Renovation Permit MPKS (Kuala Selangor)
Minor Repairs, Pelan Setara or a Plan, Fees & Timing

Three main routes: a minor repair permit, a pelan setara standard plan, or a consultant’s plan for the rest.

📍 We serve KL, Selangor & Putrajaya.

Single-storey Kuala Selangor house with new clay roof tiles stacked on the driveway and a ladder at the porch, paddy fields and coconut palms behind

Renovation in the Kuala Selangor district is approved by MPKS (Majlis Perbandaran Kuala Selangor) through its Building Control Department, and the form depends on the job: a minor repair permit (JKB04) for six listed works such as floor finishes over 6.5 m², a like-for-like roof finish, built-in cabinets and plaster ceilings; a pelan setara standard plan (JKB02, or JKB03 for strata title) for porches, awnings, fences and kitchens; or an additions and alterations plan (JKB05) drawn by an architect or building draughtsman on the Board of Architects Malaysia register. MPKS’s 2026 client charter approves minor repair permits and pelan setara within one working hour. The bill on JKB04 lists RM100 for processing, RM108 for building materials, a RM5 sticker, a RM120 permit deposit and a RM500 waste deposit.

The MPKS approval routes for home renovation

MPKS’s Building Control Department (Jabatan Kawalan Bangunan, JKB) processes applications for additions and alterations to existing terrace houses, shops and other buildings. It also takes legal action against buildings put up without permission, and it monitors the panel contractors that collect construction waste from these works. Its forms page lists the homeowner forms, and the 2026 client charter sets a time for each route:

RouteFormWhat it coversWho appliesCharter time
Minor repair permit (Permit Pembaikan Kecil)JKB04Six listed works, from floor finishes to plaster ceilingsThe owner, or someone holding a valid authorisation letterProcessed and approved within one working hour
Pelan setara, individual titleJKB02Standard plans for porches, awnings, fences, kitchens and a kitchen with toiletThe ownerProcessed and approved within one working hour
Pelan setara, strata titleJKB03The same route for strata-titled homes, with management and Building Commissioner lettersThe ownerProcessed and approved within one working hour
Additions and alterations planJKB05Extensions, an extra storey and anything outside the standard plansAn architect or building draughtsman on the LAM registerApproval letter and plan within one working day
Temporary permitJKB06Temporary buildings, and electric vehicle charging baysA qualified engineer, architect or draughtsmanApproval letter and plan within one working day

MPKS was formed by merging five local councils: Kuala Selangor, Tanjong Karang, Batang Berjuntai (Bestari Jaya), Ijok and Jeram. Its last boundary extension, gazette plan PW 1414 of 25 February 2006, covers the whole of Kuala Selangor District, an area of 119,900 hectares. The council’s background page names towns such as Pekan Kuala Selangor, Ijok, Jeram, Assam Jawa, Bukit Rotan, Seri Tiram Setia and Tanjong Karang, and it lists Puncak Alam, Saujana Utama and Desa Coalfields among its new development areas. Township names and postal addresses do not always follow council lines, so check the council named on your assessment bill before you pick a form. The national rules every council shares are in the renovation permit guide.

Minor repair permit (JKB04): the six listed works

The minor repair permit is the quickest MPKS route. Form JKB04 (application form A1, version dated 8 May 2024) lists exactly six kinds of work. The applicant ticks the items that apply and the material chosen for each:

ItemWork listed on JKB04Materials or note printed on the form
1Installing or changing an indoor floor finish in a shop or house of more than 6.5 m²Tiles, or another material written in
2Changing the roof finish to the existing type and colour, without changing the original structureAsbestos-free, concrete tile or metal roofing
3Building or changing an external floor finish at the front or back of a shop or house of more than 6.5 m²Tiles, plastered cement (simen lepa) or another material
4Breaking an existing wall to add a window or door opening, without changing the original structureForm note: not applicable to strata-titled homes
5Building or replacing built-in cabinetsNo size figure printed
6Building or replacing a plaster ceilingNo size figure printed

Only the two floor-finish items carry a size figure, and in both it is more than 6.5 m². The form does not say how a smaller floor job is treated, and MPKS does not publish a list of works that need no permit, so ask JKB before you assume a small tiling job is outside the rules. In signing the form, the owner declares that only the listed minor repair works will be done, that no additions will be built, and that the council may act if the work does not follow its approval.

The reminders on the same form add two limits. Additions to a house or shop may not be built before a plan is approved, and adding a storey goes through an additions and alterations plan submitted by an architect or building draughtsman on the Board of Architects Malaysia (LAM) register.

Pelan setara standard plans (JKB02 and JKB03)

Pelan setara are MPKS’s ready-made standard plans for the additions owners ask for most. The individual-title form JKB02, in its version dated 3 March 2026, prices each plan the owner buys:

Standard plan on JKB02Price per plan
Porch (anjung), terrace houseRM100
Awning (sengkuap), terrace house: front, rear, or the first-floor balcony plan dated 2025RM100 each
Fence: terrace intermediate lot, terrace and semi-D end or corner lots, and bungalow lotsRM50 each
Kitchen (dapur)RM100
Kitchen and toiletRM100

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Strata-titled homes use form JKB03, which follows the same route but asks for the management body’s consent and a support letter from MPKS’s Building Commissioner Unit (see the strata section below). Any addition outside these plans, and any extra storey, goes through the JKB05 plan route instead. For a kitchen built at the back of a terrace, the rear kitchen extension guide covers the open-space rules and the approval route.

Fees printed on MPKS forms

Each MPKS form prints its own bill. The figures below are as printed and attributed to the form they come from; treat them as the council’s published figures and confirm the bill at the JKB counter:

ChargeMinor repair (JKB04)Pelan setara, individual (JKB02)Pelan setara, strata (JKB03)
Permit processingRM100RM50 for each work itemRM140
Building materials placed on siteRM108 (3 m²)RM324 for three months, or RM648 for sixRM324 for three months, or RM648 for six
Approval stickerRM5RM5RM5
Permit or plan depositRM120RM120RM120
Waste (and cleanliness) depositRM500RM500RM500
Hoarding permit (zinc, canvas or plastic)Not on the billRM72, except awning-only and fence-only applicationsNot on the bill
Penalty for building without approval9 times the processing fee9 times the processing feeNot on the bill

An individual-title owner also pays JKB02’s price for each standard plan bought (the table above); the strata form JKB03 does not print plan prices. JKB02 and JKB03 work out the materials fee from a rate of RM36, an estimated site of 3 m² and the number of months, so 36 x 3 x 3 gives RM324.

Documents MPKS asks for

The minor repair checklist (JKB04) and the individual-title pelan setara checklist (JKB02) ask for much the same papers:

  • The completed application form (form A1 for a minor repair, form SP for pelan setara) and a copy of the owner’s identity card; a company also attaches its ROC registration.
  • The sale and purchase agreement (mandatory for new homes), the land title, or a valid auction agreement.
  • The latest assessment-tax bill (January to June, or July to December).
  • The certificate of fitness for occupation (permanent or temporary), Form F, or confirmation of either.
  • An undertaking letter signed by the owner, in which the owner also accepts liability for damage to the neighbouring house or shop.
  • Printed images of the existing house, front, side and rear views on A4 paper; JKB02 asks for colour images with a recent date.
  • For pelan setara, a neighbour’s consent letter where relevant and, if the work was done before approval, a notice of commencement and a statutory declaration (Akuan Sumpah).
  • A valid authorisation letter if someone other than the owner submits the application.

Additions and alterations plans (JKB05) and temporary permits

Extensions outside the standard plans, and any additional storey, go through form JKB05 (version dated 2 October 2025), prepared and submitted by an architect or building draughtsman on the LAM register. The checklist asks for six sets of plans (four A1 paper sets, one A1 linen set and one A3 set, all fully coloured), Form A, a copy of the consultant’s LAM practising permit with an acceptance-of-responsibility stamp on every sheet, new works coloured red and demolition coloured blue, and dated colour images of the building.

The plan processing fee follows MPKS’s fee schedule for building plans: the ground floor is charged RM14 per 9 m² with a minimum of RM140, and the first floor RM12 per 9 m² with a minimum of RM120. The plan deposit equals the processing fee, and the same bill lists the RM324 or RM648 materials fee, the RM5 sticker, the RM500 waste and cleanliness deposit, and the RM72 hoarding permit (except awning-only and fence-only applications).

After approval, the architect or draughtsman submits Form B, the notice to start work, four days before work begins on site, and MPKS’s FAQ reminds owners to settle the additions and alterations plan deposit. Plans returned after a pre-check must be collected: if they are not collected within 30 days of submission, the department may dispose of the documents. Neighbour consent uses template JKB15, which says the council needs the neighbour’s consent to approve the building plan. The guide to who can submit building plans explains the consultant’s role.

The temporary permit (JKB06) is a consultant route for temporary buildings. Electric vehicle charging bays go through it with extra letters, including the management body’s consent where relevant and confirmation from TNB or the electricity distributor. Temporary permits are approved from year to year and must be renewed early each following year. Full building plans are processed within 49 working days under the charter, which also commits to at least one site inspection for approvals outside housing schemes. MPKS’s homepage links to OSC 3 Plus Online; its OSC FAQ says online applicants are qualified persons such as architects, engineers, planners and land surveyors, and the MPKS page on the OSC 3.0 Plus portal has an Ubahsuai (renovation) category.

Strata homes: what the forms say, and where they disagree

MPKS’s forms do not agree on strata. The JKB04 minor repair checklist asks strata-titled homes for a consent letter from the Joint Management Body (JMB) or Management Corporation (MC) and a support letter from MPKS’s Building Commissioner Unit (Unit Pesuruhjaya Bangunan, COB), and its wall-opening item says that item is not applicable to strata-titled homes. Yet reminder 5 on the same form says these works are not applicable to strata units, multi-storey housing and townhouses.

The strata pelan setara form JKB03 is narrower: its reminder excludes multi-storey housing and townhouses, not strata units in general, and it asks for the same JMB or MC consent and COB support letter. JKB05 asks strata homes for both letters too. If you own a strata unit, confirm with JKB (03-3289 1439 ext 214, 218 or 227) and the COB unit which form, if any, covers your job before you book the work. Management approval sits on top of the council’s own rules, as the strata renovation rules guide explains.

Construction waste, roro bins and the site

  • MPKS’s forms tell the owner to remove construction waste through the panel waste contractors the council has appointed. The RM500 waste deposit is charged, and if the owner does not use the panel, the deposit is reduced at the set rate.
  • The panel list and roro bin rates come from an MPKS attachment dated 6 September 2021 (file updated 7 December 2021), so treat them as dated: bin rental of RM15 a day for a 12 ft or 16 ft bin, emptying at RM250 a pull for the 12 ft bin or RM350 for the 16 ft bin, and no rental charged when the bin is kept less than 21 days, only the emptying charge.
  • Waste may only go to a dump site the council allows. The panel contractor reports the disposal to MPKS in writing with its receipt and the disposal site’s receipt as proof. Panel queries go to MPKS’s solid waste and public cleansing department (Jabatan Pengurusan Sisa Pepejal & Pembersihan Awam) on 03-3289 1439. The debris and roro bin guide covers the practical side.
  • A hoarding of zinc, canvas or plastic needs its own RM72 permit on the pelan setara and plan routes.
  • MPKS does not publish standard renovation working hours in the documents checked. Its overtime-work form (JKB08), written for approved building-plan projects, offers slots of 6pm to 7pm or 6pm to 10pm; ask JKB what applies to a house renovation.

Starting before approval: three different multipliers

MPKS prints three different multipliers for work done before approval, and each sits on a different line of a different form:

Where it appearsWhat it says
The bill on JKB04 and JKB02A penalty of 9 times the permit processing fee for building without approval, billed when the application is registered
The reminders on JKB04, JKB02, JKB03 and JKB05Works started before approval can incur 10 times the processing fee, under by-law 17 and the First Schedule of the Uniform Building By-Laws
The reminder on the temporary permit form JKB06Construction started before approval can incur 20 times the plan processing fee
The reminders on JKB04 and JKB05On conviction under section 70(13) of the Street, Drainage and Building Act 1974 (Act 133), a fine of up to fifty thousand ringgit, and a further one thousand ringgit for each day the offence continues

The forms do not say which multiplier the counter applies to a given case, so if work has already started, ask JKB before you submit. A pelan setara application for work already done needs the notice of commencement and statutory declaration listed in the documents section. The renovating without a permit guide explains how enforcement generally works.

The contractor requirement on MPKS forms

The reminders on JKB04, JKB02, JKB03 and JKB05 require the applicant or owner to appoint registered contractors to carry out the works, and say that failing to do so breaches Act 520, the Construction Industry Development Board Act 1994. The forms quote two sections: under subsection 25(1) it is an offence for a contractor not registered under the Act to carry out renovation works, and under subsection 30(1) the board may issue a notice to stop renovation works done by an unregistered contractor. This is MPKS’s rule, printed on its own forms, so check with JKB how it applies to your job before you submit, and ask any contractor you are considering for proof of registration.

Contacting MPKS

  • Building Control Department (Jabatan Kawalan Bangunan): 03-3289 1439 ext 214, 218 or 227, the line MPKS’s FAQ gives for technical renovation questions.
  • Council headquarters: Majlis Perbandaran Kuala Selangor, Jalan Majlis, 45000 Kuala Selangor, Selangor. General lines 03-3289 1439, 1549, 6331 and 2903; fax 03-3289 1101 or 3386.
  • Official email ydp@mpks.gov.my; complaints aduan@mpks.gov.my or 03-3289 8303.
  • Forms: the JKB forms page lists JKB02, JKB03, JKB04 and JKB05. The versions carry dates from 2023 to 2026, so download the current one before you fill it in.

How ClickBina fits in

ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around MPKS’s waste, hoarding and notice rules. The MPKS application itself is made by the owner for a minor repair permit or pelan setara, or by the owner’s architect or draughtsman for an additions and alterations plan. WhatsApp us your area, house type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.

Sources & official references

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Who approves renovation in Kuala Selangor?
MPKS (Majlis Perbandaran Kuala Selangor), through its Building Control Department. Its boundary covers the whole of Kuala Selangor District, including Jeram, Ijok, Tanjong Karang and Bestari Jaya; for newer townships such as Puncak Alam, check the council named on your assessment bill.
Do I need an MPKS permit to change floor tiles?
MPKS’s minor repair form lists indoor and outdoor floor finishes of more than 6.5 m² among its six works. The form does not say how smaller floor jobs are treated, so ask the Building Control Department on 03-3289 1439 ext 214, 218 or 227.
How long does MPKS take to approve a renovation?
The 2026 client charter approves minor repair permits and pelan setara within one working hour, and issues the approval letter and plan for temporary permits and additions and alterations plans within one working day. Full building plans take up to 49 working days.
How much is the MPKS minor repair permit?
The bill on form JKB04 lists RM100 for processing, RM108 for building materials, a RM5 sticker, a RM120 permit deposit and a RM500 waste deposit.
Can a condo owner use the MPKS minor repair permit?
The forms disagree. JKB04 asks strata homes for JMB or MC consent and a Building Commissioner support letter, but its reminder 5 says the works do not apply to strata units. Confirm with the Building Control Department and the COB unit first.
What happens if I renovate before MPKS approves?
The forms print 9 times the processing fee on the bill, 10 times in the reminders, and 20 times on the temporary permit form. Conviction under section 70(13) of Act 133 can bring a fine of up to fifty thousand ringgit.
Must renovation waste go through MPKS’s panel contractors?
Yes. The forms require disposal through the council’s panel waste contractors and charge a RM500 waste deposit, which is reduced if the owner fails to comply. The published panel list and bin rates date from 2021.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote