New Condo: First Renovation After VP (Order, Rules & Cost)
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏢 Condo

New Condo: Your First Renovation After VP
Order of Work, Management Rules & Cost (2026)

Keys in hand and a bare unit: what to do first, what to leave alone, and the order that avoids paying twice.

📍 We serve KL, Selangor & Putrajaya.

Bare new condo unit after handover with new floor tiles and an empty kitchen space

For a new condo, the first renovation follows a set order: inspect and report defects, get the management's renovation approval and pay the deposit, then do the hidden work first (extra sockets, lighting points, aircon piping and any ceiling), followed by carpentry such as the kitchen and wardrobes, and finally the loose finishes. Keep the developer's tiles and sanitaryware unless you have a reason to replace them, because hacking new finishes costs money and can complicate defect claims. ClickBina's condo cost guide puts kitchen cabinets and worktop at RM12,000–RM30,000, often the biggest single item.

Why a new condo is renovated differently

A new condo arrives with tiled floors, bathrooms fitted, a basic kitchen or an empty kitchen space, and bare walls and ceilings. Unlike an old unit, nothing is worn out, so the job is not to repair but to fit the unit out for how you will live: storage, lighting, aircon, a usable kitchen and some character.

Two things make it different from renovating an older condo. The developer is still responsible for defects for a period after vacant possession, so your work must not bury or confuse a defect. And the building is new, so management is often strict and many owners renovate at the same time, which affects lift bookings and working hours. Owners of landed homes have a separate guide: ClickBina's first renovation guide for new terrace houses covers extensions and council rules that do not apply in a condo.

Step one: record defects before any work

Before a single hole is drilled, inspect the unit and report every defect to the developer in writing. ClickBina's new condo VP inspection checklist goes room by room, from ponding tests in the bathrooms to the electrical points and the aircon ledge.

Then decide what can start while the developer is still fixing things. ClickBina's guide to renovating during the defect liability period explains why renovating early can weaken a claim and which works can go ahead safely. As a rule, anything that covers the developer's work, such as new flooring over tiles, cabinets over a wall with a suspected crack or a false ceiling under a leaking slab, waits until that defect is fixed.

The management's rules: permit, deposit and hours

In a new building, the developer or the joint management body usually runs the building at first, and every renovation needs its written approval. Expect a renovation application with a floor plan and scope, the contractor's details, a refundable renovation deposit and a set of house rules. ClickBina's condo cost guide puts the renovation deposit at usually RM1,000–RM5,000, refundable if there is no common-area damage.

Read the rules before you design anything, because they shape the scope. Many buildings fix the design of window grilles and balcony enclosures so the facade stays uniform, control where aircon condensers may sit and restrict hacking and working hours. ClickBina's condo renovation hours guide explains how working hours and deposits are set and enforced.

What to keep from the developer's finishes

New tiles, bathrooms and doors are rarely worth hacking out on day one. Replacing them costs money, creates noise and debris in a building where everyone is renovating, and can make it harder to claim for a defect the developer should have fixed. Most owners keep the floors and bathrooms and spend on the things the developer did not provide.

Developer itemUsual approachWhy
Floor tilesKeep; add rugs or overlay later if neededNew, under defect cover, costly to hack
Bathrooms and sanitarywareKeep; upgrade taps, mirrors and accessoriesWaterproofing is under defect cover
Basic kitchen or empty kitchen spaceReplace or fit new cabinets and worktopUsually the biggest upgrade
Bare walls and ceilingsAdd lighting points, optional plaster ceiling, paintHidden work must come first
Doors and windowsKeep; add grilles to the approved designFacade rules often apply

If you bought with a developer upgrade package, check what it already covers before you plan. ClickBina's developer package vs own contractor guide compares the two routes.

What new condo owners usually do first

With the rules known, most first renovations in a new condo cover the same short list:

  • Security: window and door grilles to the management's approved design.
  • Aircon: units and piping routes planned before any ceiling or carpentry closes off the wall.
  • Electrical points: extra sockets for the kitchen, bedside and work desk, and points for lights.
  • Ceiling and lighting: a plaster ceiling or cove in the living area, or simple downlights.
  • Kitchen: cabinets, worktop, hob and hood, often with a wet and dry split if space allows.
  • Storage: built-in wardrobes and a TV console.
  • Finishes: paint, curtains or blinds, and loose furniture last.

The right order of work

The order matters more than the list, because each stage hides the one before it:

  1. Inspect the unit, report defects and wait for the developer's repairs on anything you will cover.
  2. Fix the design and submit the renovation application; pay the deposit once approved.
  3. Grilles, if the approved design is known, so the unit is secure while materials are on site.
  4. Hidden work: new electrical points and wiring, aircon piping, and any plumbing changes in the kitchen.
  5. Ceiling: frame, boards and lighting points brought through.
  6. Carpentry: kitchen cabinets and worktop, wardrobes and TV console, installed on the finished floor.
  7. Painting and touch-ups after the carpentry is in.
  8. Aircon indoor units mounted and connected, lights and sockets fitted, then a final clean.

ClickBina's kitchen renovation step-by-step guide shows the same logic inside the kitchen, where the hob and sink positions are fixed before any cabinet is drawn.

Aircon piping: plan it before anything closes

Aircon is the item most often planned too late in a new condo. The condenser position is usually fixed by the building's ledge, so the question is how the refrigerant pipes and drain run from each room to it. Concealed piping looks tidy but has to go in before the ceiling and carpentry; surface trunking can be added later but shows on the wall. If the developer pre-installed piping, ClickBina's guide to checking pre-installed aircon piping explains what to test before relying on it.

Decide the number and position of the indoor units at the design stage, and mark the routes on the drawing. A wardrobe built across the only pipe route, or a ceiling closed before the drain was laid to fall, is an expensive fix.

Kitchen and built-ins

Carpentry is usually the largest share of a new condo's first renovation. The kitchen comes first in most budgets, followed by wardrobes and a TV console. Because the floor and walls are new and level, installation is usually straightforward, but measure after any defect repairs, so the cabinets fit the walls as they finally stand.

For design ideas suited to compact units, ClickBina's condo interior design guide covers layouts, storage and lighting for new condos.

What a first renovation costs

The figures below are quoted unchanged from ClickBina's condo renovation cost guide. They are the items most new condo owners spend on first:

ItemIndicative cost (Klang Valley, 2026)What moves the number
Kitchen cabinets and worktopRM12,000–RM30,000Laminate vs quartz top; run length
Built-in wardrobes and TV consoleRM8,000–RM22,000Feet run of carpentry, door type
Plaster ceiling, cornice and cove lightingRM6,000–RM14,000Area covered, design complexity
Electrical add-onsRM3,000–RM10,000Number of new points
Aircon supply and installRM4,000–RM12,000Number of units, piping runs
Renovation deposit (refundable)RM1,000–RM5,000Building's house rules

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Because the floors and bathrooms are usually kept, a new condo's first renovation often costs less than a full renovation of an older unit of the same size: the money goes into carpentry, lighting and aircon rather than hacking and wet works.

Doing it in stages without paying twice

Many owners cannot or do not want to do everything at once. That is fine, as long as the hidden work comes first. Run the extra electrical points and aircon piping, and decide on the ceiling, in the first round, even if the wardrobes and feature walls wait. Adding wiring after a ceiling is closed or after carpentry is built means opening finished work.

A sensible split is: round one, defects, grilles, wiring, aircon piping, ceiling and kitchen; round two, wardrobes and TV console; round three, decorative extras. Each round needs its own management approval, so keep the drawings from round one.

How ClickBina can help

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so a new condo's first fit-out can be planned and sequenced as one job around the management's rules. WhatsApp us your job details for a quote: area or project, unit size and the work you have in mind. We reply within the hour, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina condo renovation cost guide — item costs and the renovation deposit range.
  • ClickBina new condo VP inspection checklist and renovating during the DLP guide — defects before works.
  • ClickBina developer upgrade package guide — package vs own contractor.
  • ClickBina condo renovation hours guide — management approval, deposits and working hours.

How we price: every figure is quoted unchanged from the ClickBina guide named above; they are indicative Klang Valley ranges, not quotes. Building rules differ, so check your own management's house rules before designing.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What should I do first in a new condo?
Inspect the unit and report defects to the developer in writing, then get the management's renovation approval. Hidden work such as wiring and aircon piping comes before ceilings and carpentry.
Can I renovate my new condo during the defect liability period?
Yes, with care. Record defects first and let the developer fix anything your renovation would cover; loose and non-invasive work can go ahead.
Should I replace the developer's floor tiles?
Usually not on day one. They are new and under defect cover, and hacking adds cost and noise. Most owners spend on carpentry, lighting and aircon instead.
Do I need management approval to renovate a new condo?
Yes. Expect a renovation application with a floor plan and scope, contractor details, house rules and a refundable renovation deposit.
How much is the renovation deposit for a new condo?
ClickBina's condo cost guide puts it at usually RM1,000–RM5,000, refundable if there is no common-area damage.
How much does a new condo kitchen cost?
ClickBina's condo cost guide puts kitchen cabinets and worktop at RM12,000–RM30,000, depending on the top material and run length.
Can I renovate a new condo in stages?
Yes, if wiring, aircon piping and the ceiling are done in the first round, so later carpentry does not mean opening finished work.