What MyMinor covers for homes and shops, what strata owners must get first, and when you need a plan instead.
📍 We serve KL, Selangor & Putrajaya.

A renovation permit from MPSepang (Majlis Perbandaran Sepang), the council for Cyberjaya and the Sepang district, is applied for online through MyMinor (myMR) for minor works: interior partitions, ceiling finishes, built-in cabinets and tiles, a ground-floor awning within the building line, iron grilles, a 5-foot wall, a fence, garage tiling and electrical work, and solar panels. Strata owners must get the JMB’s endorsement first, with the JMB stamping every sheet of the sketch. Additions and alterations go through a plan submitted by an architect, draughtsman or engineer, which MPSepang approves in 7 to 14 working days once complete.
The Sepang Municipal Council has its headquarters on Persiaran Semarak Api in Cyber 1, Cyberjaya, and its Building Control division handles renovation approvals. For homes and shops it runs two routes:
| Route | For | Who applies | How |
|---|---|---|---|
| MyMinor (myMR) | Minor works on a fixed list of categories | The property owner | Online at myminor.mpsepang.gov.my |
| Additions and alterations plan | Extensions and changes to the building | An architect, draughtsman or engineer you appoint | Checklist PKPB1 and Form A, through the council |
MPSepang describes MyMinor as its online minor building works permit system, built so that property owners in the Sepang district can apply without going to the counter. Not sure whether a job is minor? The council’s plan-submission page tells owners to see its Building Inspector or Building Technician before starting any renovation or addition, for advice on which procedure applies.
MyMinor’s category page lists seven groups of minor works for residential properties:
This is close to the list of jobs most Cyberjaya and Sepang owners plan after getting the keys: built-in wardrobes and a kitchen, a plaster ceiling, new tiles, grilles for the windows and main door, and an awning over the porch. ClickBina’s guides cover the custom kitchen cabinet process, plaster ceilings and grille doors. Electrical work in the garage is on the list, but wiring is a separate trade; WhatsApp us your job details for a quote on that part.
Shop owners and tenants use the same system with a different list:
The category page adds two notes for shops: clinics and learning centres on an upper floor are listed where the premises already has a second staircase, and spa or beauty premises pay an extra charge for each room. Fit-out for a clinic or salon is a bigger brief than a home; the commercial renovation permit guide covers the approvals that usually sit around it.
Internal partitions are on MyMinor’s list for both homes and shops, in the interior category alongside ceiling finishes, built-in cabinets and tiles. For shops the category page adds a condition: no breaking of the structure. So a new partition inside a house or a shop lot is normally a MyMinor application made by the owner, with the partition marked on the floor plan from the sale and purchase agreement; shop owners also state the measurements and materials.
In a condo or serviced residence, the management’s permission letter and the JMB’s stamp on every sheet of the sketch come before the application. Removing a wall, or any work that touches the structure, is not on the MyMinor list: MPSepang’s plan-submission page tells owners to see its Building Inspector or Building Technician before starting, for advice on which procedure applies.
| Document | Landed home or shop | Strata unit |
|---|---|---|
| Assessment (cukai pintu), CCC or Form F | Copy | Copy |
| Owner’s IC (or SSM for a business) | Copy, front and back | Copy, front and back |
| Renovation sketch plan | Floor plan marked with the proposed works | Same, signed and stamped by the JMB on every sheet |
| Sale and purchase or tenancy agreement | Copy | Copy |
| Permission letter from the management (MC / JMB) | Where there is one | Required |
MyMinor’s upload guide fills in the detail. Non-citizen owners attach a passport instead of an IC, and a company attaches its SSM registration (Form D). A home that has not yet been charged assessment attaches its Certificate of Fitness or CCC (Form F), which the developer or JMB can supply. The floor plan for the sketch is usually in the sale and purchase agreement; shop owners must state the measurements and materials. The agreement copy should include the front page, pages 1 to 3 carrying the stamp duty, the page with the owner’s details, the location plan and the signature pages.
MyMinor is explicit that a home or premises with a JMB or strata management must get the management’s confirmation before applying. In practice that means two things: a permission letter from the MC or JMB, and the JMB’s signature and stamp on every sheet of the sketch plan. Most Cyberjaya condos and serviced residences also set their own renovation deposit, working hours and lift booking rules, so read the house rules before you fix dates. The Cyberjaya renovation page covers the housing mix and what these rules mean for compact units.
MyMinor’s category page ends with that waste rule: building waste must be kept in good order and disposed of only at permitted places. For questions, MyMinor lists the e-mail address myminor@mpsepang.gov.my.
| Item | Amount | Applies to |
|---|---|---|
| Plan processing, ground floor | RM3.50 per 9 square metres of floor area, minimum RM35 | Additions and alterations plans |
| Plan processing, upper floors | Lower rates per floor; see MPSepang’s page | Additions and alterations plans |
| Permit to place building materials | RM18 per square metre per month | Plans and minor repair |
| Change of elevation | RM18 per floor | Additions and alterations plans |
| Deposit | RM500 | Additions and alterations plans |
| Minor repair minimum fee and deposit | Listed on MPSepang’s page | Minor repair (MyMinor categories) |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quotePayment is in cash or by cheque made out to Majlis Perbandaran Sepang. The minor-repair section of the same page lists grilles, awnings, fences, house interiors and garages, asks for a copy of the IC, the sale and purchase agreement or land title, and the latest assessment receipt, and sets a minimum fee, the same materials rate and a deposit. Check the current amounts there before you budget.
Anything beyond MyMinor’s categories — an extension at the back, a new porch roof, extra rooms or upper floors — is an application for approval of additional and amendment plans. MPSepang asks owners to see its Building Inspector or Building Technician first, then appoint an architect, draughtsman or engineer to submit; the counter at the Building Control division can give a list of architects and draughtsmen registered with the council.
Approval takes 7 to 14 working days once the documents are complete and the fees paid. Properties near KLIA use a separate checklist, PKPB1-KLIA. The standard-plan and car porch guide explains how plan routes for small additions work in other Selangor councils.
Where the council is silent, we say so rather than guess. Ask the Building Control division before you book contractors; the renovating without a permit guide explains what can follow if work starts without approval.
| Council | Covers | Guide |
|---|---|---|
| PPj | Putrajaya | PPj permit guide |
| MBSJ | Subang Jaya, Puchong, Seri Kembangan | MBSJ permit guide |
| MPKj | Kajang, Bangi, Semenyih | MPKj permit guide |
| DBKL | Kuala Lumpur | DBKL permit guide |
| MBSA | Shah Alam | MBSA permit guide |
Parts of Puchong’s southern fringe fall under MPSepang rather than MBSJ; the council named on your assessment bill is the one that approves the work. The rules every council shares are in ClickBina’s renovation permit guide.
MyMinor is the owner’s application, and plans are submitted by the architect, draughtsman or engineer you appoint; ClickBina does not submit plans. ClickBina is an experienced KL & Selangor contractor: we do the renovation work and coordinate the trades, and we keep the scope inside MyMinor’s categories where that is the route. WhatsApp us your area, property type and the work you have in mind; we'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.