Who Can Submit Building Plans: Architect, Draughtsman or PE
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📋 Permits & Rules

Who Can Submit Building Plans
Architect, Draughtsman, PE or Contractor? (2026)

Before you pay anyone to “handle the approval”: who may draw, sign and submit your plans.

📍 We serve KL, Selangor & Putrajaya.

Architectural and structural drawings for a house extension ready for council submission

Building plans for an extension or structural change are prepared and submitted to the council by a registered architect, or by a registered building draughtsman for smaller works where the council accepts one, with a professional engineer (PE) designing and endorsing anything structural. A renovation contractor builds to the approved drawings but cannot endorse plans, and nobody can legally “settle” an approval outside that process. ClickBina's permit guide puts architect or draughtsman fees for minor extension drawings at RM3,000–RM10,000 and PE fees at RM2,000–RM8,000.

Why it matters who submits

Under the Street, Drainage and Building Act 1974 (Act 133) and the Uniform Building By-Laws 1984, building work that adds to or alters the structure of a house needs the local council's approval before it starts. ClickBina's guide to council approval for renovations explains which works need it and which are usually exempt.

The council does not accept plans from just anyone. The permit guide notes that only drawings endorsed by a registered architect or PE are accepted for structural or extension submissions, and that commissioning drawings from an unregistered draughtsman is a common mistake. The person who submits is the person the council deals with, and the person whose name sits on the certificates at the end.

The people involved, side by side

WhoWhat they doWhat they cannot do
Registered architectPrepares and submits architectural plans; acts as the principal submitting personDesign the structure without an engineer
Registered building draughtsmanPrepares and submits plans for smaller works, where the council accepts a draughtsmanSign for structure, or for works outside the scope the council allows
Professional engineer (PE)Designs and endorses the structure: foundations, beams, columns, slabsReplace the architectural submission
Renovation contractorBuilds to the approved drawings, coordinates the tradesPrepare or endorse plans for submission
OwnerApplies and signs; submits a pelan setara where the council allows oneStart work before approval

The architect: principal submitting person

For most extensions and structural changes, a registered architect is the principal submitting person. The architect checks the plan against the local plan for land use, plot ratio and setbacks, draws the proposal, submits it through the council's One-Stop Centre, answers the council's comments and follows the job through to the completion documents. ClickBina's guide to illegal extensions lists the architect as the principal submitting person for an extension, with a PE for any structural element.

The building draughtsman: smaller works

Many homeowners meet a draughtsman first, because for small works a draughtsman is cheaper and quicker. The same permit guide records that some councils accept a registered draughtsman for minor works, and the pelan setara guide notes that in Shah Alam a full submission can be certified by a professional architect or a draughtsman registered with the Board of Architects.

The word that matters is registered. A person who draws plans but is not registered cannot endorse a submission, and the drawings may have to be redone. Each council decides which works a draughtsman may submit, so ask the council or the draughtsman to confirm your job falls inside that scope before you pay.

The professional engineer: anything structural

Whoever submits the architectural plans, anything that carries load needs a professional engineer: new foundations, columns and beams, a removed load-bearing wall, a new slab, an upper floor. The PE designs it, endorses the structural drawings, and for regularisation inspects what was built and certifies whether it is sound. ClickBina's guides say plainly that the engineer decides the structure, not the contractor, and that a council will not accept a structural submission without a PE.

What a contractor can and cannot do

A renovation contractor builds. A good one reads the approved drawings, points out what will not work on site, prices the work and coordinates the trades. What a contractor cannot do is prepare or endorse plans for submission, or decide on a structural design. If a contractor offers to “handle the approval”, ask who the architect or draughtsman is and who the PE is, by name, and whose name will be on the submission.

ClickBina's guide to choosing a renovation contractor covers the other checks: written scope, payment schedule tied to progress and a contract that says who is responsible for approvals.

When the owner submits: pelan setara

Some councils publish a book of standard sketches for common small jobs on terrace houses, such as extending the front roof over the car porch or building a front wall. The owner picks the matching sketch, fills in the house details, signs and submits it without a consultant. The trade-off is that nobody checks your particular structure: the owner carries full responsibility for its stability. Anything outside the sketches goes the full route with an architect or draughtsman.

