Three main routes: a minor repair permit, a pelan setara standard plan, or a consultant’s plan for the rest.
📍 We serve KL, Selangor & Putrajaya.

Renovation in the Kuala Selangor district is approved by MPKS (Majlis Perbandaran Kuala Selangor) through its Building Control Department, and the form depends on the job: a minor repair permit (JKB04) for six listed works such as floor finishes over 6.5 m², a like-for-like roof finish, built-in cabinets and plaster ceilings; a pelan setara standard plan (JKB02, or JKB03 for strata title) for porches, awnings, fences and kitchens; or an additions and alterations plan (JKB05) drawn by an architect or building draughtsman on the Board of Architects Malaysia register. MPKS’s 2026 client charter approves minor repair permits and pelan setara within one working hour. The bill on JKB04 lists RM100 for processing, RM108 for building materials, a RM5 sticker, a RM120 permit deposit and a RM500 waste deposit.
MPKS’s Building Control Department (Jabatan Kawalan Bangunan, JKB) processes applications for additions and alterations to existing terrace houses, shops and other buildings. It also takes legal action against buildings put up without permission, and it monitors the panel contractors that collect construction waste from these works. Its forms page lists the homeowner forms, and the 2026 client charter sets a time for each route:
| Route | Form | What it covers | Who applies | Charter time |
|---|---|---|---|---|
| Minor repair permit (Permit Pembaikan Kecil) | JKB04 | Six listed works, from floor finishes to plaster ceilings | The owner, or someone holding a valid authorisation letter | Processed and approved within one working hour |
| Pelan setara, individual title | JKB02 | Standard plans for porches, awnings, fences, kitchens and a kitchen with toilet | The owner | Processed and approved within one working hour |
| Pelan setara, strata title | JKB03 | The same route for strata-titled homes, with management and Building Commissioner letters | The owner | Processed and approved within one working hour |
| Additions and alterations plan | JKB05 | Extensions, an extra storey and anything outside the standard plans | An architect or building draughtsman on the LAM register | Approval letter and plan within one working day |
| Temporary permit | JKB06 | Temporary buildings, and electric vehicle charging bays | A qualified engineer, architect or draughtsman | Approval letter and plan within one working day |
MPKS was formed by merging five local councils: Kuala Selangor, Tanjong Karang, Batang Berjuntai (Bestari Jaya), Ijok and Jeram. Its last boundary extension, gazette plan PW 1414 of 25 February 2006, covers the whole of Kuala Selangor District, an area of 119,900 hectares. The council’s background page names towns such as Pekan Kuala Selangor, Ijok, Jeram, Assam Jawa, Bukit Rotan, Seri Tiram Setia and Tanjong Karang, and it lists Puncak Alam, Saujana Utama and Desa Coalfields among its new development areas. Township names and postal addresses do not always follow council lines, so check the council named on your assessment bill before you pick a form. The national rules every council shares are in the renovation permit guide.
The minor repair permit is the quickest MPKS route. Form JKB04 (application form A1, version dated 8 May 2024) lists exactly six kinds of work. The applicant ticks the items that apply and the material chosen for each:
| Item | Work listed on JKB04 | Materials or note printed on the form |
|---|---|---|
| 1 | Installing or changing an indoor floor finish in a shop or house of more than 6.5 m² | Tiles, or another material written in |
| 2 | Changing the roof finish to the existing type and colour, without changing the original structure | Asbestos-free, concrete tile or metal roofing |
| 3 | Building or changing an external floor finish at the front or back of a shop or house of more than 6.5 m² | Tiles, plastered cement (simen lepa) or another material |
| 4 | Breaking an existing wall to add a window or door opening, without changing the original structure | Form note: not applicable to strata-titled homes |
| 5 | Building or replacing built-in cabinets | No size figure printed |
| 6 | Building or replacing a plaster ceiling | No size figure printed |
Only the two floor-finish items carry a size figure, and in both it is more than 6.5 m². The form does not say how a smaller floor job is treated, and MPKS does not publish a list of works that need no permit, so ask JKB before you assume a small tiling job is outside the rules. In signing the form, the owner declares that only the listed minor repair works will be done, that no additions will be built, and that the council may act if the work does not follow its approval.
The reminders on the same form add two limits. Additions to a house or shop may not be built before a plan is approved, and adding a storey goes through an additions and alterations plan submitted by an architect or building draughtsman on the Board of Architects Malaysia (LAM) register.
Pelan setara are MPKS’s ready-made standard plans for the additions owners ask for most. The individual-title form JKB02, in its version dated 3 March 2026, prices each plan the owner buys:
| Standard plan on JKB02 | Price per plan |
|---|---|
| Porch (anjung), terrace house | RM100 |
| Awning (sengkuap), terrace house: front, rear, or the first-floor balcony plan dated 2025 | RM100 each |
| Fence: terrace intermediate lot, terrace and semi-D end or corner lots, and bungalow lots | RM50 each |
| Kitchen (dapur) | RM100 |
| Kitchen and toilet | RM100 |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteStrata-titled homes use form JKB03, which follows the same route but asks for the management body’s consent and a support letter from MPKS’s Building Commissioner Unit (see the strata section below). Any addition outside these plans, and any extra storey, goes through the JKB05 plan route instead. For a kitchen built at the back of a terrace, the rear kitchen extension guide covers the open-space rules and the approval route.
Each MPKS form prints its own bill. The figures below are as printed and attributed to the form they come from; treat them as the council’s published figures and confirm the bill at the JKB counter:
| Charge | Minor repair (JKB04) | Pelan setara, individual (JKB02) | Pelan setara, strata (JKB03) |
|---|---|---|---|
| Permit processing | RM100 | RM50 for each work item | RM140 |
| Building materials placed on site | RM108 (3 m²) | RM324 for three months, or RM648 for six | RM324 for three months, or RM648 for six |
| Approval sticker | RM5 | RM5 | RM5 |
| Permit or plan deposit | RM120 | RM120 | RM120 |
| Waste (and cleanliness) deposit | RM500 | RM500 | RM500 |
| Hoarding permit (zinc, canvas or plastic) | Not on the bill | RM72, except awning-only and fence-only applications | Not on the bill |
| Penalty for building without approval | 9 times the processing fee | 9 times the processing fee | Not on the bill |
An individual-title owner also pays JKB02’s price for each standard plan bought (the table above); the strata form JKB03 does not print plan prices. JKB02 and JKB03 work out the materials fee from a rate of RM36, an estimated site of 3 m² and the number of months, so 36 x 3 x 3 gives RM324.
The minor repair checklist (JKB04) and the individual-title pelan setara checklist (JKB02) ask for much the same papers:
Extensions outside the standard plans, and any additional storey, go through form JKB05 (version dated 2 October 2025), prepared and submitted by an architect or building draughtsman on the LAM register. The checklist asks for six sets of plans (four A1 paper sets, one A1 linen set and one A3 set, all fully coloured), Form A, a copy of the consultant’s LAM practising permit with an acceptance-of-responsibility stamp on every sheet, new works coloured red and demolition coloured blue, and dated colour images of the building.
The plan processing fee follows MPKS’s fee schedule for building plans: the ground floor is charged RM14 per 9 m² with a minimum of RM140, and the first floor RM12 per 9 m² with a minimum of RM120. The plan deposit equals the processing fee, and the same bill lists the RM324 or RM648 materials fee, the RM5 sticker, the RM500 waste and cleanliness deposit, and the RM72 hoarding permit (except awning-only and fence-only applications).
After approval, the architect or draughtsman submits Form B, the notice to start work, four days before work begins on site, and MPKS’s FAQ reminds owners to settle the additions and alterations plan deposit. Plans returned after a pre-check must be collected: if they are not collected within 30 days of submission, the department may dispose of the documents. Neighbour consent uses template JKB15, which says the council needs the neighbour’s consent to approve the building plan. The guide to who can submit building plans explains the consultant’s role.
The temporary permit (JKB06) is a consultant route for temporary buildings. Electric vehicle charging bays go through it with extra letters, including the management body’s consent where relevant and confirmation from TNB or the electricity distributor. Temporary permits are approved from year to year and must be renewed early each following year. Full building plans are processed within 49 working days under the charter, which also commits to at least one site inspection for approvals outside housing schemes. MPKS’s homepage links to OSC 3 Plus Online; its OSC FAQ says online applicants are qualified persons such as architects, engineers, planners and land surveyors, and the MPKS page on the OSC 3.0 Plus portal has an Ubahsuai (renovation) category.
MPKS’s forms do not agree on strata. The JKB04 minor repair checklist asks strata-titled homes for a consent letter from the Joint Management Body (JMB) or Management Corporation (MC) and a support letter from MPKS’s Building Commissioner Unit (Unit Pesuruhjaya Bangunan, COB), and its wall-opening item says that item is not applicable to strata-titled homes. Yet reminder 5 on the same form says these works are not applicable to strata units, multi-storey housing and townhouses.
The strata pelan setara form JKB03 is narrower: its reminder excludes multi-storey housing and townhouses, not strata units in general, and it asks for the same JMB or MC consent and COB support letter. JKB05 asks strata homes for both letters too. If you own a strata unit, confirm with JKB (03-3289 1439 ext 214, 218 or 227) and the COB unit which form, if any, covers your job before you book the work. Management approval sits on top of the council’s own rules, as the strata renovation rules guide explains.
MPKS prints three different multipliers for work done before approval, and each sits on a different line of a different form:
| Where it appears | What it says |
|---|---|
| The bill on JKB04 and JKB02 | A penalty of 9 times the permit processing fee for building without approval, billed when the application is registered |
| The reminders on JKB04, JKB02, JKB03 and JKB05 | Works started before approval can incur 10 times the processing fee, under by-law 17 and the First Schedule of the Uniform Building By-Laws |
| The reminder on the temporary permit form JKB06 | Construction started before approval can incur 20 times the plan processing fee |
| The reminders on JKB04 and JKB05 | On conviction under section 70(13) of the Street, Drainage and Building Act 1974 (Act 133), a fine of up to fifty thousand ringgit, and a further one thousand ringgit for each day the offence continues |
The forms do not say which multiplier the counter applies to a given case, so if work has already started, ask JKB before you submit. A pelan setara application for work already done needs the notice of commencement and statutory declaration listed in the documents section. The renovating without a permit guide explains how enforcement generally works.
The reminders on JKB04, JKB02, JKB03 and JKB05 require the applicant or owner to appoint registered contractors to carry out the works, and say that failing to do so breaches Act 520, the Construction Industry Development Board Act 1994. The forms quote two sections: under subsection 25(1) it is an offence for a contractor not registered under the Act to carry out renovation works, and under subsection 30(1) the board may issue a notice to stop renovation works done by an unregistered contractor. This is MPKS’s rule, printed on its own forms, so check with JKB how it applies to your job before you submit, and ask any contractor you are considering for proof of registration.
ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around MPKS’s waste, hoarding and notice rules. The MPKS application itself is made by the owner for a minor repair permit or pelan setara, or by the owner’s architect or draughtsman for an additions and alterations plan. WhatsApp us your area, house type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.