Browse 12 bathroom looks for a kampung or wooden house, from a masonry bathroom block to a separate wudhu area, then see what each involves.
📍 We serve KL, Selangor & Putrajaya.

A kampung house bathroom should not sit on timber. The usual answer is a masonry bathroom block at ground level beside or behind the house, or a fully tiled room on a concrete slab in a half-brick house, with a proper waterproofing layer and a floor that falls to a trap. Inside it, the upgrades are the familiar ones: a shower in place of the old water tank, a seated toilet, anti-slip tiles and grab bars for elders, a water heater, and switches kept away from water. These 12 concept designs show block, upgrade and safety ideas. Use the filters below to narrow them by style.
Each design below is an illustrative concept render of a bathroom for a kampung or wooden house, grouped by style. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the toilet, tiles, heater, niche, window or structure behind that look.
12 designs shown
Illustrative concept design · Masonry block
A small white rendered masonry block with an open doorway and a wall vent under a corrugated roof, standing beside the timber stairs of a raised house.
💬 WhatsApp us about this design
moving bathrooms into masonry →Illustrative concept design · Masonry block
A small white washroom with its timber door open to a tiled WC with the lid down, an outdoor tap and small basin on the wall, and a grey stone step.
💬 WhatsApp us about this design
bathroom designs →Illustrative concept design · Upgrade
A pale green tiled shower with a rain head and a hand shower, a frameless glass panel and a seated toilet with the lid closed by a window.
💬 WhatsApp us about this design
bathroom designs →Illustrative concept design · Upgrade
A white tiled WC with a seated toilet, lid closed, a wall bidet tap, two stainless grab bars and grey floor tiles.
💬 WhatsApp us about this design
squat to seated toilet conversion →Illustrative concept design · Upgrade
Long timber-look plank tiles cover the walls and floor, with a white vessel basin on a timber shelf, a round mirror and a wall-hung toilet.
💬 WhatsApp us about this design
bathroom designs →Illustrative concept design · Masonry block
A white tiled WC with a wide aluminium louvred window high on the wall letting in daylight, a grey floor and a toilet with the lid closed.
💬 WhatsApp us about this design
louvre window options →Illustrative concept design · Upgrade
A grey tiled shower wall with a plain white water heater, a rain head and a hand shower hose, a toilet and a window to palm trees.
💬 WhatsApp us about this design
water heaters with a pump →Illustrative concept design · Safe & easy
Seen from the doorway: a toilet with fold-up arm supports, a stainless grab bar, a glass shower door and a speckled grey anti-slip floor.
💬 WhatsApp us about this design
anti-slip tile ratings →Illustrative concept design · Safe & easy
Four wall taps over a low concrete trough beside a separate timber WC door, under a timber roof, with a stone floor and a timber fence.
💬 WhatsApp us about this design
bathroom designs →Illustrative concept design · Upgrade
A sage green tiled shower with a long built-in tiled bench and an empty recessed niche above it, over a grey tiled floor.
💬 WhatsApp us about this design
shower niches →Illustrative concept design · Safe & easy
A grey corridor with white switch plates on the walls outside the bathroom doorway, a toilet and a window beyond, and a stone-look floor.
💬 WhatsApp us about this design
house rewiring →Illustrative concept design · Masonry block
A white tiled bathroom on an upper floor with a glass shower, a seated toilet, a white basin, two mirrors and a tall window, a timber wall at the doorway.
💬 WhatsApp us about this design
timber floor to concrete slab →These are illustrative concept designs created to show bathroom options for a kampung house. They are not completed ClickBina projects. Your bathroom is assessed and quoted to its own site, water supply and drainage.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
ClickBina's kampung house renovation guide says bathrooms built on timber boards leak into the joists every day, and that most renovations move wet areas into a brick annex or a new brick ground floor on a concrete slab with proper waterproofing and falls to the floor trap. That decides the first design choice: where the bathroom sits.
Once the room is in masonry, the design is a normal bathroom: waterproofing, falls, tiles, fittings, ventilation and safe wiring.
| Old set-up | Upgrade | Guide |
|---|---|---|
| Tiled water tank and dipper | Shower with a glass panel, floor re-laid to a trap | bathroom designs |
| Squat toilet | Seated WC with a bidet spray and grab bars | squat to seated |
| Weak, cold shower | Instant heater, with a pump if one shower is weak | heaters with a pump |
| Smooth, slippery floor | Anti-slip porcelain tiles | anti-slip tiles |
| Switch inside the wet area | Switches moved to the corridor | rewiring |
| Mainly used by | Usually works | Watch for |
|---|---|---|
| Elderly parents | Seated WC, grab bars, anti-slip floor, bench in the shower | Level entry with no step |
| Whole family | Shower, separate WC, wudhu taps outside | Enough drainage for several users |
| Gardeners and helpers | Outside washroom with a tap and basin | Septic tank or sewer connection |
| Upstairs bedrooms | Bathroom on a new concrete slab | Structural design first |
Published figures on ClickBina's guides give the scale (indicative Klang Valley ranges for 2026): a new brick section at RM150 – RM350 per sq ft from the kampung renovation guide; a new WC supplied and installed from about RM350 – RM1,200, and full hack-and-redo waterproofing at RM4,500 – RM9,000 per bathroom; anti-slip porcelain tiles at RM18 – RM35 per sq ft; mosaic niche work at RM20 – RM45 per sq ft; an instant heater at RM280 – RM530 installed, or RM500 – RM950 with a pump; and Professional Engineer's drawings at RM2,000 – RM8,000 where a slab is needed.
A new bathroom block is priced as building work plus the bathroom fit-out, so ask for the two to be listed separately.
We build and renovate bathrooms as part of our renovation work, including the masonry, waterproofing, tiling and fittings, with a Professional Engineer for any slab and an electrician for the wiring. WhatsApp us your job details for a quote: where the house is, where you want the bathroom, who will use it, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a bathroom option for a kampung house. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.