Browse 13 semi-D garden looks for the front yard, the long open side and the back yard, then see what each one involves before you landscape.
📍 We serve KL, Selangor & Putrajaya.

A semi-D garden is shaped by one thing a terrace house does not have: a long open side yard that runs the full depth of the house on the side not shared with the neighbour. The other side is one shared party wall, and the front is wider than a terrace yard. That makes the semi-D garden a sequence of three spaces — the front yard and gate, the open side, and the back yard — joined by one path. Planting, paving, drainage and privacy along the open side are where most of the design work goes. These 13 concept designs show ideas for each part. Use the filters below to narrow them by style or by front, side or back yard.
Each design below is an illustrative concept render of one semi-D garden idea: the front yard, the open side yard or the back yard. They are grouped by style and by part of the lot. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
13 designs shown
Illustrative concept design · Tropical · Semi-D
A long side yard of lawn with concrete slab pavers set in the grass, leading past shrubs along the boundary wall to a dark slatted back gate.
💬 WhatsApp us about this design
side yard landscaping →Illustrative concept design · Tropical · Semi-D
A raised grey concrete planter along the boundary wall with leafy climbers trained on a stainless steel rail frame, beside a tiled patio with a bench.
💬 WhatsApp us about this design
vertical garden and green wall →Illustrative concept design · Practical & low-upkeep · Semi-D
Concrete porch slabs separated by strips of grass lead straight from the car porch into the open lawn of the side and back garden.
💬 WhatsApp us about this design
grass paver →Illustrative concept design · Modern · Semi-D
A flat-roof canopy with a timber-look soffit on black posts sheltering a deck and a grey sectional sofa, right outside wide glass sliding doors, with lawn and tropical planting beyond.
💬 WhatsApp us about this design
patio design →Illustrative concept design · Practical & low-upkeep · Semi-D
A long timber raised bed of lemongrass-like herbs and chilli plants with ripe orange chillies, a young fruit tree behind and a gravel path alongside.
💬 WhatsApp us about this design
planting bed preparation →Illustrative concept design · Tropical · Semi-D
Two frangipani trees in full white bloom stand in low green beds either side of a grey vertical-slat gate between white pillars.
💬 WhatsApp us about this design
landscape design →Illustrative concept design · Practical & low-upkeep · Semi-D
A narrow channel of smooth river stones, wet after rain, runs between two lawn strips beside the dark boundary fence toward the back of the house.
💬 WhatsApp us about this design
garden drainage →Illustrative concept design · Modern · Semi-D
A tall fence of dark timber-look horizontal louvre slats on black posts tops a low white wall along the lawn, with slim palms at the corner.
💬 WhatsApp us about this design
aluminium louvre screens →Illustrative concept design · Tropical · Semi-D
A neat lawn framed by black metal edging, with a layered tropical border along the fence and a red-leaf shrub bed by the house's glass doors.
💬 WhatsApp us about this design
garden irrigation →Illustrative concept design · Practical & low-upkeep · Semi-D
A stainless steel drying rack with towels on a grey tiled back yard, screened by a long white planter of tall green bamboo, the back sliding door on the left.
💬 WhatsApp us about this design
laundry rack cost →Illustrative concept design · Practical & low-upkeep · Semi-D
A bright green turf play area in the side yard with a timber A-frame play beam and a wooden bench, edged with dark mulch against the house and fence.
💬 WhatsApp us about this design
artificial turf installation →Illustrative concept design · Modern · Semi-D
A cluster of palms in a bed of white pebbles lit from below by small bollard lights at dusk, the house porch glowing beside it.
💬 WhatsApp us about this design
outdoor garden lighting →Illustrative concept design · Modern · Semi-D
A speckled washed-stone apron runs along the base of the house wall between the lawn and the house, with a square stainless drain cover set in it.
💬 WhatsApp us about this design
pebble wash finish →These are illustrative concept designs created to show semi-D garden and landscape options. They are not completed ClickBina projects. We design and build gardens as part of our renovation work, and your garden is assessed and quoted to its own soil, drainage, sun and boundaries.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A terrace house garden has two party walls and two small yards, front and back. A bungalow garden has land on every side. A semi-D sits between them: one side is joined to the twin house at a single shared party wall, and the other side opens into a strip of land that connects the front yard with the back.
For a narrow side strip only, the side yard landscaping guide covers paths, drainage and planting in detail.
| Zone | Usually used for | Design for | Watch for |
|---|---|---|---|
| Front yard | Car porch, gate, first impression | A lawn or border beside the porch, a clear walk to the door | Plants that block the gate or the driver's view |
| Open side yard | Route to the back, rain run-off, play | A firm path, a lawn or turf strip, planting on the fence side | Water sitting against the house wall |
| Party-wall side | Shared boundary with the twin house | Climbers on wires or a slim planter | Roots and fixings in the shared wall |
| Back yard | Laundry, sitting out, herbs | Screened drying, a small patio, edible planting | Drying areas left in full view |
| Your semi-D garden | Do first | Leave for later |
|---|---|---|
| Side yard floods after rain | A swale or drain, and a pebble-wash apron along the wall | New lawn and planting |
| Open side faces a road | A louvre or planted privacy screen | Decorative lighting |
| Young children at home | A turf play patch in the side yard | Delicate planting beds |
| Mainly a car porch and a gate | A grass-paver edge and a gate planting pair | A covered lounge |
Start with the path. The side yard is walked every day, so a firm route of pavers or slabs from the porch to the back gate comes first; lawn, turf or planting fills the rest. Keep the planting on the fence side and a clear, dry band along the house wall. The garden path guide compares stepping stones, slabs and gravel.
Then deal with water. Roof run-off lands in the side yard, so give it a route: a shallow stone swale along the fence or a proper drain, as the garden drainage guide explains. Privacy comes last: a louvre screen or a planted border along the open side makes a covered lounge or a play patch feel enclosed.
ClickBina's landscape design guide puts a basic tidy front garden of grass, shrubs and edging at RM3,000 – RM8,000, and a front garden with a paved path, planting and lights at RM8,000 – RM18,000 (indicative Klang Valley ranges for 2026). A semi-D adds the open side, which is priced by its own materials.
For those materials, the side yard guide lists gravel at RM2 – RM5, concrete paving slabs at RM4 – RM8 and carpet grass at RM1.50 – RM2.50 per sq ft, and the artificial turf guide lists mid-range landscape turf at RM7.50 – RM11.00 per sq ft supplied and laid. The louvre guide puts a pressed aluminium louvre fence panel at RM200 – RM400 per linear metre installed. Swales, aprons and covered lounges are quoted per job.
We design and build gardens as part of our renovation work: we lay paths, pavers and turf, build planters and screens, and plant the front, side and back yard to the look you choose. WhatsApp us your job details for a quote: which part of the semi-D you want to change, how the side yard is used today, where water sits after rain and the ideas from this page you like. ClickBina is an experienced KL & Selangor contractor, and we reply within the hour with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a semi-D garden option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.