Browse 13 small living room looks that free up floor, walkway and wall space, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A small living room works when the floor stays open and the walls do the storing. The moves that help most are furniture that is shallower or does two jobs (a compact sofa, stools, storage ottomans, a daybed), a TV fixed to the wall instead of standing on a long console, storage that rises up the wall, and light colours and curtains that make the room read taller and wider. These 13 concept designs show small halls in condos, studios and narrow terrace houses in modern, Scandinavian, Japandi and contemporary styles. Use the filters below to narrow them by style or home type.
Each design below is an illustrative concept render of one small living room idea. They are grouped by style and by home type. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work or the furniture choice behind that look.
13 designs shown
Illustrative concept design · Modern · Condo
A TV hung straight on a white wall with only a slim white floating shelf below it, the floor underneath bare, a grey sofa in the corner and a balcony door beside.
💬 WhatsApp us about this design
TV cabinet designs →Illustrative concept design · Scandinavian · Condo · Terrace
A compact oatmeal two-seat sofa with two round boucle poufs in front of it and a small light timber side table, in a bright white room with a tall window.
💬 WhatsApp us about this design
living room ideas →Illustrative concept design · Japandi · Condo · Terrace
Two round tables with oak tops on black metal bases, the lower one tucked under the higher one, on a jute rug in front of a beige sofa.
💬 WhatsApp us about this design
living room ideas →Illustrative concept design · Modern · Terrace
A built-in L-shaped bench sofa with charcoal cushions on a base of deep timber drawers, one drawer pulled out with folded cloths inside, a wall TV on a timber panel opposite.
💬 WhatsApp us about this design
small-home storage ideas →Illustrative concept design · Contemporary · Condo
A TV on a compact wall bracket on the wall between the sofa and a round white dining table, so both zones can see it, with a grey sofa in the foreground.
💬 WhatsApp us about this design
TV cabinet designs →Illustrative concept design · Scandinavian · Condo
Sheer white curtains and beige side drapes hung from a track at the ceiling and falling to the floor across a wide window, a light grey sofa and a floating TV console beside.
💬 WhatsApp us about this design
curtain track installation →Illustrative concept design · Contemporary · Terrace · Condo
A tall walnut open shelving unit rising to the ceiling, holding ceramic vases, plants and a woven basket, beside a cream sofa in warm afternoon sun.
💬 WhatsApp us about this design
floating shelves and bookcases →Illustrative concept design · Modern · Condo · Terrace
Three square upholstered storage ottomans, two mustard and one grey, in front of a grey L-sofa, the lid of one lifted with a cushion stored inside.
💬 WhatsApp us about this design
small-home storage ideas →Illustrative concept design · Japandi · Terrace
A long narrow hall with a cream sofa on one side, a round jute rug and round low oak table in the middle, and an oak TV console opposite.
💬 WhatsApp us about this design
living room floor tiles →Illustrative concept design · Scandinavian · Condo
A pale grey upholstered daybed on a low oak frame against a white wall, cushions along the back, a small round side table and a black floor lamp.
💬 WhatsApp us about this design
small condo design ideas →Illustrative concept design · Modern · Condo
A slim white floating desk with a drawer under the window, a closed laptop and an oak stool, beside a compact grey sofa on an oak frame.
💬 WhatsApp us about this design
small condo design ideas →Illustrative concept design · Contemporary · Terrace · Condo
Walls, sofa and curtain all in one soft sage green, with a white ceiling, a white pendant and a herringbone timber floor.
💬 WhatsApp us about this design
living room paint colours →Illustrative concept design · Modern · Terrace
A slim grey sofa tight against the wall of a narrow hall, leaving a clear timber walkway to the staircase and the back door, a wall TV over a low white console opposite.
💬 WhatsApp us about this design
living room ideas →These are illustrative concept designs created to show small living room options. They are not completed ClickBina projects. We plan and fit small living rooms as part of our renovation work, and your room is assessed and quoted to its own size, layout and building rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start with the way people walk through the room. In most Malaysian condos and terraces the living room is also the corridor between the front door, the dining table and the kitchen, so the walkway decides where the sofa can go. Draw the walking route first, then fit the sofa, the TV and the storage around it.
ClickBina's living room design guide covers the whole room, from the TV wall to the ceiling; this gallery stays with the moves that win space back.
| Move | What it solves | Small-room watch-out |
|---|---|---|
| Wall-hung TV, slim shelf | A long console blocking the walkway | Concealed cable route and a socket at the right height |
| Compact sofa plus stools | Bulky armchairs that are rarely used | Keep stools out of the main walking line |
| Storage seats or a drawer-base sofa | No cupboard for blankets, toys and cushions | Lids and drawers need space in front to open |
| Shelving to the ceiling | Clutter on the floor and the coffee table | Fixing into a solid wall; heavy items low |
| Ceiling-high curtains | A low ceiling or a short window | Track position decided with the ceiling |
| One-colour scheme | A busy room full of different colours | Check the shade in daylight and at night |
| Your room | Usually works | Watch for |
|---|---|---|
| Small condo hall with a balcony door | Wall-hung TV, ceiling-high curtains, compact sofa | Strata rules on drilling and the aircon trunking route |
| Studio apartment | A daybed, a slim desk behind the seating, one rug to mark the zone | Keeping the bed area out of view of the door |
| Long narrow terrace hall | Round rug, armless sofa, shelving on the long wall | The walkway past the sofa to the stairs and kitchen |
| Flat or older apartment | Storage seats, one-colour scheme, shelves up the wall | Surface wiring that needs tidying before the TV goes up |
This gallery covers the small living room as a whole. The parts have their own guides: the TV cabinet design gallery for consoles and TV walls, the floating shelves and full-height bookcase guide for storage walls, the curtain track installation guide for ceiling-hung curtains, and the living room floor tiles guide if the floor is being replaced too.
For a whole small unit rather than one room, see the small condo design ideas, and the small-home storage guide for built-in versus loose storage across the house.
ClickBina's living room design guide puts a refresh of paint, lighting and decor at about RM3,000 – RM8,000, and a feature wall with ceiling and lighting at RM8,000 – RM20,000 (indicative Klang Valley ranges for 2026).
For single items, the curtain track guide lists a manual track at RM30 – RM120 and a ceiling-recessed track at RM80 – RM200 per window, before the fabric; the shelving guide lists a floating or low TV console at RM280 – RM600 per foot run; and the small condo guide puts an area rug at RM200 – RM1,500. Loose furniture is bought separately. Ask for built-ins, wiring and paint to be listed as separate lines so you can phase the work.
We plan and fit small living rooms as part of our renovation work: we build built-in benches and shelving, install TV walls and curtain tracks, and supply and paint the walls. Strata and management rules still apply, so check them before the work starts. WhatsApp us your job details for a quote: the size of the room, what you want to change, and the ideas from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a small living room option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.