Studio & SOHO Kitchen Design: 12 Kitchenette Ideas
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Design gallery

Studio & SOHO Kitchen Design
12 Kitchenette Ideas for One-Room Units

Browse 12 kitchenette looks for a studio, SOHO or SOFO unit, from a kitchen hidden behind doors to a bar counter that divides the room.

📍 We serve KL, Selangor & Putrajaya.

Illustrative concept design: one-wall studio kitchenette with white cabinets, an oak-look worktop, an induction hob and sink, a slim lit hood and the bed zone by city windows

In a studio, SOHO or SOFO unit the kitchen is a kitchenette along one wall of the room you sleep in, so it has to be compact, quiet and easy to hide. Many SOHO units have kitchenette-grade plumbing risers and no gas, so the usual set-up is a compact sink, an induction hob, a slim hood and good storage, with the sink and riser positions fixed by the building. Doors that close the kitchen off, a bar counter that divides it from the bed, and lighting that keeps the two zones separate do the rest. These 12 concept designs show hidden, compact and open kitchenettes. Use the filters below to narrow them by style.

More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.

How to design a studio or SOHO kitchenette

Start with what the building allows. ClickBina's SOHO and SOFO renovation guide warns that many SOHO units are zoned commercial-residential and have kitchenette-grade plumbing risers that may not support a full wet kitchen sink and hob, and that gas and heavy cooking exhaust may not be allowed. A dry kitchenette with a compact sink, an induction hob and good storage suits most units.

  • Keep it on one wall where the risers already are; moving a sink in a high-rise is rarely worth it.
  • Hide it behind full-height or sliding doors if the kitchen faces the bed.
  • Go induction and compact: a two-zone hob, a slim hood, an under-counter fridge.
  • Divide the room with a bar counter or a slatted screen rather than a full wall.
  • Light by zone, so the kitchen can be bright while the bed side stays dim.

For the rest of the unit, the small condo design gallery and the wall bed guide cover layouts and fold-away furniture that suit one-room homes.

Hidden, compact or open: what each needs

ApproachBest forNeedsWatch for
Hidden behind doorsKitchen facing the bedFull-height or sliding doors, a ventilated cabinetDoor swing and steam
Compact appliancesDaily light cookingInduction hob, slim hood, under-counter fridgeCircuit capacity
Open with a bar counterStudios that need a dining spotA counter, two stools, zone lightingClear walkway
Corridor kitchenetteSOFO units with an entry passageA single slim run of cabinetsWidth of the passage

Quick pick by unit

UnitUsually worksWatch for
Studio (one open room)Hidden kitchen, bar counter divider, zone lightingSmells reaching the bed
SOHODry kitchenette, induction, recirculating hoodRiser size and house rules
SOFOCorridor kitchenette, tall pantry with laundryWhether residential use is allowed
Airbnb or rental unitDurable flat fronts, simple appliances, easy-clean topShort-stay by-laws

Building rules before you start

  • Management approval. The SOHO guide says to apply to the management before any work, with the scope and drawings for any plumbing or electrical change, and expect a refundable renovation deposit.
  • Risers and gas. Ask about the drain riser size, whether gas is available, and whether heavy cooking exhaust is allowed.
  • Exhaust. A hood may only be able to recirculate; heavy frying in an open studio is best avoided.
  • Power. An induction hob and a built-in oven together may need a circuit upgrade; ask an electrician.

What a studio kitchenette costs

ClickBina's guides quote (indicative Klang Valley ranges for 2026): kitchen cabinets per foot run from about RM180 – RM300 for melamine to RM280 – RM420 for laminate; a floor-to-ceiling laminate pantry at roughly RM448 – RM924 per foot; and fitting a replacement chimney hood where no new duct is needed at RM350 – RM600. The SOHO guide lists serviced-apartment renovation deposits on ClickBina's KL guide at RM1,500 – RM3,000.

A short run of cabinets keeps a kitchenette affordable even with better hardware, so spend on hinges, drawer runners and a good worktop rather than length.

How ClickBina can help

We build kitchens as part of our renovation work, including compact kitchenettes for studio, SOHO and SOFO units, with the management's paperwork handled with you. WhatsApp us your job details for a quote: the building, the unit size, where the sink and risers are now, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina SOHO and SOFO renovation guide — kitchenette-grade risers, gas and exhaust, management approval and the deposit figure.
  • ClickBina small kitchen cabinet and hood and hob guides — cabinet, pantry and hood figures.

About the images: every image on this page is an illustrative concept design generated to show a kitchenette option for a studio or SOHO unit. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Can I have a full kitchen in a SOHO unit?
Sometimes not. Many SOHO units have kitchenette-grade plumbing risers that may not support a full wet kitchen sink and hob, and gas may not be available. Ask the management before planning one.
What hob suits a studio kitchenette?
An induction hob is the usual choice: no gas, less heat in the room and easy to clean. Check the circuit can take it.
Do I need a hood in a studio?
Yes, but it may only be able to recirculate if there is no duct. It filters grease, not heat or steam, so keep heavy frying to a minimum.
How do I hide the kitchen from the bed?
Full-height or sliding doors in front of the kitchenette, or a bar counter and slatted screen between the two zones, with separate lighting.
Where can the washing machine go in a SOHO?
In a tall ventilated cabinet beside the kitchenette, with a drain point and a leak tray, if the unit has no service yard.
How much does a studio kitchenette cost?
ClickBina's guides put cabinets at about RM180 – RM300 per foot run for melamine and RM280 – RM420 for laminate (indicative 2026, Klang Valley); a short run keeps it affordable.
Are the designs on this page real ClickBina projects?
No. They are illustrative concept designs that show kitchenette options. Your unit is assessed and quoted to its own building rules.

Get a Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides