Main Door, Gate & Grille Defects in New Landed Homes
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏠 Defect Check

Main Door, Gate & Grille Defects in New Landed Homes
What to Check at VP (2026)

The front of the house takes the weather first. How to check the main door, gates and grilles at handover and word the defects.

📍 We serve KL, Selangor & Putrajaya.

New link house with a sagging swing gate scraping the porch tiles and rust at a grille weld

On a new landed house the main door, the gate and the grilles face sun and rain every day, so their defects show early: a timber door that swells or warps because its edges were never sealed, gaps and rain coming in under the door, a lock or deadbolt that will not line up, a gate that drags or will not latch, a sliding gate that jumps its track, and grilles with loose fixings, sharp welds or rust spots. If the developer supplied them, list each defect in writing and send it inside the 24-month defect liability period. If your own contractor fitted them, raise it with that contractor instead.

What main door, gate and grille defects look like

The front of a terrace or semi-D takes the weather head on. The main door may sit under a porch, but driving rain, afternoon sun and humidity still reach it. Gates and grilles are bare metal under a coat of paint or powder coating. At handover the typical faults are a door leaf that sticks or rubs, a visible gap of daylight around the frame, a damp mark on the floor inside after rain, a deadbolt you have to lift the door to close, a gate leaf that scrapes the porch, a sliding gate that grinds or rides off its track, and grille bars that rattle or already show rust at the welds.

Internal and balcony doors have their own check; this page sticks to the external main door, the gate and the grilles. For materials and choices, the main door materials guide explains how timber, steel and composite doors behave in our climate.

First question: who supplied it?

The defect liability period covers what the developer built and supplied. ClickBina's defect liability period guide lists doors and windows, including warped frames, defective locks and gaps at frames, as typically covered, and excludes improvements or additions made by the buyer after handover. Many developers hand over landed houses without gates or grilles, and owners have them fitted by their own contractor straight after VP.

So check your sale and purchase agreement and the developer's handover list. If the developer supplied the gate or grilles, they go on the defect list. If your own contractor fitted them, the defect is between you and that contractor; the guide to a contractor who will not fix defects covers that route.

How to check them at VP

You need a torch and a little patience. If you can, visit once in dry weather and once after rain.

ElementWhat to look forSimple owner check
Main door leafSticking, rubbing, warping, swelling at the bottom edge, unsealed top or bottom edgesOpen and close it slowly; look along the edges with a torch
Frame and gapsUneven gaps, daylight around the frame, loose architraveClose the door, switch off the lights inside and look for light around the edges
ThresholdWater marks inside after rain, a threshold that falls into the houseLook at the floor just inside the door after a storm
Locks, deadbolts and handlesBolt does not line up, key stiff, handle looseLock and unlock every lock several times with the door closed normally
Swing gateLeaf drops at the free end, scrapes the floor, will not latchOpen and close each leaf; check the gap at the pillar top and bottom
Sliding gateGrinding, wheels off the track, track uneven or full of debrisPush it through its full travel by hand
Grilles and grille doorsLoose fixings, rattling bars, sharp welds, rust spots, missed paintShake each grille gently and look at every weld and fixing point

Write the position of each item, such as "main gate, left leaf" or "bedroom 2 window grille". You can tick your defects room by room on ClickBina's checklist tool and add these under the external section.

The main door: swelling, gaps and rain at the threshold

Timber doors move with humidity. A door that has not been sealed on all six faces, including the top and bottom edges, takes up moisture and swells or twists. At handover look along the bottom edge: bare timber there is a fault that will cause trouble later, even if the door closes today. A door that already rubs on the frame or floor will get worse in the wet season.

Daylight around a closed door or water on the floor inside after rain means the frame, the seals or the threshold are not keeping weather out. The door seal and weatherstrip guide explains the seals that close those gaps; at VP, list the gap and let the developer fix it.

Gates: sagging, dragging, latching and the track

A swing gate that drops at its free end scrapes a curve on the porch floor and stops latching. ClickBina's sagging gate guide lists four usual causes: worn or loose hinges, a leaf out of square, a pillar that has moved, and no support at the outer end. On a new house, cracks at the base of a gate pillar or a pillar that leans deserve a place on the defect list, because they point to the foundation of the pillar rather than the gate.

Sliding gates run on a track set into the porch or driveway. Check that the track is straight and level, that the wheels run without grinding, and that water does not stand in the track channel after rain. A track full of cement or debris at handover is a builder's fault, not maintenance.

Grilles: fixings, welds and the paint

Most grilles and gates in Klang Valley homes are mild steel with powder coating or paint on top, and the rusty grille and gate guide explains that the coating is the only protection, so rust starts at every chip. It concentrates at welds, the bottom rail, hinges, lock boxes and anchor points into the wall. Rust on a grille at handover means the coating was damaged or never completed there.

Check fixings as well. A grille or grille door should be fixed into solid brickwork or concrete, not only into the window or door frame, and it should not rattle when shaken. Sharp weld spatter and burrs on a grille door are an injury risk at hand height and belong on the list.

Defect or normal? How to tell the difference

These calls are qualitative. Judge by whether the item closes, locks, keeps weather out and is safe to touch.

FindingUsuallyWhy
Main door rubs, sticks or has to be lifted to lockDefectLeaf or frame out of line
Bare, unsealed top or bottom edge on a timber doorDefect to listMoisture enters and the door swells
Daylight around a closed door, or rain inside after a stormDefectFrame, seal or threshold not weathertight
Gate leaf scrapes the floor or will not latchDefectHinge, leaf or pillar problem
Crack at the base of a gate pillar, or pillar leaningDefect to listPoints to the pillar foundation
Sliding gate grinds or leaves the trackDefectTrack or wheel set wrongly
Rust spot or sharp weld on a new grilleDefectCoating damaged; injury risk
Grille rattles when shakenDefectFixing loose or not into solid structure
Fine variation in timber grain or colourNormalNatural material
Grit or leaves in a gate track after weeks of useNormalRoutine cleaning

Example defect-list wording

Number each item, say where it is and what you want done.

  1. Main door: door rubs on the frame at the top lock side and the deadbolt only engages when the door is lifted. Please adjust the door and frame so it closes and locks freely.
  2. Main door: bottom edge of the timber leaf unsealed; swelling visible. Please seal all edges and rectify the swelling.
  3. Main door threshold: rain enters and wets the floor inside during heavy rain. Please make the door and threshold weathertight.
  4. Main gate, left leaf: leaf drops at the free end, scrapes the porch floor and does not latch. Please rectify the hinges and alignment.
  5. Main gate, left pillar: crack at the base of the pillar. Please inspect and rectify.
  6. Bedroom 2 window grille: grille rattles; fixing appears to be into the window frame only. Please re-fix into the wall.
  7. Kitchen grille door: sharp weld at the lock box and rust spots on the bottom rail. Please grind smooth, treat and repaint.

Send the list in writing and keep a copy. The new house defects guide explains how to submit it and follow up.

What a proper repair should look like

  • The main door is planed and re-hung so gaps are even, and every edge is sealed after planing.
  • Locks and strike plates are realigned so bolts engage without lifting or forcing the door.
  • Weather gaps are closed with proper seals or threshold work, not with a strip of sealant along the floor.
  • Gate hinges are tightened, re-welded or replaced; a racked leaf is braced or rebuilt; a moving pillar is assessed before the gate is adjusted.
  • Sliding gate tracks are cleared, straightened and levelled; worn or wrongly set wheels are replaced.
  • Rust is removed back to bright metal, primed with a metal primer and repainted, rather than painted over.
  • Loose grilles are re-fixed into solid structure.

Check the repair the way you found the defect: close and lock the door, swing the gate, shake the grilles. Note the date on your copy of the list.

If the door sticks again or the rust comes back

A door that sticks again in the wet season was probably planed without being resealed, and rust that reappears within weeks was painted over rather than treated. Report it again in writing as a repeat defect, giving the date of the earlier repair. The defect liability period guide says an inadequate repair should be documented and reported again, because it is a fresh breach of the developer's obligation.

A gate that keeps dropping after its hinges were adjusted often has a pillar or leaf problem underneath. Ask for the cause to be identified in writing before the next adjustment.

Timing: the defect liability period

For a new house bought from a licensed developer, the defect liability period is 24 months from vacant possession. Door swelling and gate sagging tend to show after the first wet season, so check again then and before the period ends. The defect liability period guide says the developer is typically expected to make good within 30 days of receiving your written notice.

If you plan to add an autogate motor, a security door or extra grilles, finish the developer's repairs to the existing items first. New work fixed onto a defective gate or frame makes the original defect hard to prove.

How ClickBina can help

ClickBina offers a defect inspection service in KL & Selangor. We check the main door, gates and grilles with the rest of the house, write a numbered defect list for the developer, and can carry out the rectification for items the developer does not cover or after the period ends. As an experienced KL & Selangor contractor handling whole-house refurbishment and trade coordination, we can bring carpentry, metalwork and painting together as one job.

For repair work, a site visit to quote is arranged on WhatsApp, and any fee is confirmed before we come. We reply within the hour, the price we agree is a flat price with no hidden charges, and ClickBina is registered with SSM.

Sources & methodology

  • ClickBina defect liability period guide: 24 months from vacant possession; doors and windows (warped frames, defective locks, gaps at frames) typically covered; buyer's additions excluded; typical 30-day make-good period.
  • ClickBina sagging swing gate guide: the four usual causes and the pillar check.
  • ClickBina rusty grille and gate guide: mild steel with a coating as the only protection; where rust concentrates; primer before repainting.
  • ClickBina door seal and main door materials guides.

Methodology: defect-versus-normal calls are qualitative; no homeowner-measurable tolerance is published for door gaps or gate drop.

Ready to book a defect inspection?

WhatsApp us your unit type, size and VP date for an inspection quote — we reply within the hour.

💬 WhatsApp for an inspection quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Is a main door that sticks at VP a defect?
Yes. A door that rubs, sticks or has to be lifted to lock is out of line and should be listed for the developer to adjust.
Does the DLP cover a gate I installed myself after VP?
No. ClickBina's defect liability period guide excludes improvements or additions made by the buyer after handover. Raise it with the contractor who fitted it.
Why does my new timber door swell in the rainy season?
Usually because one or more of its edges was not sealed, so the timber takes up moisture. List the unsealed edges at handover.
Is rust on a new grille normal?
No. Rust on a new grille means the coating was damaged or incomplete. It should be cleaned back, primed and repainted.
My gate pillar has a crack at the base. What should I do?
List it. A crack at the base of a pillar or a leaning pillar points to the pillar foundation, which should be assessed before the gate is adjusted.
Rain comes in under my main door. Is that a defect?
Yes, if it happens in normal heavy rain. The door, seals or threshold are not weathertight and should be rectified.
Does ClickBina inspect doors, gates and grilles?
Yes. ClickBina checks them during a defect inspection, writes the defect list and can carry out rectification.