get the answers they need from the first two. If the bill has already jumped, start with the high electricity bill guide.
Your TNB bill tells you one thing: how much the whole house used over the billing period. It cannot say whether that was the aircon in the master bedroom, a water heater left on all day or an old fridge running harder than it should. Smart energy tracking fills that gap at three levels of detail.
| Layer | What it shows | What it needs | Best for |
|---|---|---|---|
| myTNB app | Whole-house use by day and month | A TNB smart meter on your account | Spotting which days were heavy |
| Energy-monitoring smart plug | One appliance, live and over time | A socket and WiFi or a hub | Fridges, washers, TV cabinets, portable appliances |
| Clamp (CT) monitor | The whole house live, sometimes per circuit | Sensors clipped inside the distribution board | Seeing every load at once, homes with solar |
| Appliance’s own app | Use reported by a connected aircon or heater | A model with that feature | The single biggest loads, where supported |
Think of them as a funnel. The app tells you that Tuesday was expensive; a plug tells you whether the fridge is to blame; a clamp monitor tells you everything at once but asks more of the installation.
If TNB has fitted a smart meter at your home, TNB says the myTNB app can show your daily and monthly electricity usage, and that you can set an Energy Budget and be alerted as you approach it. That costs nothing extra and is the right first look. Check the day after a heavy use pattern, such as a hot weekend with every aircon running, and you start to see what normal looks like for your home.
What the app cannot do is split that total by appliance. It also shows the meter’s view, which is the reading your bill is built on, so treat it as the reference that everything else is checked against. For questions about the meter itself, a blank display or a swap, the TNB smart meter guide covers TNB’s side.
A smart plug with energy monitoring sits between the socket and the appliance and reports how much power it draws, live and as a running total. Plug the fridge into one for a week and you know what it really uses; move it to the washing machine, the TV cabinet or a dehumidifier next. Because nothing is opened or wired, it is the easiest way to start, and it moves house with you.
The plug also becomes a switch, which is where the savings come from later: an appliance you can see and control is one you can schedule.
A clamp monitor uses current sensors, often called CT clamps, that close around the incoming cables. They read the whole house as it happens, and some models read selected circuits too, so you can watch the total jump when the water heater starts. Homes with rooftop solar use them to see generation and consumption side by side.
The catch is where they go. The clamps sit inside the distribution board, around live conductors, and the monitor usually needs its own power from the board as well. Opening the board and adding anything to it is work on the electrical installation. Any mains electrical work, such as a new power point, a change at the distribution board or a hardwired switch that needs new wiring, must be done by an electrical contractor registered with Suruhanjaya Tenaga.
For smart switches and anything wired into the mains, we supply the devices and set up the app, and the switch or wiring work is done by an electrical contractor registered with Suruhanjaya Tenaga that we coordinate. The TNB meter and its seals on the meter board are TNB’s equipment; a clamp monitor is always fitted on your side of the meter, never on the meter itself.
Two values appear in almost every energy app. One is power: how hard something is drawing right now. The other is energy: how much it has used over time, the figure your bill is built on. A kettle draws a lot of power for a few minutes and uses little energy; a fridge draws little power but runs all day and night. Confusing the two is the most common mistake.
The most revealing number is the overnight base load: what the house draws at three in the morning when everyone is asleep. Fridges, routers, the water pump and devices on standby add up to that floor. If it is higher than you expect, walk round with a plug and find out which device keeps it up.
| What the data shows | Usual cause | What to do |
|---|---|---|
| Steady use all night, every night | Aircon in several rooms, or a water heater kept hot | Schedules and set-points; heater timer |
| Short regular spikes with nobody home | Fridge, or a water pump cycling | A pump that cycles with all taps shut points to a leak |
| A high floor even in the day | Old fridge or freezer, many devices on standby | Measure each with a plug; switch off what does not need to run |
| Big jump on hot weekends only | Aircon use | Normal; compare like-for-like weeks |
| A rise that never drops back | An appliance that changed: a failing fridge seal, a heater thermostat | Measure the suspect; repair or replace |
Seeing the use is half the job; the other half is letting the smart home act on it:
Keep every automation reversible by hand, and check what each plug does after a power cut; the power cut guide explains why some devices come back off and others come back on.
Many apps let you enter a price per unit so they can show cost instead of energy. Take that rate from your own latest TNB bill or TNB’s published tariff, not from the app’s default, which is often set for another country. The bill also carries charges that a plug knows nothing about, so the app’s cost figure is a guide to which appliances matter most, not a copy of the bill.
This page deliberately quotes no tariff rates. They change, and the right figure is always the one on your current bill.
Plugs and clamp monitors are good enough to rank your appliances and spot changes, but they are not billing meters. If a plug and the TNB figure disagree, the TNB meter is the record your bill follows; a suspected meter fault is reported to TNB.
Energy data shows when the house is empty, so keep the app account secured and in your own name. And ignore anyone selling a device that “slows the meter” or offering to adjust it: interfering with the meter installation is an offence, and no legitimate energy monitor touches the meter.
We supply and set up energy-monitoring plugs on the appliances you want to check, link them to your app or hub, add schedules for standby loads and alerts for long runs, and connect them to aircon and water heater routines. We do the smart device, app and low-voltage side of the job. For other smart home work, see our smart home installation service.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.