Paint, Plaster & Tile Finish Defects at VP: What's Acceptable
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🔎 Defect Inspection

Paint, Plaster & Tile Finish Defects at VP
What Counts as a Defect & How to Record It (2026)

A room-by-room standard for finishes at key collection, so your defect list holds up when the developer reviews it.

Torch beam raking across a new tiled floor showing a raised tile edge marked with blue tape

At vacant possession (VP), a finish defect is workmanship that falls short of a reasonable handover: paint that is patchy, streaked or splashed, plaster that sounds hollow or has cracks wider than a hairline, tiles that are hollow, chipped or stand proud of their neighbours, and ceiling joints that show or sag. Faint marks you can only see from a ladder are borderline, but list them anyway: the Defect Liability Period (DLP) runs 24 months from VP and repairs inside it are the developer's cost. ClickBina's guides treat tile lippage of more than 2 mm as typically a defect. ClickBina inspects new homes, writes the defect list and can carry out the rectification; a site visit for repair quotes is arranged on WhatsApp, and any fee is confirmed before we come.

Defect or acceptable workmanship?

No new house is perfect, and no developer will repaint a whole wall because of one speck of dust in the paint. The useful question is not “is it perfect?” but “would a careful tradesman have accepted this?”. A finish that a careful painter, plasterer or tiler would have redone before leaving site is a workmanship defect, and workmanship defects are exactly what the DLP exists for. The defect liability period guide explains the 24-month window and how written notice works.

Finish defects matter more than they look. Hollow plaster and hollow tiles get worse with time; paint over damp fails from behind; a tile edge that stands proud chips and trips. They are also the items most often argued about, because “it looks fine to me” is easy to say about a finish. A clear standard, applied the same way in every room, takes that argument away.

FinishUsually a defectUsually acceptable or borderline
PaintPatchy coverage, old colour showing through, runs and drips, splashes on fittings, roller marks in raking lightA single speck, a faint mark visible only from a ladder
Plaster and skim coatHollow sound when tapped, bulges, cracks across the wall, cracks that widenFine hairline shrinkage at a column-to-wall joint (list it, but expect a cosmetic repair)
Floor and wall tilesHollow tiles, cracked or chipped tiles, lippage of more than 2 mm, missing or cracked groutVery slight shade variation within one batch
CeilingsVisible board joints, cracks along joints, sagging boards, water stainsHairline at a cornice that does not move
Doors, frames and skirtingGaps at frames, damaged edges, paint on hinges and locks, loose skirtingSmall filler marks that are painted flush

Paint: patchiness, drips, splashes and colour mismatch

Most paint defects come from too few coats, painting over an unprepared surface, or rushing the last coat. Walk each room with the main light off and a torch held flat against the wall. Patchy areas, where the wall looks dull in one place and sheen in another, usually mean an uneven last coat. Runs and drips at the top of a wall or around a socket plate mean the paint was laid on too thick. Paint on switch plates, hinges, door handles, tiles and window frames is careless masking.

Colour mismatch shows up where touch-ups were done with a different batch or a different sheen: a square of slightly different colour on an otherwise even wall. List the wall, not just the patch, because a fresh touch-up over a touch-up usually makes it worse. The painting contractor guide explains what an even finish should look like and why preparation decides it.

One warning: paint that bubbles or peels in a band low on a wall, under a window or next to a bathroom is not a paint defect. It is a water defect showing through paint, and it belongs on the list as a possible leak. The handover water damage check sets out how to tell a leak from construction moisture drying out.

Plaster and skim coat: hollow areas and hairline vs real cracks

Tap the walls with a coin or the back of a key, working in a grid. Sound plaster gives a short, solid knock; hollow plaster sounds dull and drummy, and the edge of the hollow area is where the sound changes. Mark the outline lightly in pencil. Hollow plaster is a bond failure, not a cosmetic issue, and the hollow plaster guide explains why it tends to spread.

Cracks are where most arguments start. Fine hairline cracks at the joint between a brick wall and a concrete column, or at the corners of openings, are common as new materials dry out; list them, but expect a cosmetic repair. Diagonal cracks from door or window corners, cracks across beams or slabs, and any crack that keeps growing are different. ClickBina's guide to cracks in a new house says to call an engineer when a crack is wider than about 3 mm or visibly growing, and to mark both ends with a date so movement can be shown later.

Also look along walls with a torch held flat. Waves, bumps and trowel marks in the skim coat show up as shadows. A wall that is visibly not flat in raking light is a workmanship item, even if it has been painted.

Floor and wall tiles: hollow, lippage, chips and grout gaps

Tiles are the finish most worth checking carefully, because a hollow tile that is not on the list now becomes your cost later. Tap every floor tile in the middle and at each corner. ClickBina's popped and hollow tiles guide explains the tap test in detail: a solid knock means a full bed of mortar, a hollow ring means a void, and a cluster of hollow tiles points to a laying or water problem rather than bad luck.

Then look across the floor at a low angle with a torch on the floor. Lippage, where one tile edge stands higher than the next, catches the light and the feet. ClickBina's large-format tiling guide notes that a big tile turns a small ripple into visible lippage, and treats more than 2 mm between tiles as typically a defect.

What you findHow to checkWhat to write on the list
Hollow tileTap the middle and four corners; listen for a ringing soundRoom, location, number of hollow tiles; mark each with tape
LippageTorch flat on the floor; run a fingernail across the jointRoom and joint; note if more than 2 mm
Chipped or cracked tileLook closely at edges and corners, especially at doorwaysRoom, location and tile count
Grout gaps or cracksLook along every joint, especially in wet areasRoom and line; mention if in a shower area
Uneven wall tilingLook along the wall from one end; check corners and cut tilesWall and room

In bathrooms, grout gaps and cracked tiles are also water paths, so list them as possible leak points, not just finishes.

Ceilings: board joints, stains and sag

Plasterboard ceilings show their workmanship at the joints. With a torch held close to the ceiling, look for visible joint lines, tape edges, screw heads that show through and cracks running along the joints. Look along the ceiling from a corner of the room for any board that dips. A sagging board, or a crack that follows a joint across the room, is a defect to list.

Any stain or ring on a ceiling is a water question first and a finish question second. Under a bathroom, balcony or roof, treat it as a possible leak and write down where it is. Painting over it hides the evidence the developer needs to see.

Doors, frames and skirting

Finishes around doors are easy to miss because the door itself works. Check that the frame is painted or sealed all round, including the top edge, that there are no gaps between frame and wall, that hinges and locks are free of paint, and that the door edge is not chipped. Skirting should be fixed tight to the wall, with neat joints at corners and no gaps under it. A gap opening under a skirting can also be a sign of movement; the cracks guide covers that.

Window frames and sills deserve the same look: sealant should be continuous, neat and not smeared over the glass, and paint should stop cleanly at the frame.

How to record finish defects: light angle and labels

A finish defect that cannot be shown later is a finish defect that gets argued about. The trick is the light. Finish defects are almost invisible in flat, overhead light and obvious in raking light, so hold a torch flat against the wall or floor and record the defect with the light coming across it, not from behind you.

  • Label each item with a number and stick a small tape marker on the defect so the developer's team finds the same spot.
  • Record one wide view showing where the defect is in the room, then one close view with the light raking across it.
  • Put a coin or ruler beside cracks and lippage so the size can be read.
  • Write the room, wall or floor area and what is wrong in plain words: “Master bedroom, wall behind door, hollow plaster about the size of a hand”.
  • Keep the date on everything; the DLP clock runs from VP.

If you would rather not do this room by room on your own, tick your defects room by room with ClickBina's defect checklist and keep the list with your records.

What developers usually push back on

Expect some items to come back marked “acceptable” or “not a defect”. The ones most often disputed are hairline cracks, slight shade differences between tiles, faint paint marks and anything the developer thinks was caused after handover. Three habits make those arguments shorter.

  1. Report everything in writing inside the DLP, including small items; the developer typically has 30 days to make good after written notice, according to ClickBina's HDA rights guide.
  2. Do not renovate, retile or repaint over a reported finish defect before it is repaired: once you alter a finish, the developer can argue the defect was yours.
  3. Re-check every repaired finish in raking light. Patch repairs to paint and plaster are where a second round of defects usually comes from.

If items are refused or repairs keep failing, the guide to developers who won't fix defects covers written notices and escalation, and ClickBina's HDA rights guide notes that the homebuyer tribunal hears claims of up to RM50,000.

After the DLP: what finish repairs cost

Inside the DLP, finish repairs are the developer's to do. After it, they are yours. These indicative Klang Valley figures (2026) from ClickBina's published guides give a sense of scale:

ItemIndicative priceSource guide
Internal skim coat over existing plasterRM1.50 – RM4.00 per sq ftCracks in a new house guide
Single room skim coatRM600 – RM1,200Cracks in a new house guide
Supply and lay new floor tilesRM12 – RM30 per sq ftPopped and hollow tiles guide
Hack out old tiles and dispose of debrisRM1.50 – RM3 per sq ftPopped and hollow tiles guide
Leak detection and assessment, if water is behind a finishRM300 – RM800 per visitHandover water damage check

Want an inspection quote for your unit?

WhatsApp us your unit type, size and VP date for an inspection quote — we reply within the hour.

💬 WhatsApp us to book an inspection
Reply within the hourRegistered with SSMFlat price, no hidden charges

Painting after repairs, access for high walls and any work an engineer specifies are priced separately. That gap between “the developer's cost” and “your cost” is the reason to list finishes thoroughly while the DLP is running.

When to book an inspection

Book before you submit your first defect list, ideally before key collection paperwork is signed off, and again before the DLP ends if new finish defects have appeared. ClickBina's defect inspection service in KL & Selangor covers new condos and landed houses: we inspect every room, write the numbered defect list for you to submit to the developer, and can carry out the rectification ourselves for anything outside the developer's scope or left unrepaired after the DLP.

WhatsApp us your unit type, size and VP date for an inspection quote. We reply within the hour, quote a flat price with no hidden charges, and are registered with SSM. If you also want repairs priced, any visit fee is confirmed with you on WhatsApp before we come.

Separately, where water is suspected behind a finish, ClickBina's leak detection is charged on its own at RM300 – RM800 per visit.

Sources & methodology

  • ClickBina cracks in a new house guide — crack types, the 3 mm engineer threshold, skim coat prices, site visit fee.
  • ClickBina popped and hollow tiles guide — the tap test, hollow tiles as workmanship defects, tiling prices.
  • ClickBina large-format tiling guide — lippage and the 2 mm defect line.
  • ClickBina handover water damage check — raking light, construction moisture, leak detection fee.
  • ClickBina HDA homebuyer rights and defect liability period guides — the 24-month DLP, written notice, typical make-good time, tribunal limit.

Methodology: every RM figure is quoted unchanged from the ClickBina guide named beside it; they are indicative 2026 Klang Valley ranges, not fixed rates. The defect-or-acceptable lines are practical guidance, not a statutory standard; your SPA and the developer's own specification decide disputes. This page is general information, not legal advice.

Booking a defect inspection?

WhatsApp us your unit type, size and VP date for an inspection quote — we reply within the hour.

💬 WhatsApp us to book an inspection
Reply within the hourRegistered with SSMFlat price, no hidden charges

Common Questions

Are hairline cracks in a new house a defect?
Fine hairline cracks at column-to-wall joints are common as materials dry, but list them anyway; inside the DLP the developer repairs them. Cracks wider than about 3 mm, diagonal or growing need an engineer's view.
How much lippage between tiles is acceptable?
ClickBina's guides treat lippage of more than 2 mm between neighbouring tiles as typically a defect. Check with a torch flat on the floor.
How do I find hollow tiles and hollow plaster?
Tap with a coin or key. A short solid knock is sound; a dull or ringing sound means a void. Mark each hollow area.
Is patchy paint a defect?
Yes, when the coverage is uneven, the old colour shows through or touch-ups stand out in raking light. A single speck is not worth listing.
Should I repaint before the developer fixes defects?
No. Altering a finish lets the developer argue the defect was yours. Get repairs done and re-checked first.
How long does the developer have to fix finish defects?
The DLP is 24 months from VP. After written notice, ClickBina's HDA guide says the developer typically has 30 days for standard defects.
Does ClickBina inspect finishes at VP?
Yes. We inspect, write the defect list and can carry out rectification. WhatsApp us your unit type, size and VP date for an inspection quote.

Book a Defect Inspection

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote