MPKL publishes an architect or draughtsman route for alterations, a shop-office partition permit, and little else.
📍 We serve KL, Selangor & Putrajaya.

MPKL (Majlis Perbandaran Kuala Langat) publishes one renovation route for homes: alteration and addition plans for existing residential and commercial buildings, submitted through a registered architect or draughtsman, which its client charter approves within 3 working days of a complete application. It publishes no minor-works list, standard-plan book, fence or house-awning permit. What it does publish in full is a partition-wall permit for shop offices and shophouses only: a sketch plan at the Building Control Department counter, RM50 for each added room, and approval within 3 working days.
MPKL is the local authority for the whole Kuala Langat district in Selangor. It began on 1 January 1977 as the Kuala Langat District Council and was upgraded to a municipal council on 1 March 2020; its area has been 857.70 km² since 2006, and its administration is centred in Banting. The same letters are also used for Majlis Perbandaran Kluang in Johor, so check that any form or announcement you are reading comes from mpkl.gov.my and names Kuala Langat. Your assessment bill (cukai taksiran) shows which council your property sits under.
Building plans are the job of the Building Control Department, Jabatan Kawalan Bangunan (JKB). Its listed function is to process every type of building-plan approval up to the certificate of completion and compliance (CCC), and to carry out building control and enforcement under the Uniform Building By-Laws (Selangor) 1986 and the Street, Drainage and Building Act 1974 (Act 133). The national rules on which works need approval is in ClickBina’s renovation permit guide.
For a house, MPKL’s published route is an alteration and addition application (cadangan tambahan dan ubah suai) for an existing building, made through a registered architect or a registered draughtsman. The JKB section of the client charter promises that applications for additions and alterations to existing residential and commercial buildings made this way are approved within 3 working days from the date a complete application is received. The clock therefore starts only when the file is complete, so the consultant’s checklist matters as much as the drawing.
MPKL’s branch office in Bandar Saujana Putra also receives and processes applications for alteration and addition plans for houses and shops, besides collecting payments and taking business applications. Who may sign and submit plans is explained in ClickBina’s guide to architects, draughtsmen and engineers.
The client charter sets service times for several departments. These are the ones a homeowner or shop owner is most likely to meet, with the department that gives each promise:
| Service | Charter time | Department |
|---|---|---|
| Alteration and addition plans for existing homes and commercial buildings, through a registered architect or draughtsman | Approved within 3 working days of a complete application | Building Control (JKB) |
| Technical comments on new and temporary building plans | 14 working days from receiving the documents from the OSC | Building Control (JKB) |
| Public complaints | Answered within 14 working days | Building Control (JKB) |
| One Stop Centre committee decision | Committee meets twice a month; applicant told within 5 days of the meeting | One Stop Centre (OSC) |
| Road excavation or road-use permit | 14 working days from a complete application | Engineering |
| Release of permit, project or development deposits | 30 working days from a complete application | Engineering |
| Comments on building or changing landscape on the road shoulder in front of a house | 14 working days | Landscape |
A road-use permit is the one most relevant to a renovation that needs a lorry, a bin or materials on the road; MPKL does not say on these pages which renovation jobs need one, so ask the Engineering Department before the work is scheduled.
Several things owners look for on other councils’ sites are not on MPKL’s. They may still exist as counter practice, but nothing published says so, so do not rely on a contractor’s memory of another council’s rule:
A line called “permit ubahsuai kecil” (small renovation permit) does appear in the worked example inside the shop-office partition policy below, but the policy does not define what it covers. Ask JKB what work it applies to before assuming your job fits it.
This is the one renovation permit MPKL publishes in full. Its partition wall permit policy (Dasar Kelulusan Permit Dinding Sesekat) was approved by a council committee on 20 November 2023 and took effect on 1 January 2024. It applies only to shop offices and shophouses (kedai pejabat and rumah kedai) in MPKL’s area, and the applicant is the premises owner or the tenant of the business premises. The main conditions:
A shop fit-out often needs more than this permit, such as fire safety and business-premises approvals; ClickBina’s commercial renovation permit guide sets out the usual order, and the ground-floor shoplot renovation guide covers the building side.
The policy lists the supporting documents for a partition permit application:
The sketch plan itself must colour new temporary construction red, give the size of every added space, show the existing layout such as toilets and stairs, name the road in front of the premises, state the proposed floor finish, and mark any awning structure if an awning permit is applied for together with the partition permit. The checking officer may ask for more, and MPKL encourages applicants to hold a pre-consultation at the JKB counter before submitting.
These charges apply to the shop-office partition permit only; MPKL publishes no equivalent fee list for house renovation:
| Charge | Amount | Basis given in the policy |
|---|---|---|
| Process fee | RM50 for each added room or space | Policy section 1.5(a) |
| Partition built before approval | Five times the process fee | Section 70(14) of Act 133 |
| Compound for an addition already compounded | Not stated; the rate is at the discretion of MPKL’s Yang Dipertua | Policy section 1.5(c) |
| Annual temporary building permit | Floor area x RM10 per 9 m², minimum RM100 | First Schedule, paragraph (13)(h), UBBL Selangor 1986 |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe policy also prints a worked example of a bill. It is an example, not a schedule, but it shows the lines MPKL uses:
| Line on the worked example | Process fee | If work has already started |
|---|---|---|
| Partition, one room | RM50 | RM250 |
| Partition, two rooms | RM100 | RM500 |
| Awning | RM100 | RM500 |
| Ramp | RM100 | RM500 |
| Handrail | RM100 | RM500 |
In the example, the two-room line is ticked under both columns, giving process charges of RM600. Under minor-works permits it adds a building materials permit at RM144, and lists a small renovation permit at RM100 a permit. The annual permit for 25.35 m² of partitioned space comes to the RM100 minimum, and the example total is RM844.
The undertaking letter is a statutory declaration under the Statutory Declarations Act 1960, made before a Sessions Court judge, a magistrate or a commissioner for oaths, and the applicant accepts full responsibility for the materials, position and stability of the partition. How councils generally treat work done without approval is covered in the renovating without a permit guide.
MPKL’s Commissioner of Buildings unit (Unit Pesuruhjaya Bangunan, COB) administers the Strata Management Act 2013 (Act 757) and the Strata Management Regulations 2015 in stratified developments. Its charter promises to process claims on the common-property defect deposit within 14 working days and to investigate and answer each public complaint within 14 working days. The COB line is +6012 300 4282.
MPKL publishes no renovation rule of its own for strata units, so the management body’s house rules, forms and deposit decide what you may do inside a unit; ClickBina’s strata renovation rules guide explains how those usually work.
| Office | Address and telephone |
|---|---|
| Head office | Persiaran Majlis, Jalan Sultan Alam Shah, 42700 Banting; 03-3853 0303; admin@mpkl.gov.my |
| Building Control (JKB) and One Stop Centre (OSC) | Jalan Mahkamah, Telok Datok, 42700 Banting; 03-3853 0303 |
| JKB hotline | +6012-300 4173 |
| OSC hotline | +6012-300 4854 |
| Commissioner of Buildings (COB) unit | +6012 300 4282 |
| Bandar Saujana Putra branch | 24, Jalan SPU 1, Bandar Saujana Putra, 42610 Jenjarom; 03-5102 9699 |
ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around the approval MPKL issues. The MPKL application itself is made by the owner or business tenant for a shop-office partition permit, or by the owner’s architect or draughtsman for alteration and addition plans. WhatsApp us your area, property type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.