Renovation Permit MBPJ (Petaling Jaya): Rules, Fees & Timing
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📋 Permits & Rules

Renovation Permit MBPJ (Petaling Jaya)
What Needs Approval, How to Apply, Fees & Timing

Three routes, three timelines: minor works, standard pelan setara drawings, and additions through a consultant.

📍 We serve KL, Selangor & Putrajaya.

Petaling Jaya terrace house with tiling in progress and a renovation banner on the gate

A renovation permit from MBPJ (Majlis Bandaraya Petaling Jaya) comes by one of three routes: the minor-works form PB.B13 for work that does not touch the structure, the pelan setara standard-plan form PB.B04 for common terrace add-ons, and a full additions-and-alterations plan through a consultant for anything bigger. MBPJ’s FAQ gives a 24-hour approval period (counted in working days) for minor works and pelan setara, and 14 working days for additions and alterations. Applications start online in MBPJ eBuilding and OSC 3.0 Plus. Minor works on a terrace cost RM574 at submission (RM324 for placing materials plus the RM250 processing fee), plus RM50 for the renovation banner, and work is allowed 8am to 6pm, not on Sundays or public holidays.

The three MBPJ routes for home renovation

MBPJ’s Building Control Department (Jabatan Kawalan Bangunan) sorts home renovation by how much it changes the building. The route decides who applies, which form is used and how long approval takes:

RouteWhat it coversWho appliesApproval period (MBPJ FAQ)
Minor works (PB.B13)Changing roof, floor, door or window finishes without changing the structure, on homes, shops and officesThe owner (or a tenant, with the owner’s consent)24-hour, working days
Pelan setara (PB.B04)Standard drawings for terrace houses; bungalows and semi-Ds only a gazebo, fence, guardhouse or dog houseThe owner24-hour, working days
Additions and alterationsWork that adds to the existing structureA consultant14 working days
Partition permit (non-residential)Interior partitions in buildings other than homes; an annual permitA consultant14 working days

Where planning permission is involved, MBPJ asks for that first. The general rules shared by every council are in ClickBina’s renovation permit guide; this page covers MBPJ only.

What the minor-works form covers

Form PB.B13 is for small works that leave the existing structure alone, on residential and non-residential buildings. Its standard letter for works without plans lists the typical jobs:

  • Changing floor tiles and wall tiles.
  • Changing the roof finish while keeping the existing roof structure. A new roof structure (timber, steel or other) needs structural drawings and calculations from a professional engineer.
  • Painting the outside and inside of the building.
  • Other small works, described on the form.
  • Opening up existing partition walls, limited to ten partitions or fewer and to gypsum or glass partitions only. More than ten uses MBPJ’s separate demolition-permission form.

In signing, the owner undertakes to do only the listed works and not to break concrete walls or change the structure. Any later structural change is a new application. The Damansara Perdana page looks at the partition limits in condo towers.

Pelan setara for terrace add-ons

Pelan setara are MBPJ’s standard drawings for the add-ons owners ask for most. The route is for terrace houses; on bungalows and semi-detached houses it only allows a gazebo, fence, guardhouse or dog house. You buy the plan set from the council, fill in three copies, and every registered owner signs the form and the plans in original ink.

  • Houses in areas once run by Majlis Daerah Petaling need a copy of the certificate of fitness.
  • Housing on former mining land and old landfill sites, named on the form as PJS, SS 7 and PJU 1A (Kelana Idaman), needs a structural plan and reinforced-concrete calculations.
  • A guardhouse for a gated community (standard drawing 8a) needs planning permission and is approved as a temporary permit.

The Ara Damansara page and the Kelana Jaya page show how this plays out on particular estates.

Fees on the MBPJ forms

Both forms set out the charges under the First Schedule of the Selangor Uniform Building By-Laws 1986. These are the figures ClickBina’s area pages already quote from the forms:

ChargeAmountForm
Plan processing feeRM250PB.B13 and PB.B04
Placing building materials, terrace houseRM324PB.B13 and PB.B04
Total due at submission, terraceRM574PB.B13 and PB.B04
Renovation banner permitRM50PB.B13 and PB.B04
Pelan setara plan setRM200 a setPB.B04
Placing materials, semi-D, bungalow or non-residentialA higher rate set on the formPB.B13
RORO bin rental and depositPer bin and bin size; waived where a management body existsPB.B13 and PB.B04

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Fees are paid before the application is processed. MBPJ encourages cashless payment through its EPay channel, payment kiosks or card at the counter.

How to apply: eBuilding, OSC 3.0 Plus and the counter

  1. Register for an MBPJ eBuilding login and fill in the application online; MBPJ uses the KPKT OSC 3.0 Plus process as well.
  2. Attach every document the checklist asks for. MBPJ does not accept incomplete applications at the OSC counter.
  3. The application is checked online and the decision is sent by email, so keep your email and phone number current.
  4. Once the online file is complete, MBPJ gives an appointment by email or phone to sign the form and print the processing bill. You cannot walk in without one.
  5. Pay the bill, then hand in the hardcopy at the OSC counter with the online application completed.

Documents for the minor-works form

  • A letter of application from the owner or tenant, and the yellow declaration that works have or have not started.
  • Colour images of the site, inside and outside the building, printed and stuck on A4 paper with the address.
  • Proof of ownership: the title, or the sale and purchase agreement with the existing title or Form 14A; a tenancy agreement if a tenant applies.
  • The owner’s letter of consent, or for strata buildings the JMB or JMC letter.
  • IC copies of the owners, and the latest paid assessment and quit-rent receipts.
  • A statutory declaration before a Commissioner for Oaths, and the owner’s undertakings on the documents and the site works.
  • For companies, the director details; and any earlier temporary-partition approval.

The contractor requirement on MBPJ forms

Both PB.B13 and PB.B04 carry the same reminder: the contractor appointed must be registered with the Construction Industry Development Board, with a registration certificate that is still valid. The form also asks for the contractor’s name and company address. This is MBPJ’s rule, written on its own forms, so check with MBPJ how it applies to your job before you submit, and ask any contractor you are considering for the certificate.

Site conditions: banner, hours, materials and bins

  • The “Kebenaran Ubahsuai” banner must be displayed while work is going on.
  • Work is allowed from 8am to 6pm, not on Sundays or public holidays.
  • Apply to rent council parking bays if you need them for a lorry or bin.
  • No mixing cement on the road. Materials may only sit on the road shoulder at the front, side or back, stacked neatly, out of public drains and clear of traffic, and the site is cleaned when the work ends.
  • RORO bins are hired at rates set by MBPJ’s solid waste department, with a deposit that is reclaimed later. The debris and RORO bin guide covers the practical side.

Condos, apartments and shops

The minor-works form is not limited to landed homes. A strata owner applies with a letter from the JMB or JMC, and a tenant can apply with the tenancy agreement and the owner’s written consent. Interior partitions in non-residential buildings are a separate annual permit made through a consultant. For what PJ management offices usually ask for on top of the council, see the PJ condo renovation guide.

Starting before approval

MBPJ’s FAQ is plain that no building, addition or renovation may be carried out without the council’s prior written permission. The pelan setara form shows what that costs in practice: a penalty of ten times the submission fee where it applies, on top of the normal charges. The renovating without a permit guide explains the wider enforcement steps.

MBPJ area guides

These ClickBina pages apply MBPJ rules to particular neighbourhoods:

AreaWhat the page adds
Petaling JayaThe city overview and MBPJ’s site conditions
SS2PB.B03 additions and room-size minimums
Mutiara DamansaraThe works-without-plans letter
Kota DamansaraFinding your approved plan at MBPJ
Bandar UtamaHalf-storeys and rear kitchens
TropicanaLarge plots and gated-estate sequencing
Petaling Jaya house renovationCosts and planning across PJ

How ClickBina fits in

ClickBina is an experienced KL & Selangor contractor. We do the renovation work and coordinate the trades, and plan the programme around MBPJ’s working hours, banner and materials rules. The MBPJ application itself is made by the owner, or by a consultant for plan submissions. WhatsApp us your area, house type and the work you have in mind; we reply within the hour, and the price we agree is a flat price with no hidden charges.

Sources & official references

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

Do I need an MBPJ permit to change floor tiles?
Yes. Changing floor and wall tiles is one of the jobs on MBPJ’s minor-works form PB.B13, which the owner can apply for without plans as long as no concrete wall is broken.
How much is an MBPJ minor-works permit?
For a terrace house the form adds up to RM574 at submission (RM324 for placing materials and the RM250 processing fee), plus RM50 for the banner. Semi-Ds and bungalows pay a higher materials charge.
How long does MBPJ take to approve renovation?
MBPJ’s FAQ gives a 24-hour period, counted in working days, for minor works and pelan setara, and 14 working days for additions and alterations.
What are MBPJ’s renovation working hours?
8am to 6pm. No work on Sundays or public holidays.
Can a tenant apply for an MBPJ renovation permit?
Yes, for minor works, with a valid tenancy agreement and the owner’s written consent.
Can I use pelan setara for my semi-D extension?
No. For bungalows and semi-detached houses pelan setara only covers a gazebo, fence, guardhouse or dog house; an extension goes through a consultant as an additions-and-alterations plan.
Does MBPJ have rules about the contractor?
Yes. Forms PB.B13 and PB.B04 say the appointed contractor must be registered with the Construction Industry Development Board and hold a valid certificate.