“We can settle the council”: no legitimate shortcut

Some runners and contractors offer to “settle” the council: skip the plans, speed up an approval for a fee, or make an enforcement notice go away. There is no lawful version of this. Approval comes from a proper submission, prepared by the people above, and paid through the council's published fees. Paying someone to influence an officer is a bribe, and offering or giving one is an offence under Malaysia's anti-corruption law, for the giver as well as the taker.

Even when nobody is bribed, a shortcut usually means work without approval, and the consequences land on the owner. ClickBina's guide to renovating without a permit explains stop-work orders, demolition notices and why banks hesitate to lend on unapproved works. The illegal extension guide records a fine of up to RM10,000 under Act 133 for building without approval, plus a continuing fine. Its warning signs match the renovation scam guide: cash only, no names, no receipts and pressure to start before anything is approved.

What the professionals cost

ItemIndicative price (Klang Valley, 2026)Source guide
Architect or draughtsman fees, minor extension drawingsRM3,000 – RM10,000Renovation permit guide
PE fees, structural drawingsRM2,000 – RM8,000Renovation permit guide
Total professional fees, rear extensionRM5,000 – RM18,000Renovation permit guide
Professional plus council fees, rear extensionRM7,000 – RM20,000Renovation permit guide
Regularising works done without approval (architect and PE fees)RM3,000 – RM15,000Illegal extension guide
Council processing fees and penalty when regularisingRM500 – RM5,000Illegal extension guide
Owner-initiated demolition of an unapproved structureRM5,000 – RM25,000Illegal extension guide

Want this priced for your home?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Set against the regularisation and demolition rows, the professional fees for doing it properly at the start are usually the cheaper route.

How to check who you are dealing with

  • Ask for full names of the architect or draughtsman and of the PE, not just a company name.
  • Check the registration: architects and building draughtsmen with the Board of Architects Malaysia, engineers with the Board of Engineers Malaysia; both boards keep public registers.
  • Ask what will be submitted, to which council and under which process, and get a copy of what is filed.
  • Pay fees through receipts: council fees are paid to the council, professional fees against an invoice.
  • Do not start work until the approval is in hand and any notice to start work required by the council is submitted.

Order of work for an approved job

  1. Describe the job and check with the council or a consultant whether it needs approval.
  2. Appoint a registered architect or draughtsman, and a PE if anything is structural.
  3. Let them survey, draw and submit; answer the council's comments through them.
  4. Get contractor prices against the submitted drawings, not a sketch.
  5. Start only after approval, build to the drawings, and let the PE inspect the structure.
  6. Collect the completion documents and keep them with the approved plans.

How ClickBina can help

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. For work that needs approval, the plans and structural design stay with your architect or draughtsman and a professional engineer; ClickBina prices and builds the works to the approved drawings. WhatsApp us your job details for a quote: the area, the property type and the work you have in mind. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina renovation permit guide — Act 133 and UBBL, architects, draughtsmen and PEs, professional fees.
  • ClickBina illegal extension guide — principal submitting person, regularisation steps and costs, Act 133 fine.
  • ClickBina pelan setara guide — owner-submitted standard sketches and owner responsibility.
  • ClickBina renovation without permit guide — qualified persons under UBBL, stop-work and demolition notices.

How we estimated prices: every figure is quoted unchanged from the ClickBina guide named beside it; they are indicative Klang Valley ranges, not a quotation. Each council sets its own process and the scope a draughtsman may submit. This page is general information, not legal advice.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Who can submit building plans to the council in Malaysia?
A registered architect, or a registered building draughtsman for smaller works where the council accepts one, with a professional engineer endorsing anything structural.
Can a renovation contractor submit plans?
No. A contractor builds to the approved drawings but cannot prepare or endorse plans for submission.
Do I need a PE for a renovation?
Yes for anything structural: new foundations, beams, columns, slabs, an upper floor or a removed load-bearing wall.
Architect or draughtsman: which do I need?
A draughtsman may be enough for smaller works where your council accepts one; larger or more complex works go to an architect. Ask the council or consultant to confirm the scope.
How much do architect and PE fees cost for a small extension?
ClickBina's permit guide puts architect or draughtsman fees for minor extension drawings at RM3,000–RM10,000 and PE fees at RM2,000–RM8,000.
Someone says they can settle the council for a fee. Is that legal?
No. Approval comes only from a proper submission and the council's published fees; paying to influence an officer is bribery and an offence for the giver too.
Can I submit plans myself?
Only where the council offers a pelan setara of standard sketches for small jobs; the owner then carries full responsibility for the structure.

Free Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote