Kitchen Renovation in Sri Hartamas 2026: Cost & Guide
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Sri Hartamas, KL

Kitchen Renovation
in Sri Hartamas (2026)

Premium condo and landed kitchens in Sri Hartamas — costs, wet & dry layouts, strata rules and a fixed quote from a Klang Valley contractor.

📍 We serve KL, Selangor & Putrajaya.

Finished wet kitchen zone with tiled walls inside a Sri Hartamas home
A kitchen renovation in Sri Hartamas typically costs RM22,000–RM45,000 for a condo wet-and-dry refit and RM50,000–RM95,000+ for landed bungalows or premium homes (indicative 2026, Klang Valley). The final figure depends on your cabinetry run, countertop material, whether you move plumbing or gas, and your condo's strata renovation rules.
📐 Free tool: Try our renovation cost calculator for an instant estimate — no sign-up needed.

Kitchen renovation cost in Sri Hartamas (2026)

Sri Hartamas sits at the premium end of the Kuala Lumpur market — a mix of high-rise condominiums and serviced residences such as Hartamas Regency, Sri Penaga and Ceriaan Kiara, alongside the landed bungalows and link-bungalows on the hill streets off Jalan Sri Hartamas. Kitchen costs here run higher than the KL average because owners tend to specify better finishes and appliances, and because condo work carries extra access and compliance steps. Use the ranges below as a planning guide, then get a measured quote.

ScopeTypical Sri Hartamas range (2026)Best for
Light refit (re-door, new top, re-tile splashback)RM12,000 – RM22,000Tidy condo kitchens that just need a refresh
Full condo wet & dry kitchenRM22,000 – RM45,000New cabinetry, solid-surface tops, tiling, some plumbing moves
Premium / landed kitchenRM50,000 – RM95,000+Bungalows, island layouts, imported appliances, full gut-and-rebuild

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Most Sri Hartamas condo jobs land in the RM22,000–RM45,000 band once you include cabinetry, a quality countertop and proper waterproofing to the wet area.

Condo vs landed kitchens in Sri Hartamas

The two property types renovate very differently. Condo kitchens (the majority of Sri Hartamas stock) are space-constrained and governed by the building's management — you work to fixed renovation hours, book the service lift, and protect common areas. Landed homes give you freedom on layout and the option to extend or open up the kitchen, but structural changes may need a DBKL submission. Knowing which path you are on shapes both the budget and the timeline, so we scope condo and landed jobs separately. See our Malaysia kitchen renovation cost guide for the national baseline.

Wet & dry kitchen layouts for KL homes

Many Sri Hartamas households cook heavy Asian meals, so a split wet-and-dry kitchen is popular: an enclosed wet kitchen with the hob, heavy wok burner and sink keeps grease and smell contained, while the dry kitchen becomes a clean prep-and-serve space, often opened to the dining area with an island or breakfast counter. In compact condos we achieve the split with a glass partition or a sliding door rather than a full wall, preserving light. If you are weighing the layout, our neighbouring Mont Kiara kitchen guide covers similar high-rise stock.

Cabinets & countertops: materials compared

Cabinetry and the worktop are where most of the budget goes, and where Sri Hartamas owners usually trade up. Cabinet carcasses are typically moisture-resistant plywood or marine ply for the wet kitchen; doors range from laminate to melamine, 4G/acrylic and spray-paint. The table compares common countertop choices.

CountertopIndicative price (per ft run)Notes
Solid surface (acrylic)RM180 – RM350Seamless, repairable; softer, avoid very hot pots
Quartz (engineered stone)RM250 – RM550Hard, stain-resistant, low maintenance — the popular premium pick
GraniteRM200 – RM450Heat-tolerant natural stone; needs periodic sealing
Sintered stone / porcelainRM400 – RM800Ultra-durable, large-format; higher fabrication cost

What a Sri Hartamas kitchen renovation includes

A typical full quote covers hacking and disposal of the old kitchen, waterproofing and re-screeding the wet area, wall and floor tiling, new cabinetry (top and bottom units), the countertop and sink/tap, electrical points for appliances, basic plumbing and gas connection, and painting. Appliances (hob, hood, oven, fridge) are usually owner-supplied unless you ask us to include them. We itemise everything so you can see exactly where the money goes.

