Renovation Permit MPKL (Kuala Langat)
The A&A Route, Shop Partitions & Whom to Ask

MPKL publishes an architect or draughtsman route for alterations, a shop-office partition permit, and little else.

📍 We serve KL, Selangor & Putrajaya.

Empty ground-floor shop-office unit in Banting with boards stacked for a new partition

MPKL (Majlis Perbandaran Kuala Langat) publishes one renovation route for homes: alteration and addition plans for existing residential and commercial buildings, submitted through a registered architect or draughtsman, which its client charter approves within 3 working days of a complete application. It publishes no minor-works list, standard-plan book, fence or house-awning permit. What it does publish in full is a partition-wall permit for shop offices and shophouses only: a sketch plan at the Building Control Department counter, RM50 for each added room, and approval within 3 working days.

Which council: MPKL and the Kuala Langat district

MPKL is the local authority for the whole Kuala Langat district in Selangor. It began on 1 January 1977 as the Kuala Langat District Council and was upgraded to a municipal council on 1 March 2020; its area has been 857.70 km² since 2006, and its administration is centred in Banting. The same letters are also used for Majlis Perbandaran Kluang in Johor, so check that any form or announcement you are reading comes from mpkl.gov.my and names Kuala Langat. Your assessment bill (cukai taksiran) shows which council your property sits under.

Building plans are the job of the Building Control Department, Jabatan Kawalan Bangunan (JKB). Its listed function is to process every type of building-plan approval up to the certificate of completion and compliance (CCC), and to carry out building control and enforcement under the Uniform Building By-Laws (Selangor) 1986 and the Street, Drainage and Building Act 1974 (Act 133). The national rules on which works need approval is in ClickBina’s renovation permit guide.

The home route MPKL publishes: plans through an architect or draughtsman

For a house, MPKL’s published route is an alteration and addition application (cadangan tambahan dan ubah suai) for an existing building, made through a registered architect or a registered draughtsman. The JKB section of the client charter promises that applications for additions and alterations to existing residential and commercial buildings made this way are approved within 3 working days from the date a complete application is received. The clock therefore starts only when the file is complete, so the consultant’s checklist matters as much as the drawing.

MPKL’s branch office in Bandar Saujana Putra also receives and processes applications for alteration and addition plans for houses and shops, besides collecting payments and taking business applications. Who may sign and submit plans is explained in ClickBina’s guide to architects, draughtsmen and engineers.

MPKL charter timings that touch a renovation

The client charter sets service times for several departments. These are the ones a homeowner or shop owner is most likely to meet, with the department that gives each promise:

ServiceCharter timeDepartment
Alteration and addition plans for existing homes and commercial buildings, through a registered architect or draughtsmanApproved within 3 working days of a complete applicationBuilding Control (JKB)
Technical comments on new and temporary building plans14 working days from receiving the documents from the OSCBuilding Control (JKB)
Public complaintsAnswered within 14 working daysBuilding Control (JKB)
One Stop Centre committee decisionCommittee meets twice a month; applicant told within 5 days of the meetingOne Stop Centre (OSC)
Road excavation or road-use permit14 working days from a complete applicationEngineering
Release of permit, project or development deposits30 working days from a complete applicationEngineering
Comments on building or changing landscape on the road shoulder in front of a house14 working daysLandscape

A road-use permit is the one most relevant to a renovation that needs a lorry, a bin or materials on the road; MPKL does not say on these pages which renovation jobs need one, so ask the Engineering Department before the work is scheduled.

What MPKL does not publish, and whom to ask

Several things owners look for on other councils’ sites are not on MPKL’s. They may still exist as counter practice, but nothing published says so, so do not rely on a contractor’s memory of another council’s rule:

  • A list of minor works that need no plan, or a residential minor-works permit. Ask JKB on its hotline, +6012-300 4173.
  • A pelan setara (standard-plan) book for porches, rear kitchens or side extensions. Ask JKB whether your job can go in as a sketch or needs full plans.
  • A fence, gate or house-awning permit route, and any height limit for boundary walls. Ask JKB before the wall or frame goes up.
  • Site working hours, roro bin rules or a debris deposit for house renovation. Ask JKB, and the solid waste department for bins.
  • A renovation rule for condos and apartments. Ask your management body first, then MPKL’s Commissioner of Buildings unit (see below).
  • A rule about the contractor you appoint, or a penalty amount for renovating a house before approval.

A line called “permit ubahsuai kecil” (small renovation permit) does appear in the worked example inside the shop-office partition policy below, but the policy does not define what it covers. Ask JKB what work it applies to before assuming your job fits it.

The shop-office partition wall permit

This is the one renovation permit MPKL publishes in full. Its partition wall permit policy (Dasar Kelulusan Permit Dinding Sesekat) was approved by a council committee on 20 November 2023 and took effect on 1 January 2024. It applies only to shop offices and shophouses (kedai pejabat and rumah kedai) in MPKL’s area, and the applicant is the premises owner or the tenant of the business premises. The main conditions:

  • Applications go to the Additions and Alterations Unit (Unit Tambahan dan Ubahsuai) of JKB, with the form, the sketch plan, the documents and the fee.
  • Partitions must be of temporary materials such as gypsum panels or glass panels. No demolition or breaking of the original walls is allowed.
  • The sketch plan follows MPKL’s format and is drawn from the floor plan in the sale and purchase agreement or the original approved plan.
  • A sketch plan may add up to two rooms or spaces. The same allowance applies on each floor when the business uses several floors and the business owner is the same person.
  • More than two rooms cannot use a sketch plan; the plans must go through a registered architect or draughtsman.
  • Premises that already have a CCC for earlier additions may choose between an amendment application and a partition permit.

A shop fit-out often needs more than this permit, such as fire safety and business-premises approvals; ClickBina’s commercial renovation permit guide sets out the usual order, and the ground-floor shoplot renovation guide covers the building side.

Documents and the A3 sketch plan

The policy lists the supporting documents for a partition permit application:

  • A copy of the identity card, and a copy of the land title or an official search.
  • A copy of the sale and purchase agreement or the tenancy agreement for the premises.
  • Copies of the latest paid quit rent and assessment bills.
  • A copy of Form F or the certificate of fitness for premises never renovated, or the approved addition plan with its Form F for premises already altered.
  • A colour-image report of the premises and its interior, in MPKL’s format.
  • Five sets of the A3 sketch floor plan with the application details, signed, and the applicant’s completed undertaking letter.

The sketch plan itself must colour new temporary construction red, give the size of every added space, show the existing layout such as toilets and stairs, name the road in front of the premises, state the proposed floor finish, and mark any awning structure if an awning permit is applied for together with the partition permit. The checking officer may ask for more, and MPKL encourages applicants to hold a pre-consultation at the JKB counter before submitting.

Partition permit fees in the MPKL policy

These charges apply to the shop-office partition permit only; MPKL publishes no equivalent fee list for house renovation:

ChargeAmountBasis given in the policy
Process feeRM50 for each added room or spacePolicy section 1.5(a)
Partition built before approvalFive times the process feeSection 70(14) of Act 133
Compound for an addition already compoundedNot stated; the rate is at the discretion of MPKL’s Yang DipertuaPolicy section 1.5(c)
Annual temporary building permitFloor area x RM10 per 9 m², minimum RM100First Schedule, paragraph (13)(h), UBBL Selangor 1986

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

The policy also prints a worked example of a bill. It is an example, not a schedule, but it shows the lines MPKL uses:

Line on the worked exampleProcess feeIf work has already started
Partition, one roomRM50RM250
Partition, two roomsRM100RM500
AwningRM100RM500
RampRM100RM500
HandrailRM100RM500

In the example, the two-room line is ticked under both columns, giving process charges of RM600. Under minor-works permits it adds a building materials permit at RM144, and lists a small renovation permit at RM100 a permit. The annual permit for 25.35 m² of partitioned space comes to the RM100 minimum, and the example total is RM844.

Approval time, yearly renewal and enforcement

  • A partition permit is issued within 3 working days of a complete application. If the complete application arrives after 3 pm, the three days start the next day.
  • The temporary permit is yearly and must be renewed before 1 January each year; owners or tenants must apply for renewal by November at the latest.
  • If the permit is not renewed, JKB informs MPKL’s Licensing Department (Jabatan Pelesenan), which can then block new or renewed business applications for the premises.
  • No other partition may be added on any floor without a further partition permit.
  • The applicant and the contractor must stop debris and rubbish blocking the drains at the front, side or back of the premises, and the contractor must take waste to a disposal site approved by the government; disposal charges are levied by KDEB.
  • MPKL may demolish a partition that is poorly maintained, unsafe for occupants or the public, or used for unlawful activity, and charge the full cost to the applicant.

The undertaking letter is a statutory declaration under the Statutory Declarations Act 1960, made before a Sessions Court judge, a magistrate or a commissioner for oaths, and the applicant accepts full responsibility for the materials, position and stability of the partition. How councils generally treat work done without approval is covered in the renovating without a permit guide.

Condos, apartments and the Commissioner of Buildings

MPKL’s Commissioner of Buildings unit (Unit Pesuruhjaya Bangunan, COB) administers the Strata Management Act 2013 (Act 757) and the Strata Management Regulations 2015 in stratified developments. Its charter promises to process claims on the common-property defect deposit within 14 working days and to investigate and answer each public complaint within 14 working days. The COB line is +6012 300 4282.

MPKL publishes no renovation rule of its own for strata units, so the management body’s house rules, forms and deposit decide what you may do inside a unit; ClickBina’s strata renovation rules guide explains how those usually work.

Contacting MPKL

OfficeAddress and telephone
Head officePersiaran Majlis, Jalan Sultan Alam Shah, 42700 Banting; 03-3853 0303; admin@mpkl.gov.my
Building Control (JKB) and One Stop Centre (OSC)Jalan Mahkamah, Telok Datok, 42700 Banting; 03-3853 0303
JKB hotline+6012-300 4173
OSC hotline+6012-300 4854
Commissioner of Buildings (COB) unit+6012 300 4282
Bandar Saujana Putra branch24, Jalan SPU 1, Bandar Saujana Putra, 42610 Jenjarom; 03-5102 9699
  • Counter hours at the head office and the Bandar Saujana Putra branch: Monday to Thursday 8.00am to 4.30pm; Friday 8.00am to 12.15pm and 2.45pm to 4.30pm.
  • The partition policy’s letterhead, updated on 11 October 2023, prints the Persiaran Majlis head office, while the current contact page lists JKB and the OSC at Jalan Mahkamah, Telok Datok. Call 03-3853 0303 to confirm which counter takes your application before you go.
  • MPKL’s home page links to OSC online (OSC3) for building submissions and to e-Borang MPKL for its forms.

How ClickBina fits in

ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around the approval MPKL issues. The MPKL application itself is made by the owner or business tenant for a shop-office partition permit, or by the owner’s architect or draughtsman for alteration and addition plans. WhatsApp us your area, property type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.

Sources & official references

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Who approves renovation in Kuala Langat?
MPKL (Majlis Perbandaran Kuala Langat), through its Building Control Department (Jabatan Kawalan Bangunan), for the whole Kuala Langat district. MPKL is not the same body as Majlis Perbandaran Kluang in Johor.
How long does MPKL take to approve a house extension?
MPKL’s charter approves alteration and addition applications for existing homes and commercial buildings, made through a registered architect or draughtsman, within 3 working days of a complete application.
Does MPKL have a pelan setara or minor-works permit for houses?
Not one it publishes. MPKL’s site has no residential minor-works list or standard-plan book, so ask the Building Control Department on +6012-300 4173 how your job should be submitted.
Do I need a permit to add a partition in a shophouse in Banting?
Yes. Since 1 January 2024 MPKL’s partition wall permit covers shop offices and shophouses: temporary materials only, up to two rooms by sketch plan, and RM50 for each added room.
What happens if I build the partition before MPKL approves it?
The policy charges five times the process fee under section 70(14) of Act 133, and a compound may be imposed at the discretion of MPKL’s Yang Dipertua.
Does the partition permit need renewing?
Yes. It is a yearly temporary permit, renewed before 1 January with the application in by November. If it lapses, JKB informs the Licensing Department, which can block business applications for the premises.
Where do I submit plans in Kuala Langat?
MPKL’s contact page lists the Building Control Department and the One Stop Centre at Jalan Mahkamah, Telok Datok, Banting (03-3853 0303), and its portal links to OSC online for submissions.