House Renovation in Cheras 2026 – Cost, Permits & Tips
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏠 Cheras · Renovation Guide

House Renovation
in Cheras (2026)

Cheras spans KL and Selangor, mixing older landed estates with a booming MRT-corridor condo market — here is what renovation costs and what to plan for.

📍 We serve KL, Selangor & Putrajaya.

Overhead view of a stripped condo unit near the Cheras MRT corridor mid-renovation
House renovation in Cheras typically costs RM40,000–RM190,000+ depending on location, property type and scope. Cheras is a vast corridor stretching from Bandar Sri Permaisuri near KL to Batu 11, Sg Long and beyond in Kajang. The older landed estates (Taman Connaught, Taman Midah, Taman Mutiara) have a renovation profile similar to PJ's older stock — electrical and plumbing upgrades are often needed. The corridor's newer MRT-line condos (Bandar Sri Permaisuri, Taman Suntex, Sg Long) are in modern structural condition. Council jurisdiction depends on location: DBKL on the KL side (including Taman Connaught) or MPKj on the Selangor (Kajang) side.
📐 Free tool: Try our renovation cost calculator for an instant estimate — no sign-up needed.

Indicative Klang Valley ranges — Get Your Free Quote.

Understanding Cheras: KL, Selangor & the MRT corridor

Cheras is one of the Klang Valley's most sprawling and varied corridors. It is important to understand that "Cheras" is not a single administrative area — it straddles the Kuala Lumpur / Selangor boundary and is served by two different local councils:

  • DBKL (Dewan Bandaraya Kuala Lumpur) — governs the KL-side of Cheras, including Bandar Sri Permaisuri, Taman Connaught, Taman Pertama, parts of Taman Suntex, and Taman Midah that fall within the Federal Territory boundary.
  • MPKj (Majlis Perbandaran Kajang) — governs most of the Selangor side, including Taman Bukit Cheras, Sg Long, Taman Mahkota Cheras and surrounding areas.

Knowing your correct local authority matters for permit submissions. Your land title will state the state (Federal Territory or Selangor) and the relevant council. If in doubt, check your cukai pintu (assessment tax) bill — the issuing authority is your local council.

Property types in Cheras & what they need

Cheras's length and development history create a wide mix of property ages and types:

Property type & areaTypical build eraKey renovation needsIndicative full reno cost
Older landed terrace / flat (Taman Midah, Taman Pertama, Miharja)1970s – 1990sRewiring, re-piping, waterproofing, full retiling, kitchenRM65,000 – RM160,000
Taman Connaught double-storey terrace1990s – 2005Kitchen upgrade, bathroom remodel, flooring, paintingRM60,000 – RM135,000
MRT-corridor condo (Bandar Sri Permaisuri, Taman Suntex)2000s – 2015Kitchen, bathrooms, carpentry, flooringRM40,000 – RM90,000
Newer high-rise (along MRT Putrajaya / Kajang lines)2015 – presentCosmetic upgrade, feature wall, carpentryRM35,000 – RM75,000
Semi-D & bungalow (Sg Long, Bandar Mahkota Cheras)2000s onwardsFull interior upgrade, kitchen island, bathroom premiumRM100,000 – RM220,000+

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Renovation cost in Cheras (2026)

ScopeOlder landed (KL/Selangor side)MRT-corridor condoKey cost driver
Cosmetic refreshRM22,000 – RM50,000RM15,000 – RM30,000Surface area
Mid-range (kitchen + bathrooms + flooring)RM60,000 – RM120,000RM38,000 – RM75,000Wet trades, cabinet spec
Full renovation incl. rewiring/re-pipeRM85,000 – RM170,000RM55,000 – RM95,000Electrical + plumbing age
Semi-D full renovationRM120,000 – RM220,000+N/ASize, specification

Use our renovation cost calculator → for a quick estimate.

Older landed estates: Taman Connaught, Taman Midah & surrounding areas

The older parts of Cheras — Taman Midah, Taman Pertama, Miharja and early phases of Taman Connaught — contain landed stock from the 1970s through early 1990s. Many of these homes have been extended informally over the decades and may have a patchwork of wiring generations. Key considerations for renovation:

  • Electrical audit first — before committing to a cosmetic renovation scope, have an electrician assess the consumer unit, wiring era and earthing. Undiscovered aluminium wiring or pre-earth circuits will need to be addressed. A full rewire for a double-storey terrace costs RM12,000–RM20,000.
  • Waterproofing priority — many older Cheras properties show inter-floor leakage, especially in properties that have been extended at ground floor level without proper waterproofing. Address waterproofing before any tiling works.
  • Plumbing inspection — galvanised steel pipes in older Cheras terraces corrode and reduce water pressure to upper-floor bathrooms. uPVC re-piping costs RM8,000–RM16,000 for a full house.
  • Extension compliance — many older Cheras terraces have extensions that predate current planning controls. Before renovating an extended portion, confirm the extension is covered by your land title and has not encroached on setbacks or the road reserve.

MRT-corridor condos: renovation for Cheras' high-growth segment

The opening of the MRT Putrajaya Line (formerly SSP Line) through Cheras, together with the older MRT Kajang Line, has transformed the renovation economics of condos along this corridor. Buildings near Bandar Sri Permaisuri, Taman Naga Emas (TTDI Jaya), Bukit Dukung and down toward Taman Suntex and Sri Petaling now command rental premiums that justify higher renovation investment.

  • Investors renovating MRT-corridor condo units for rental typically spend RM35,000–RM65,000 on a full turnkey renovation and furnishing package.
  • Owner-occupiers in larger units (1,000–1,400 sq ft) along the MRT line invest RM60,000–RM100,000 for a full mid-range renovation.
  • Demand for co-living and room-rental setups is high near MRT stations — some investors convert 3-bedroom units to 4-room layouts with en-suite bathrooms. Confirm this is permissible under your building's house rules before proceeding.

Permits & council approval: DBKL or MPKj

Because Cheras straddles multiple jurisdictions, identifying your correct council is step one before any structural works:

AreaLikely councilStructural approval process
Taman Connaught, Taman Midah, Bandar Sri Permaisuri, Taman PertamaDBKLDBKL Building Plan Approval via OSC; KL-based process
Sg Long, Bandar Mahkota CherasMPKjMPKj OSC; Selangor process, similar to MBSJ

Interior cosmetic works (painting, tiling, kitchen, bathrooms, carpentry) do not require council approval under any of these authorities. Structural changes (extensions, additional storeys, removing load-bearing walls) always require Building Plan Approval from the relevant council. Check your cukai pintu bill or land title for confirmation of jurisdiction. See our renovation permit guide → for details.

Strata & management approval

Cheras has a high density of strata properties, particularly along the MRT corridor. All condo and strata owners must obtain written management / JMB approval before renovation works begin, per the Strata Management Act 2013. Most Cheras buildings require:

  • A refundable renovation deposit (RM500–RM2,000).
  • A renovation plan and material schedule submitted at least 7 days before works begin.
  • Compliance with permitted hours: typically 9am–5pm Monday–Saturday.
  • A contractor indemnity letter and liability insurance certificate.

See our strata renovation rules guide → for the complete framework.

Common renovation projects in Cheras

  • Full gut + rewire of older Taman Connaught terraces — these 1990s–early 2000s homes are increasingly popular with first-time buyers who renovate before moving in.
  • MRT-corridor condo flip renovation — investors buying below-market strata units near Cheras MRT stations and doing full turnkey renovations before listing for rental.
  • Kitchen extension and wet-dry conversion — the original kitchens in most Cheras landed terraces are compact; homeowners frequently extend into the service yard to create a proper wet-dry layout.
  • Ceiling board and plasterwork replacement — many older Cheras homes have water-stained gypsum or Asbestos-era ceiling board that requires full replacement. Always test for asbestos in homes built before 1985.
  • Waterproofing and inter-floor leakage remediation — a persistent issue in older Cheras multi-storey homes and condos. ClickBina handles full waterproofing membrane application with written warranties.

Sg Long & Kajang fringe: a premium sub-market

Sungai Long (Sg Long) and Bandar Mahkota Cheras are often included in the broader Cheras market but represent a distinctly different tier. These township estates (largely 2000s–2015 development) feature larger semi-D and detached houses on generous plots, and are popular with professionals who want more space than KL condos offer at a fraction of the Mont Kiara or Bangsar price premium.

Renovation in Sg Long typically centres on:

  • Full-spec interior renovation — custom kitchen with island, premium bathrooms with rain shower, feature walls, and home-theatre or media room setups: RM120,000–RM200,000 for a 2,500–3,000 sq ft semi-D.
  • Outdoor and garden works — Sg Long's properties generally have garden space. Pergola, decking and landscape work is a popular addition.
  • Smart-home integration — newer Sg Long semi-Ds frequently include smart lighting, automated curtains and security systems as part of their renovation packages.

MPKj is the relevant council for permit submissions in this area.

Choosing a local contractor in Cheras

  • Confirm they know which council jurisdiction applies to your property — DBKL and MPKj have different submission portals and processes.
  • For older Cheras terraces, ensure they have experience with pre-1990 homes and can identify hidden electrical and plumbing issues before quoting.
  • For MRT-corridor condos, confirm they understand the building management requirements and can handle the deposit and plan submission process.
  • Get itemised quotes, not lump sums, and agree a milestone payment schedule.

See our contractor checklist → for the full guide.

Worked example: Taman Connaught double-storey terrace

An illustrative mid-range renovation budget for a 1,500 sq ft double-storey terrace in Taman Connaught (early 2000s build):

ItemIndicative costNotes
Kitchen (wet + dry, MR plywood, quartz worktop)RM28,00050 sq ft kitchen area
3 bathrooms (full remodel + waterproofing)RM33,000RM11k each
Floor retiling (ground floor)RM11,00060×60 porcelain, ~750 sq ft
Built-in carpentry (wardrobes + TV wall)RM18,0003 bedrooms
Painting (full house interior)RM9,0002 coats premium paint
Electrical upgrade (DB board, extra circuits)RM7,000No full rewire needed
Contingency (10%)RM10,600Standard buffer
Total~RM116,600Indicative only

For an older 1980s property in Taman Midah requiring full rewiring and re-piping, add RM18,000–RM28,000 to the above.

⚠️ All costs are indicative 2026 Klang Valley ranges. For a fixed, itemised quote for your Cheras property, WhatsApp ClickBina — we reply within the hour.

Ready to price your job?

WhatsApp us your job details for a free quote — we reply within the hour.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & official references

This guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

How much does house renovation cost in Cheras?
Typically RM40,000–RM190,000+ depending on location, property age and scope. Older landed terraces in Taman Connaught or Taman Midah requiring rewiring and re-piping run RM80,000–RM160,000 for a full mid-range renovation. MRT-corridor condos near Bandar Sri Permaisuri or Sg Long typically cost RM40,000–RM90,000.
Which council governs renovation permits in Cheras?
Cheras straddles two jurisdictions. The KL side (Bandar Sri Permaisuri, Taman Connaught, Taman Midah, Taman Pertama) falls under DBKL. Most of the Selangor side (Sg Long, Bandar Mahkota Cheras) falls under MPKj (Majlis Perbandaran Kajang). Check your cukai pintu bill or land title to confirm your council. Structural changes require Building Plan Approval from the correct authority.
Do I need council approval for interior renovation in Cheras?
No — interior cosmetic works (painting, tiling, kitchen and bathroom remodels, carpentry) do not require council approval from DBKL or MPKj. Structural changes (extensions, removing load-bearing walls, adding a storey) do require Building Plan Approval. Strata owners must also obtain written management approval before any renovation.
How do I know if my older Cheras terrace needs rewiring?
Key signs: two-pin sockets without earth, frequent tripping of fuses, warm or discoloured switch plates, and aluminium wiring visible at the consumer unit. Homes in Taman Midah, Taman Pertama and early Taman Connaught (pre-1990 builds) should have an electrical inspection done before committing to a renovation scope. Undiscovered rewiring needs are the most common cause of Cheras renovation budget overruns.
Is it worth renovating a Cheras condo near the MRT?
Yes — the MRT Kajang and Putrajaya lines have significantly improved Cheras condo rental values. A full renovation of a 3-bedroom unit near an MRT station (RM50,000–RM80,000) typically recovers its cost within 4–6 years through higher rent and lower vacancy. Room-rental setups near university campuses along the Kajang line can deliver even faster payback.
What are permitted renovation hours in Cheras condos?
Most Cheras condo buildings enforce renovation hours of 9am–5pm Monday to Friday, and 9am–1pm Saturday. No Sunday or public holiday works. Confirm the exact hours with your building management — some buildings in Cheras have stricter rules on delivery vehicle access and lobby protection.
Can I extend my Taman Connaught terrace at the rear?
Yes, if your plot allows. Taman Connaught is on the KL side of Cheras, so a rear extension there needs Building Plan Approval from DBKL before any structural works begin. Engage a licensed draughtsman to prepare drawings, and build the approval time into your schedule. Do not start structural works without approval, as unpermitted extensions are an enforcement risk and complicate future property sales.
What is the renovation outlook for Sg Long and Bandar Mahkota Cheras?
Sg Long and Bandar Mahkota Cheras represent a premium semi-D and bungalow market within the broader Cheras corridor. Properties here are newer (mostly 2000s–2015) and structurally sound. Full-spec interior renovations run RM120,000–RM220,000 for a semi-D and are common as owners upgrade to current standards. The area's large plot sizes also support garden and outdoor works that are not possible in more urban Cheras addresses.
Ready to start your Cheras renovation? See ClickBina’s renovation services in Cheras →

Get a Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote