Browse 13 looks for turning a flat concrete roof or a penthouse terrace into a garden or an outdoor room, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A rooftop garden turns a flat concrete roof into usable space, but on a Malaysian roof the design starts underneath: the waterproofing, the drainage and the weight the slab can carry. Once those are right, the roof can take raised planters, artificial turf, deck tiles on pedestals, a herb garden, a BBQ corner, shade and lighting. These 13 concept designs show roof gardens and terraces on terraces, semi-Ds, bungalows and condo penthouses in modern, tropical, edible and entertaining styles. Use the filters below to narrow them by style or home type.
Each design below is an illustrative concept render of one roof garden or roof terrace idea. They are grouped by style and by home type. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look, from waterproofing to planters and shade.
13 designs shown
Illustrative concept design · Modern · Terrace
A row of white rendered planters with timber seat tops and tall ornamental grasses along the parapet of a flat roof.
💬 WhatsApp us about this design
planter box waterproofing →Illustrative concept design · Tropical · Terrace · Semi-D
A flat roof laid half in green artificial turf and half in timber-look deck tiles, with white planters of palms by the door.
💬 WhatsApp us about this design
artificial turf on roofs →Illustrative concept design · Lounge & entertaining · Semi-D · Bungalow
A roof terrace lounge under a dark grey aluminium pergola frame, two outdoor sofas with cream cushions and potted plants at sunset.
💬 WhatsApp us about this design
gazebo and pergola designs →Illustrative concept design · Edible & practical · Terrace
Rows of timber planter boxes on feet growing herbs and leafy vegetables on a concrete roof, with black irrigation pipes at each box.
💬 WhatsApp us about this design
garden irrigation →Illustrative concept design · Modern · Condo
A penthouse terrace with timber-look deck tiles, a frameless glass balustrade, white planters with small trees and a lounger.
💬 WhatsApp us about this design
rooftop terrace waterproofing →Illustrative concept design · Lounge & entertaining · Semi-D · Bungalow
A rooftop BBQ counter at dusk in grey stone-look masonry with a stainless BBQ, a small sink, warm under-counter light and three bar stools.
💬 WhatsApp us about this design
outdoor kitchen and BBQ areas →Illustrative concept design · Lounge & entertaining · Terrace · Semi-D
A roof terrace shaded by a sand-coloured fabric canopy extended from the wall over a dining set, palms beyond the parapet.
💬 WhatsApp us about this design
retractable fabric awnings →Illustrative concept design · Modern · Condo · Terrace
A low close view of large grey porcelain deck tiles raised on black adjustable pedestals above the roof membrane.
💬 WhatsApp us about this design
flat roof drainage →Illustrative concept design · Tropical · Semi-D · Bungalow
A raised bed of red and green sedum and succulents edged with grey pebbles at the edge of a flat roof, timber deck boards in front.
💬 WhatsApp us about this design
green roof waterproofing →Illustrative concept design · Edible & practical · Terrace
A flat roof with a light steel frame and clear roof sheets over a folding drying rack, potted plants beside it.
💬 WhatsApp us about this design
landscape designs →Illustrative concept design · Lounge & entertaining · Semi-D · Condo
A roof terrace at night with warm LED strips under the capping of long planters, grey deck tiles and a dark outdoor sofa.
💬 WhatsApp us about this design
outdoor lighting →Illustrative concept design · Modern · Terrace · Semi-D
A roof corner with a tall timber-look slat screen beside a grey water tank and potted plants along the parapet.
💬 WhatsApp us about this design
aluminium slat screens →Illustrative concept design · Edible & practical · Terrace · Semi-D
A row of large grey planters with small fruit shrubs and chilli plants along a paved roof path, a timber bench beside.
💬 WhatsApp us about this design
composite decking →These are illustrative concept designs created to show rooftop garden options. They are not completed ClickBina projects. We build roof gardens and terraces as part of our renovation and landscape work, and your roof is assessed and quoted to its own structure, waterproofing, drainage and building rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
Start under the finish. A roof garden that leaks into the bedrooms below is a failure however good it looks, so the first questions are whether the membrane is sound, whether water drains to the outlets, and how much weight the slab can carry. Only then choose the planting, the floor and the furniture.
ClickBina's roof garden and green roof waterproofing guide explains the layers under a planted roof in detail.
| Finish | Weight | Drainage | Watch for |
|---|---|---|---|
| Deck tiles on pedestals | Light | Water runs underneath | Level the pedestals so tiles do not rock |
| Artificial turf | Light | Needs a free-draining base | Must not cover the drains |
| Raised planters on feet | Moderate | Membrane stays visible | Weight of wet soil |
| Built-in rendered planters | Heavy | Need their own membrane and outlet | Structural check first |
| Sedum or green roof bed | Moderate to heavy | Needs a drainage layer and root barrier | Specialist build-up |
| Tiles on screed | Heavy | Falls in the screed | Hard to inspect the membrane later |
| Your roof | Usually works | Watch for |
|---|---|---|
| Terrace house flat roof | Planters on feet, turf or deck tiles, a drying corner | Access by stair or hatch, and the neighbour's parapet |
| Semi-D or bungalow roof | Lounge under a pergola, BBQ counter, LED planters | Structure for heavy built-ins |
| Condo penthouse terrace | Deck tiles, glass balustrade, potted trees | Management approval and the building's membrane |
| Hot, exposed roof | Succulent beds, a retractable canopy, light-coloured finishes | Wind and heat on furniture |
A roof garden pulls in several specialist jobs. The rooftop terrace waterproofing guide covers the membrane under a terrace, the flat roof ponding guide covers falls and drains, and the planter box waterproofing guide covers built-in planters.
For what goes on top, see the artificial turf guide, the garden irrigation guide and the retractable awning guide.
The base layer has published ranges. ClickBina's rooftop terrace waterproofing guide puts the membrane system at RM8 – RM20 per sq ft, with screed and finishes on top, and a full lift-and-redo of an existing tiled terrace at roughly RM25 – RM45 per sq ft. The roof garden guide adds drainage cell and geotextile at RM8 – RM15 per sq ft over a new membrane (indicative Klang Valley ranges for 2026).
For the garden itself, the planter box guide puts large or rooftop planters at RM2,500 – RM3,000 to re-waterproof, the irrigation guide lists a drip kit at RM400 – RM800, the retractable awning guide puts a fabric canopy at RM400 – RM900 per metre run, and the decking guide prices basic-to-mid WPC decking at RM30 – RM60 per sq ft installed.
We build roof gardens and terraces as part of our renovation and landscape work: we lay deck tiles and turf, build planters and BBQ counters, and install lighting and awnings. Waterproofing is checked and renewed first where needed, and pergolas, glass balustrades and structural checks are quoted as their own items. WhatsApp us your job details for a quote: the roof size, how you get up there, and the ideas from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a rooftop garden option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.