Strata approval, DBKL permits & deposits

For condos, your management office will require a renovation application, a refundable renovation deposit (commonly RM1,000–RM3,000), and sometimes a contractor's insurance note before work starts. Cosmetic kitchen work rarely needs council approval, but if a landed home involves structural changes, extending the kitchen, or altering the building footprint, that triggers a DBKL submission. We prepare the management paperwork and advise when a DBKL permit is genuinely required so you are not caught out. Our renovation team handles this end to end.

Condo logistics: lift booking, hours & debris

High-rise work in Sri Hartamas means scheduling around the building: most managements allow renovation only on weekdays and Saturday mornings, require the service (cargo) lift to be booked and padded, and insist debris is bagged and removed via the loading bay — not left at the bin centre. Hacking is often restricted to certain hours to limit noise complaints. Building this into the plan avoids stop-work orders and keeps neighbours onside.

How long does a Sri Hartamas kitchen reno take?

A condo wet-and-dry kitchen typically takes 3–6 weeks: roughly one week for hacking and waterproofing, one to two for tiling and wiring, and two to three for cabinetry fabrication and installation (cabinets are usually built off-site, then fitted). Landed and premium kitchens with structural changes run 6–10 weeks. Lift-booking limits and management hours can stretch condo timelines, which is why we lock the schedule with your management up front.

Choosing a kitchen contractor in Sri Hartamas

Pick a contractor who has actually worked in Klang Valley condos and understands strata rules — not just price. Ask to see itemised quotes (beware suspiciously round lump sums), confirm who handles the management application and deposit, check the waterproofing warranty, and confirm cabinet materials in writing. A local team that knows the Sri Hartamas buildings will move faster through approvals and access.

Common mistakes to avoid

The usual regrets: skipping or skimping on wet-area waterproofing (the most expensive thing to redo); under-providing power points for modern appliances; choosing a countertop that cannot take the heat of heavy wok cooking; and starting work before the management application is approved. We design around these so the kitchen lasts.

Why ClickBina for Sri Hartamas kitchens

ClickBina is a Klang Valley renovation and home-services contractor that handles Sri Hartamas condos and landed homes end to end — design, management paperwork, waterproofing, cabinetry and finishing. We give itemised, fixed quotes and reply within the hour on WhatsApp. Tell us your unit and what you have in mind for a same-day ballpark.

Ready to price your job?

WhatsApp us your job details for a free quote — we reply within the hour.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & official references

This guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

How much does a kitchen renovation cost in Sri Hartamas?
Budget roughly RM22,000–RM45,000 for a full condo wet-and-dry kitchen and RM50,000–RM95,000+ for landed bungalows or premium homes (indicative 2026, Klang Valley). A light refit can start around RM12,000.
Do I need DBKL approval to renovate my kitchen?
Cosmetic kitchen work — new cabinets, tops, tiling — generally does not need council approval. A DBKL submission is needed when a landed home involves structural changes or extending the building footprint. We advise when it applies.
What is the difference between a wet and dry kitchen?
The wet kitchen is an enclosed space for heavy cooking (wok burner, hob, main sink) that contains grease and smell; the dry kitchen is a clean prep-and-serve area, often opened to the dining space. The split suits Sri Hartamas households that cook a lot.
How long does a condo kitchen renovation take in Sri Hartamas?
Usually 3–6 weeks for a condo wet-and-dry kitchen, longer for premium or landed kitchens with structural work. Management renovation hours and service-lift booking can extend the schedule.
Which countertop is best — quartz, solid surface or granite?
Quartz is the popular premium choice for its hardness and low maintenance. Solid surface gives a seamless, repairable finish. Granite handles heat well but needs periodic sealing. We help you match the worktop to how you cook.
Can you work within my condo's renovation rules and deposit?
Yes. We prepare the management renovation application, work to the building's permitted hours, book and protect the service lift, and bag and remove debris properly. The refundable deposit (often RM1,000–RM3,000) is paid to your management.
Do you handle landed bungalow kitchens in Sri Hartamas too?
Yes — from open-plan island kitchens to full gut-and-rebuilds, including any DBKL submission for structural changes. Send us your floor plan for a tailored quote.

Get a Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote