From ageing SS2 terraces to newer Tropicana condos — what PJ homeowners really spend on renovation, and what to plan for before work starts.
📍 We serve KL, Selangor & Putrajaya.

Indicative Klang Valley ranges — Get Your Free Quote.
Petaling Jaya is one of Malaysia's oldest planned townships, gazetted in 1952. That heritage means it has a very wide spread of property ages and types — from 1960s single-storey terraces to brand-new condos. Each era carries its own renovation profile.
| Property type & area | Typical build era | Key renovation needs | Indicative full reno cost |
|---|---|---|---|
| Single-storey terrace (SS2, SS3, Seksyen 17, Seksyen 14) | 1960s – 1980s | Full rewiring (pre-earth wiring), re-piping, roof tile replacement, structural extension, full tiling | RM80,000 – RM180,000 |
| Double-storey terrace (SS15, Kelana Jaya, Damansara Jaya) | 1980s – 1995 | Rewiring, bathroom remodel, kitchen upgrade, ceiling works | RM70,000 – RM150,000 |
| Walk-up flat & low-rise apartment (Seksyen 14, PJ Old Town) | 1970s – 1990s | Waterproofing, tiling, bathroom, basic electrical upgrade | RM30,000 – RM65,000 |
| Mid-rise condo (Damansara Utama / Uptown, PJX) | 1990s – 2010s | Kitchen, bathrooms, built-in carpentry, flooring | RM50,000 – RM110,000 |
| Newer high-rise condo (Tropicana, Damansara Perdana) | 2010s onwards | Cosmetic upgrade, carpentry, feature walls | RM40,000 – RM90,000 |
WhatsApp us your job details — we reply within the hour with a free quote.
💬 Get Your Free QuoteThe single-storey terraces in SS2 and Seksyen 14/17 are among PJ's most beloved addresses — large plots, tree-lined streets, and proximity to Section 14 market. But many were built in the 1960s and 1970s under electrical standards that predate earth-leakage circuit breakers. Renovation contractors working in these areas routinely uncover aluminium wiring, undersized consumer units, and original galvanised steel plumbing that has corroded from the inside. Budgeting for a full rewire and re-pipe is not optional in homes this age — it is a safety baseline.
The table below shows indicative all-in costs for common renovation scopes in Petaling Jaya. Note that older landed properties consistently run higher because of the electrical and plumbing baseline work needed:
| Scope | Landed terrace (PJ) | Condo / apartment (PJ) | Key cost driver |
|---|---|---|---|
| Cosmetic refresh (paint, minor repairs) | RM25,000 – RM50,000 | RM18,000 – RM35,000 | Surface area, condition |
| Mid-range (kitchen + bathrooms + flooring) | RM70,000 – RM130,000 | RM45,000 – RM90,000 | Wet-area trades, cabinet spec |
| Full renovation incl. rewiring + re-pipe | RM100,000 – RM200,000+ | RM60,000 – RM120,000 | Electrical & plumbing upgrade |
| Rear extension (landed only) | RM60,000 – RM150,000 (add-on) | N/A | Structural, council approval |
Use our renovation cost calculator → for a quick indicative estimate, or WhatsApp us for an itemised quote.
A mid-range renovation of a 1970s double-storey terrace in SS2, Seksyen 17 or Kelana Jaya commonly covers:
Condos in Damansara Utama (Uptown), Ara Damansara, and the newer towers near Tropicana and Damansara Perdana have a very different renovation profile — no rewiring needed in most units built post-2000, and no roof to worry about. The focus is interior quality.
Typical condo renovation scope in PJ:
Unlike landed homes, condo renovations in PJ must comply with management rules — see the strata section below.
No other cost category divides PJ renovation budgets as sharply as electrical and plumbing infrastructure. Homes built before 1985 in SS2, Seksyen 14, Damansara Utama and similar areas almost universally need attention on both fronts:
If you are buying an older PJ terrace to renovate, commission a pre-purchase electrical and plumbing inspection before finalising your renovation budget. Discovery during works is more expensive than upfront assessment. See our full renovation cost guide → for national benchmarks.
Petaling Jaya falls under Majlis Bandaraya Petaling Jaya (MBPJ). The level of approval required depends on the type of works:
| Work type | MBPJ approval needed? | Notes |
|---|---|---|
| Interior cosmetic works (paint, flooring, carpentry) | No | No submission required |
| Kitchen & bathroom remodel (no structural changes) | No | But condo units need management approval |
| Hacking non-load-bearing walls | Generally no | Check with your engineer if uncertain |
| Rear extension, additional storey | Yes — Building Plan Approval | Submit via MBPJ OSC; engage a licensed draughtsman / architect |
| Porch extension, boundary wall changes | Yes | Setback rules apply |
| External facade changes affecting streetscape | Varies by area | Some PJ sections are heritage-sensitive |
For structural works, engage a licensed professional to prepare and submit drawings to MBPJ's One-Stop Centre (OSC). Unpermitted structural extensions are a common problem in older PJ terraces — these create complications at SPA signing and can trigger enforcement action. Read our renovation permit guide → for the full framework.
All condo and strata properties in Petaling Jaya are governed by the Strata Management Act 2013 (Act 757). Before any renovation works begin, you must obtain written approval from your Joint Management Body (JMB) or Management Corporation (MC). Typical requirements across PJ condos include:
Starting works without written approval risks having works stopped, losing your deposit, and being liable for any damage to common areas. For a full explainer, see our strata renovation rules guide →.
Based on our project experience in PJ, the most frequently requested renovation works are:
Working with a contractor who knows Petaling Jaya makes a practical difference:
Always get at least three itemised quotes (not lump-sum), confirm the material spec in writing, and agree a milestone payment schedule. See our contractor checklist guide → for the full checklist.
To make the numbers concrete, here is an illustrative budget for a 1,600 sq ft double-storey terrace in SS2, PJ. This is a planning benchmark, not a quote.
| Item | Indicative cost | Notes |
|---|---|---|
| Full rewiring (copper, new DB) | RM16,000 | 16 circuits, ELCB |
| Re-piping (uPVC) | RM10,000 | Ground + first floor |
| Roof tile inspection + partial replacement | RM8,000 | ~30% tiles replaced |
| Kitchen (wet + dry, MR plywood) | RM32,000 | ~60 sq ft, quartz worktop |
| 3 bathrooms (full remodel) | RM36,000 | RM12k each |
| Floor retiling (ground floor) | RM14,000 | 60×60 porcelain, ~900 sq ft |
| Painting (full house, 2 coats) | RM10,000 | Interior + exterior facade |
| Contingency (10%) | RM12,600 | Hidden issues in older fabric |
| Total | ~RM138,600 | Indicative only |
A purely cosmetic version (paint, minor repairs, no electrical/plumbing work) could be RM30,000–RM50,000. Adding a rear extension would add RM80,000–RM130,000 on top of the base scope.
Typical timelines for PJ renovation projects:
PJ's established neighbourhoods mean parking and access for contractor vehicles can be challenging in some sections — discuss logistics with your contractor at quoting stage.
WhatsApp us your job details for a free quote — we reply within the hour.
💬 Get a Free QuoteThis guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:
How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.
Tell us what you need — we reply within the hour.