Browse 12 wet kitchen ideas by layout, style and home type, then see what each kind of build costs.
📍 We serve KL, Selangor & Putrajaya.

A good wet kitchen design starts with how you cook, not how it looks. Heavy wok cooking needs a strong hood ducted outside, a floor that drains and cabinets that do not swell in steam and water. Most terrace houses use a galley or U-shaped room at the back; condos often separate the wet side with a glass partition; semi-Ds and bungalows may build a rear extension. Use the filters below to narrow the 12 concept designs by style or home type.
Each design below is an illustrative concept render, grouped by style and by the home it usually suits. Tap any image to enlarge it. Every card links to the ClickBina guide that prices or explains that part of a wet kitchen, so you can turn wet kitchen ideas into a realistic plan.
12 designs shown
Illustrative concept design · Modern · Terrace
A narrow galley with white flat-door cabinets and bar handles on both sides: gas hob, rice cooker and chimney hood on the left, the sink with a black tap on the right, grey tiles and a glass door to a balcony at the end.
💬 WhatsApp us about this design
wet kitchen cost by scope →Illustrative concept design · Modern · Terrace · Semi-D
A roomy U-shaped kitchen with sage green shaker doors and a white top: the sink and a dishwasher sit on the left run, the gas hob, built-in oven and chimney hood on the right, and a wide window fills the end wall.
💬 WhatsApp us about this design
wet and dry kitchen layouts →Illustrative concept design · Minimalist · Condo
Full-height black-framed glass panels separate the dry side from a white wet kitchen behind, where the gas hob, sink and black tap sit under a dark hood panel and a lit splashback.
💬 WhatsApp us about this design
glass partition wet kitchen costs →Illustrative concept design · Modern · Semi-D
A long rear-extension kitchen under a glass ridge skylight, with grey-white shaker cabinets, a double sink under side windows, a hob and chimney hood on the right, a terrazzo floor and glass doors to the garden.
💬 WhatsApp us about this design
kitchen layout types →Illustrative concept design · Industrial · Terrace · Semi-D
A stainless steel worktop on a steel frame with open shelves and drawers below, the gas hob and sink set into the same top under a big stainless hood, with grey wall panels and tall cabinets opposite.
💬 WhatsApp us about this design
wet kitchen budget ranges →Illustrative concept design · Classic / retro · Terrace
Green glazed square tiles cover the walls of a galley with cream gloss cabinets on both sides, a hob under a chimney hood on the left, the sink on the right and a terrazzo floor.
💬 WhatsApp us about this design
wet and dry kitchen planning →Illustrative concept design · Minimalist · Condo
A single straight run of light grey cabinets with a white top holds a stainless sink and a plain black induction hob, with a slim pull-out hood tucked under the wall cabinets beside a window.
💬 WhatsApp us about this design
water-resistant cabinet boards →Illustrative concept design · Minimalist · Condo · Terrace
An all-white L-shaped kitchen with handle-less doors, a white worktop, a marble-look splashback lit from above and a slim stainless chimney hood over the hob.
💬 WhatsApp us about this design
layout ideas for wet kitchens →Illustrative concept design · Modern · Terrace
A grey galley with a double sink and a hob under a black chimney hood on one side, tall grey cabinets on the other, and the back door open to a paved outdoor yard.
💬 WhatsApp us about this design
wet kitchen floor waterproofing →Illustrative concept design · Industrial · Semi-D · Terrace
A long run of dark grey drawer cabinets with stainless pulls under a very wide stainless hood, a wok and frying pan on the gas hob, and a dark concrete-look tiled splashback.
💬 WhatsApp us about this design
wet kitchen cost guide →Illustrative concept design · Modern · Condo · Semi-D
A galley of matt black cabinets with dark stone-look worktops and warm LED strips under the wall cabinets, the hob on one side and a brass tap over the sink on the other.
💬 WhatsApp us about this design
aluminium cabinet costs per running ft →Illustrative concept design · Classic / retro · Terrace
A U-shaped kitchen with cream gloss doors and a brown granite-look worktop: the hob sits under a chimney hood on the left leg and the sink sits under a wide window at the base.
💬 WhatsApp us about this design
wet kitchen layout options →These are illustrative concept designs created to show style options. They are not completed ClickBina projects. We build and renovate wet kitchens, and every wet kitchen is planned and quoted to your own space, plumbing and cooking habits.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Plan the wet kitchen around three things before you choose a colour: where the smoke goes, where the water goes and what the cabinets are made of. Those decide whether the room still looks good after years of daily wok cooking.
Then choose the finish. Stainless steel and aluminium cabinets shrug off steam and water; laminate on ordinary board is cheaper but swells if water gets into the edges. Dark and glossy surfaces show splashes, while mid-tone matt finishes hide them. See the wet and dry kitchen guide for how the two kitchens share the work.
| Design | What it looks like | What drives the cost | Upkeep | Suits |
|---|---|---|---|---|
| Galley | Two parallel runs, walkway between | Cabinet length and material | Easy to wipe down | Terrace |
| L-shape | Two runs meeting in a corner | Corner fittings, cabinet material | Corner box hard to reach | Terrace, semi-D |
| U-shape | Worktops on three sides | Cabinet length, two corners | Two corners to manage | Terrace |
| Glass partition | Glass wall between wet and dry sides | Glass, frame, hood and ducting | Glass cleaning | Condo |
| Rear extension | New room at the back of the house | Structure, roof, approvals | Roof and skylight upkeep | Semi-D, bungalow |
| Stainless or industrial | Steel tops, open shelves, big hood | Stainless fabrication, hood size | Wipe dry; grease on shelves | Terrace, semi-D |
| Retro tiled | Glazed tiles, cream doors, terrazzo | Tiling area and pattern | Grout lines to scrub | Older terrace |
| Home | Usually works | Watch for |
|---|---|---|
| Condo | Glass partition with a compact run, or a laundry corner at the end | Management approval, the hood duct route, a floor that sits above a neighbour's unit |
| Double-storey terrace | Galley or U-shape at the back, sink under the window | Narrow width, ventilation, water from the yard door |
| Semi-D | L-shape, wok station or a rear extension with a skylight | Approval for extensions, heat under skylights |
| Older terrace being refreshed | Retro tiles or white minimalist on the old layout | Old pipes and a floor that does not fall to the drain |
ClickBina's wet kitchen cost guide splits the cost by scope. In its scope table, a basic glass or aluminium partition across an existing kitchen is RM8,000 – RM15,000; a mid-range build with a new walled wet-kitchen room, full tiling, moisture-resistant plywood cabinets, hood, hob, plumbing and electrical is RM25,000 – RM40,000; and a premium rear extension is RM45,000 – RM70,000+. These are indicative Klang Valley ranges for 2026.
Cabinet material moves the price most once the room exists. The same guide prices wet-kitchen cabinets per running ft: standard melamine RM180 – RM320 (it advises against melamine in a wet kitchen), moisture-resistant plywood RM350 – RM600, PVC or solid surface board RM500 – RM850, and aluminium-frame cabinets RM700 – RM1,300+. Stainless worktops, wok stations and skylights are priced to the specific design.
We build and renovate wet kitchens; plumbing, gas and wiring work is scoped and quoted to your job details. WhatsApp us your job details for a quote: the size of the space, whether it is a condo, terrace or semi-D, how you cook and the design you like from this page. We reply within the hour with next steps. The price we agree is a flat price with no hidden charges, and ClickBina is an experienced KL & Selangor contractor. A site visit is free.
About the images: every image on this page is an illustrative concept design generated to show a style option. Captions describe what each render shows. The RM figures are quoted unchanged from one ClickBina guide, the wet kitchen cost guide named above, as indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.