Two routes: the counter’s guidebook and standard plans for the additions they cover, or a PSP’s building plan for the rest.
📍 We serve KL, Selangor & Putrajaya.

Renovation that needs approval from MPHS (Majlis Perbandaran Hulu Selangor) goes one of two ways: a building addition through the Buku Panduan or Pelan Setara counter route, which MPHS’s client charter says is approved on the spot, or a building plan submitted by a PSP (an architect or registered draughtsman) using the council’s “8 jam” additions and alterations checklist. The plan fee on that checklist is worked out per 9 m² of floor area: RM14 for the ground floor with a minimum of RM140, and RM12 for the first floor with a minimum of RM120. A permanent house fence has its own form, with a RM70 processing fee and a RM100 one-off permit.
MPHS, the municipal council for Hulu Selangor, was upgraded from Majlis Daerah Hulu Selangor on 21 October 2021, so older papers still carry the district council name. The council lists five urban areas: Bernam Jaya (Hulu Bernam), Kuala Kubu Bharu, Batang Kali, Serendah and Bukit Beruntung / Bukit Sentosa. Its Building Department (Jabatan Bangunan) handles plan approval for additions and alterations to existing homes, and the route depends on the work:
| Route | What it suits | Who applies | What MPHS publishes |
|---|---|---|---|
| Buku Panduan or Pelan Setara (counter) | Building additions covered by the council’s guidebook or standard plans | Applied for at the Building Department counter | Charter: approved on the spot; fees given at the counter |
| Building plan, “8 jam” checklist (form 2) | Other additions and alterations to an existing house | A PSP: architect or registered draughtsman | Full document list, fee sheet and setbacks |
| Permanent fence permit (form 12) | A permanent fence on a residential lot | A PSP, with four sets of plans | Processing fee, permit fee and plan deposit |
| Minor works permit (form 21) | Small works inside non-residential shophouses and shop-offices only | The owner or tenant of the shop | Work list, fees and deposits |
If your address says Rawang, check your assessment bill before you plan anything: it names the council that collects it, and that council is the one that approves your work. ClickBina’s Rawang area page covers the townships run by MPS (Selayang), and the national rules are in the renovation permit guide.
MPHS’s client charter lists additions made through the Buku Panduan (guidebook) or Pelan Setara (standard plan) as approved on the spot (serta-merta). The council’s department functions page explains how: officers in the Building Department check Buku Panduan and Pelan Setara applications at the counter and sign the approvals there.
MPHS does not publish, in readable form, which works qualify for the guidebook or the standard plans, or what the route costs. Ask the Jabatan Bangunan counter at the head office in Kuala Kubu Bharu, which gives the fees for this route, before you buy materials. Anything the counter turns away goes through a PSP on the building-plan route below.
For other additions and alterations to an existing house, MPHS uses a checklist titled Permohonan Pelan Bangunan 8 jam, which must be filled in by the PSP. The title is the council’s name for the application; MPHS does not publish a processing time for it in its charter. The checklist covers terrace (intermediate, end and corner lot), semi-detached, cluster and detached houses, and asks for:
Form 2’s fee sheet (JB-02) works out the plan processing fee from the floor area, under the First Schedule of the Selangor Uniform Building By-Laws 1986. MPHS’s EVCB form prints the same floor rates and minimums. Each figure is given with the form it comes from:
| Charge | Amount | Where it appears |
|---|---|---|
| Ground floor | RM14 per 9 m², minimum RM140 | Form 2 fee sheet; form 18 fee table |
| First floor | RM12 per 9 m², minimum RM120 | Form 2 fee sheet; form 18 fee table |
| Ground-floor awning or porch | RM7 per 9 m², minimum RM70 | Form 2 fee sheet |
| Amended or as-built plan | RM120 for each amended sheet | Form 2 notes |
| Work built or finished before approval | 10 times the plan processing fee | Form 2 fee sheet |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe fee sheet also has lines for a plan deposit and a RORO compliance charge without printing the amounts. MPHS’s forms page links a separate schedule of plan deposits and RORO compliance charges, so ask the PSP or the counter for the current figures for your house type. Structures that sit over the building setback need a separate permit, and form 2 notes that this permit must be renewed on 1 January every year.
The checklist sets the minimum distances an addition must keep from the lot boundary. These are the figures it prints:
| House type | Setback on the MPHS checklist |
|---|---|
| Terrace: front, wall to boundary | Minimum 20 ft |
| Terrace: front, new porch column to boundary | Minimum 5 ft |
| Terrace: rear, wall to boundary where there is a drain | Minimum 2 ft |
| Detached or semi-detached: front wall / new porch column | Minimum 20 ft / 5 ft |
| Detached or semi-detached: both sides and rear | Minimum 10 ft |
Where there is no rear drain, the checklist allows a terrace rear addition up to the boundary, which is the usual case for a rear kitchen extension. End lots and corner lots carry their own side distances on the same page, so the PSP checks them against your lot before drawing.
A permanent fence on a residential lot has its own checklist (form 12), submitted by a PSP with four sets of coloured plans. The fees on that form are:
The form also notes that the fee depends on the length of fence applied for, and an incomplete application is rejected on the spot.
MPHS’s only published minor-works permit (form 21) is for non-residential buildings: shophouses and shop-offices. The form states that it does not apply to strata units, multi-storey housing or town houses. It covers these works:
| Charge on form 21 | Amount |
|---|---|
| Permit processing, for each work item | RM100 |
| Building materials permit | RM100 |
| Approval sticker | RM20 |
| Permit deposit | RM500 |
| RORO compliance charge | RM500 |
| RORO bin or materials on a public council parking bay | RM25 a bay for 2 weeks or part; RM50 a bay for 1 month or part |
Adding a floor to a shop is not minor work: form 21 says it goes through an additions and alterations plan by an architect or draughtsman registered with LAM. For houses, MPHS publishes no minor-works permit and no list of works that need no permit, so ask the Building Department before you start even internal work.
Strata buildings fall under MPHS’s Building Commissioner division (Pesuruhjaya Bangunan, COB), which administers strata schemes under the Strata Management Act 2013 (Act 757) and issues the certificates that set up Joint Management Bodies. Inside a unit, management approval comes first, as the strata renovation rules guide explains.
Form 2 asks for a copy of the contractor’s certificate of registration with the Construction Industry Development Board, and the owner’s declaration on the same form says the owner will not build without appointing a contractor registered with that board, citing Act 520 section 25(1). Form 21 makes the same demand for shop works. This is MPHS’s rule, printed on its own forms, so check with the Building Department how it applies to your job before you submit, and ask any contractor you are considering for the certificate.
Starting first costs more. Form 2 quotes Uniform Building By-Law 17: if work begins before plans are approved, a fee of 10 times the normal amount may be charged, and paying it does not stop the council from prosecuting. Form 21 adds that, on conviction under section 70(13) of the Street, Drainage and Building Act 1974, a fine can be imposed plus a further fine for every day the offence continues. The renovating without a permit guide explains how enforcement generally works.
ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around MPHS’s setback, fence and RORO rules. The MPHS application itself is made by the owner at the counter for the Buku Panduan or Pelan Setara route, or by a PSP for a building plan. WhatsApp us your area, house type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.