New Condo VP Inspection Checklist Malaysia: Room by Room
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔑 VP Inspection

New Condo VP Inspection Checklist
Room by Room, Before You Send the Defect List (2026)

What to test in every room of a new condo at key collection, and which defects go to the developer or the JMB.

Pouring water toward the floor trap during a new condo bathroom VP inspection

Check a new condo at vacant possession (VP) room by room, test everything that runs on water or power, and send the developer one numbered, written defect list. Under the statutory sale and purchase agreement the defect liability period is 24 months from the date you take vacant possession, and in a strata unit it covers your parcel, the building and the common property. Inside the unit the claim is yours; lobbies, lifts and the facade go through the JMB or MC. Start before any renovation, and keep dated photographs of every room, including the ones with nothing wrong.

Parcel vs common property: what is yours to check

A condo has two sets of defects, and they are claimed by different people. Everything inside your parcel — walls, floors, wet areas, windows, the developer's fittings — is yours to list and send to the developer. Lobbies, corridors, lifts, the roof, the facade and the car park are common property, and the common property defects guide explains that the JMB or MC claims those for all owners. ClickBina's handover guide quotes the statutory wording: under Schedule H the 24-month defect liability period covers the parcel, the building and the common property.

AreaWhose listWhat you do on VP day
Inside your unit, including the balcony and yardYoursInspect, record and list every item
Your unit's external wall face and window sealsYours (it affects your parcel)Check from inside; note staining under window heads
Riser or shaft behind your bathroomUsually common propertyNote any staining you can see from your side
Corridor, lift lobby, car park bayJMB or MCNote it and pass it to the management or committee
Roof above a top-floor unitCommon propertyInspect your ceiling closely; report what reaches your unit

Before you go: VP letter, keys and meter readings

Find the VP date on the developer's letter and write it down: it starts the defect clock. The vacant possession and handover guide covers the paperwork and what to ask before you sign anything. Bring a torch, a bottle of water, tissue, a tape measure, a plug-in socket tester, a coin for tapping tiles and a phone with the date stamp switched on. Before you touch anything, photograph every room wide, then read and photograph the water and electricity meters. If you are asked to sign a form confirming the condition, list your defects on the face of it first.

Living and dining

Walk the room slowly with the torch held flat against each wall and the ceiling. Raking light shows patched plaster, uneven skim, paint drips and a freshly painted square that hides an earlier repair. Tap the floor tiles with a coin: a hollow, drummy sound means the tile is not fully bonded. Open and close the main door and any sliding door to the balcony, check the lock and the gap round the frame, and look along the skirting for gaps and chipped corners.

Bedrooms

Each bedroom gets the same treatment: walls and ceiling under raking light, floor tapped, window opened, closed and locked, and the window track filled with a little water to see whether it drains outward. Look under the window head for staining and along the sill for gaps in the sealant. Check every light point and switch, and every socket with the tester. If the developer supplied wardrobes, open every door and drawer and check the hinges and the finish.

Kitchen and yard

Run the sink tap hot and cold, look under the sink for drips at the joints, and fill the sink to watch it drain. Pour water on the yard floor and watch where it goes: it should reach the floor trap and leave nothing behind. Check the cabinets the developer supplied, the worktop joints and the sealant line along the backsplash. If the unit has pre-installed aircon piping, ask for the developer's test records before anyone connects a unit to it.

Bathrooms: ponding, traps and the ceiling below

Bathrooms are where the expensive defects hide. Pour water at the far corner of each shower and watch it run to the trap; a flat or back-falling screed leaves a puddle. Run each floor trap with a bucket of water and listen for gurgling or slow clearance. Flush every toilet, check the cistern refills and stops, and look behind the pedestal for drips. Press the skirting and the base of the wall outside each bathroom: sound plaster is hard, damp plaster gives. The handover water damage check sets out every water test in order.

Balcony and aircon ledge

Pour water at the balcony door line. It must run away from the room, never toward it, and the threshold should sit above the balcony floor. Check the railing is firm, the floor trap is clear and the aircon ledge drains outward. Look at the sleeve where the aircon pipes pass through the wall: an unsealed gap there lets rain into the wall.

M&E: DB board, sockets and water points

Open the DB board and check every circuit is labelled. Press the test button on the earth-leakage breaker (RCCB): it should trip at once. Then plug the socket tester into every power point, room by room, and try every switch, light point, fan point, water heater and the doorbell or intercom. On the plumbing side, run all the taps together to compare pressure, and finish with the meter test: close everything, photograph the water meter, wait, and photograph it again. Movement means water is going somewhere it should not.

RoomTestWhat fails it
Every roomRaking light on walls and ceilingPatch repairs, cracks, staining, uneven paint
Every roomCoin tap on floor tilesHollow or drummy sound, cracked tiles, wide grout gaps
Bathrooms, yard, balconyPour test to the floor trapWater ponding or running toward the door
BathroomsBucket down each trap; flush each toiletSlow drain, gurgling, a cistern that keeps running
Windows and sliding doorsWater in the trackWater draining inward, missing sealant
DB boardRCCB test button; circuit labelsNo trip, unlabelled circuits
Every power pointPlug-in socket testerDead socket or a fault light on the tester
Whole unitWater meter, everything offThe meter moves

What to leave to the JMB list

You will see things outside your door that are wrong: a cracked corridor tile, a lift that judders, a stained lobby ceiling. Note them, photograph them, and pass them to the management office or the JMB, which makes one consolidated claim for the building. Keep them off your own parcel list so the developer cannot argue about whose item it is. If water from the common property reaches your unit, the stain inside is still yours to record.

Writing it up for the developer

Number every item and give the room, the exact spot, what you saw and the photo reference: for example, "Item 7: master bathroom, floor ponds at the corner by the door, photos 41 to 43". Group water items together so they can be inspected in one visit. Submit the list in writing, keep proof of delivery, and use the developer's defect portal as well if there is one. The handover guide quotes the statutory wording that the developer must make good within 30 days of receiving your written notice. To build the list as you walk, tick your defects room by room with ClickBina's checklist tool. The guide to claiming new-house defects covers follow-up letters and what to do if the developer stalls.

When to bring an inspector

A careful owner with this checklist finds most finishing defects. It is worth bringing someone when the risk is concentrated: a top-floor unit, large balconies or planters, a unit where you already saw staining, or when you cannot take an afternoon off. ClickBina offers a defect inspection service in KL & Selangor: we inspect the unit, write the numbered defect list with photo references, and can carry out the rectification the developer does not cover. If we find signs of a leak, leak detection is a separate visit at RM300 – RM800. A site visit to price repair works is arranged on WhatsApp, and any fee is confirmed before we come. We reply within the hour, we are registered with SSM, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina handover water damage check — the verified statutory wording (24 months from vacant possession; 30 days of written notice; Schedule H covers the parcel, the building and the common property) and the pour, flow, meter and raking-light tests.
  • ClickBina common property defects guide — the JMB or MC claims common property for all owners.
  • ClickBina defect inspection guide — testing every power point and tapping tiles for hollowness.
  • ClickBina after-storm home checklist.
  • ClickBina handover water damage check — leak detection at RM300 – RM800 per visit.

Methodology: this checklist is general guidance, not legal advice. Your own sale and purchase agreement and dates govern your claim; ask the solicitor who acted on your purchase about anything you are asked to sign.

Ready to book a defect inspection?

WhatsApp us your unit type, size and VP date for an inspection quote — we reply within the hour.

💬 WhatsApp us to book an inspection
Reply within the hourRegistered with SSMFlat price, no hidden charges

Common Questions

What should I bring to a condo VP inspection?
A torch, a bottle of water, tissue, a tape measure, a plug-in socket tester, a coin for tapping tiles and a phone with the date stamp on. Photograph the meters before you start.
How long is the defect liability period for a new condo?
24 months from the date you take vacant possession, under the statutory sale and purchase agreement. In a strata unit it covers the parcel, the building and the common property.
Should I list corridor and lobby defects on my own list?
No. Note them and pass them to the management or the JMB, which claims common property for all owners. Keep your own list to your parcel.
Can I sign the handover form if I found defects?
List the defects on the face of the form before you sign, keep a copy, and ask the solicitor who acted on your purchase if you are unsure what the form does.
How do I test for hidden water leaks at VP?
Close every tap and cistern, photograph the water meter, wait, and photograph it again. Any movement means water is escaping somewhere.
How long does the developer have to repair defects?
The statutory wording quoted on ClickBina's handover guide says the developer must make good within 30 days of receiving your written notice.
Should I renovate before the defects are fixed?
No. Submit the list and let the developer rectify first; altering finishes makes later claims harder to prove.