Browse 12 design ideas for a corner or end lot, where the house shows three faces and comes with a strip of side land, then see what each one involves.
📍 We serve KL, Selangor & Putrajaya.

A corner lot house has three exposed faces instead of one: the front, a long side wall on the road and the back. It also comes with side land that can hold a patio, a guest room, a store, a third car or a garden, within the council's setbacks. The side wall takes the afternoon sun and the street noise, and the fence at the corner has to leave drivers a clear sight line. These 12 concept designs show corner and end-lot terraces and semi-Ds, with ideas for the front, the corner and the side land.
Each design below is an illustrative concept render of a corner or end-lot house. Filter them by style, by front and corner or by side land, and by terrace or semi-D. Tap any image to enlarge it. Every card links to the ClickBina guide that covers the work behind that look.
12 designs shown
Illustrative concept design · Modern · Terrace
A corner terrace house with grey and white bands carried from the front round onto the long side wall, a white fence and black gates at the corner.
💬 WhatsApp us about this design
choosing house colours →Illustrative concept design · Tropical · Terrace · Semi-D
A side-land patio under a black frame with a timber-slat roof, a dining set on a tiled floor, potted palms and a slatted side fence along the road.
💬 WhatsApp us about this design
gazebo and pergola designs →Illustrative concept design · Modern · Terrace · Semi-D
A white house with a solid white-brick room block lit by a high horizontal louvred window strip, behind a white wall and gate.
💬 WhatsApp us about this design
corner lot side land rules →Illustrative concept design · Modern · Terrace · Semi-D
A single-storey brick house on a corner with a long fence of red brick piers and grey horizontal slat panels, and matching slat gates.
💬 WhatsApp us about this design
boundary wall construction →Illustrative concept design · Tropical · Terrace · Semi-D
A white corner house with a low white wall and a bougainvillea planter at the road corner, dark slat fences and gates continuing along both roads.
💬 WhatsApp us about this design
landscape designs →Illustrative concept design · Practical · Terrace · Semi-D
A grey double-storey corner house with a long white-piered fence along the side road and a grey slat gate at the corner.
💬 WhatsApp us about this design
main gate designs →Illustrative concept design · Practical · Terrace · Semi-D
A white painted-brick store block with a roller shutter beside a side driveway, a metal canopy along the house and a dark gate at the back.
💬 WhatsApp us about this design
garden sheds and outdoor storage →Illustrative concept design · Modern · Terrace · Semi-D
A beige double-storey corner house whose long side wall carries louvred aluminium shutter panels over several windows, in warm low afternoon sun, with white slat gates.
💬 WhatsApp us about this design
aluminium louvre screens →Illustrative concept design · Practical · Terrace · Semi-D
A flat-roofed car porch on slim black posts in front of a grey wall with a glazed door, black gates open and planting at the sides.
💬 WhatsApp us about this design
car porch designs →Illustrative concept design · Tropical · Terrace
A single-storey white house with a deep timber-lined eave over black-framed glass doors onto a strip of lawn, and a side driveway along a white wall.
💬 WhatsApp us about this design
corner lot side land rules →Illustrative concept design · Tropical · Terrace · Semi-D
A row of young shade trees and a stepping-stone path set in long grass along a white wall beside the road.
💬 WhatsApp us about this design
tree roots and damage →Illustrative concept design · Modern · Terrace · Semi-D
A white corner house with black-framed glazing wrapping round the corner on both floors and a glass balcony on the upper floor.
💬 WhatsApp us about this design
window designs →These are illustrative concept designs created to show corner lot options. They are not completed ClickBina projects. We repaint, extend and refit corner lot houses as part of our renovation work once any approval is in place, and your house is assessed and quoted to its own lot, setbacks and rules.
More galleries: browse all design ideas by area of the house, from cabinets and kitchens to porches and grilles.
A corner lot is a terrace or semi-D with more of everything: more wall facing the street, more sun on the side, more land and more rules about that land. The first decision is what the side land is for, because every use, from a patio to a guest room, has a different cost, a different approval path and a different effect on the side facade.
ClickBina's corner and end lot renovation guide covers the setbacks and approval rules for the side land in detail.
| Use | What it gives you | Approval | Watch for |
|---|---|---|---|
| Garden strip and trees | Shade, privacy, a green street face | Usually none | Roots near walls and drains |
| Covered patio | An outdoor room | May be needed for a roofed structure | Setbacks and rain run-off |
| Store or utility room | Hidden storage | Check setbacks first | Damp against the boundary wall |
| Side car porch | Parking for a third car | Approval needed | Side setback and a drain crossing |
| Guest or family room | A real extra room | Approved plans needed | Roof junction and setbacks |
| Lot | Usually works | Watch for |
|---|---|---|
| Corner terrace, double-storey | A colour scheme round the corner, sun fins, a brick-pier side fence | Scaffold for the long side wall |
| Corner terrace, single-storey | A side family room or a covered patio | The roof junction with the house |
| End lot with a narrow side strip | Shade trees, a store, a planted fence | Access for upkeep |
| Corner semi-D | A second gate, a side porch, a corner window | Corner sight lines at the junction |
For fronts of every house type, see the house exterior design gallery. The main gate design gallery covers gates for the front and side, the side yard landscaping guide covers planting the side strip, and the gazebo and pergola gallery shows roofed structures for an outdoor room.
ClickBina's corner lot guide lists a side extension of 80 – 150 sq ft at RM20,000 – RM55,000 before consultant and council fees. The boundary wall guide puts brick walling with plaster and paint at RM55 – RM80 per sq ft of wall area and brick or RC pillars with infill at RM350 – RM700 per linear metre.
A prefab aluminium gazebo kit is RM6,000 – RM12,000 in the gazebo and pergola gallery, and an exterior repaint of a semi-D-sized house runs RM6,000 – RM12,000 plus RM800 – RM2,500 for upper-floor access in the exterior repaint guide. Pergolas, stores and sun fins are quoted per job. These are indicative Klang Valley figures for 2026.
We repaint, extend and refit corner lot houses as part of our renovation work, and we can build fences, gazebos and car porches on the side land once any approval is in place. WhatsApp us your job details for a quote: terrace or semi-D, how wide the side land is, what you want to use it for, and the looks from this page you like. ClickBina is an experienced KL & Selangor contractor, and we'll reply as soon as we can with next steps. The price we agree is a flat price with no hidden charges.
About the images: every image on this page is an illustrative concept design generated to show a corner lot option. Captions describe what each render shows. RM figures are quoted unchanged from the ClickBina guides named above, indicative Klang Valley ranges for 2026.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.