House Renovation in Damansara 2026 – Cost, Councils & Tips
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🏠 Damansara · Renovation Guide

House Renovation
in Damansara (2026)

From Damansara Heights bungalows to Tropicana high-rises — what Damansara homeowners really spend on renovation, and which council governs your address.

📍 We serve KL, Selangor & Putrajaya.

Glass extension being framed onto a Damansara Heights bungalow in warm afternoon light
House renovation in Damansara typically costs RM50,000–RM350,000+ depending on property type, age and finish level. Design-led mid-range renovations of 1980s–1990s landed homes (semi-Ds, bungalows) in Damansara Heights and Damansara Kim commonly run RM120,000–RM280,000 once structural works and premium finishes are included. Condos in Damansara Utama, Tropicana and 1Damansara run RM55,000–RM130,000 for a full premium fit-out. Council jurisdiction is split: most of Damansara Utama, Heights and Kim falls under MBPJ; Damansara City and parts of Sri Damansara fall under DBKL. Always verify before engaging a contractor.
📐 Free tool: Try our renovation cost calculator for an instant estimate — no sign-up needed.

Indicative Klang Valley ranges — Get Your Free Quote.

Property types in Damansara & what they need

“Damansara” covers an arc of affluent addresses on the western edge of Kuala Lumpur and the north of Petaling Jaya, from Damansara Heights (Bukit Damansara, one of KL’s most prestigious addresses) through Damansara Utama (a mature 1970s–1980s township, home to Damansara Uptown), Damansara Kim (SS20, Petaling Jaya), Damansara Perdana and Mutiara Damansara further west. Each sub-area has distinct property stock and its own renovation character:

Sub-areaDominant property typeBuild eraKey renovation needsIndicative full reno cost
Damansara Heights (Bukit Damansara)Bungalow, large semi-D, some terrace1970s – 1990sFull rewiring, re-piping, kitchen, bathrooms, structural extensionRM150,000 – RM500,000+
Damansara Utama (SS21, SS22)Double-storey terrace, semi-D, walk-up condo1970s – 1990sRewiring, bathroom remodel, kitchen upgrade, flooringRM70,000 – RM200,000
Damansara Kim (SS20, Taman Mayang)Double-storey terrace, some semi-D1980s – 1995Kitchen, bathrooms, rewiring, painting, flooringRM65,000 – RM160,000
Tropicana & Mutiara DamansaraMid to high-rise condo, some semi-D1995 – 2015Kitchen, bathrooms, built-in carpentry, premium finishesRM55,000 – RM160,000
Damansara PerdanaMid-rise condo, some service apartment2000s – 2015Kitchen, bathrooms, carpentry, flooringRM45,000 – RM100,000

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Renovation cost in Damansara (2026)

Damansara consistently sits at the higher end of Klang Valley renovation pricing — not only because properties are larger, but because the owner demographic here expects and invests in premium finishes. Contractors working in Damansara regularly encounter clients who benchmark their renovation against regional interior design standards:

ScopeTerrace / semi-D (Damansara)Bungalow (D. Heights)Condo (Damansara)
Cosmetic refresh (paint, flooring, minor works)RM30,000 – RM70,000RM60,000 – RM130,000RM25,000 – RM55,000
Mid-range full renovationRM80,000 – RM200,000RM180,000 – RM380,000RM55,000 – RM130,000
Premium / design-ledRM150,000 – RM350,000+RM300,000 – RM700,000+RM100,000 – RM220,000+

Use our renovation cost calculator → for a quick indicative estimate, or WhatsApp us for an itemised quote.

Landed property renovation scope in Damansara

The landed properties of Damansara Utama, Damansara Heights and Damansara Kim present a renovation profile common to Klang Valley’s 1970s–1990s suburbs: well-built homes on good plot sizes, but with aging electrical and plumbing infrastructure that needs systematic attention. A typical mid-range renovation scope for a Damansara landed property includes:

  • Full rewiring — homes built before 1990 in Damansara Utama and Heights frequently have undersized consumer units and two-pin sockets. A full rewire with new DB board: RM14,000–RM25,000 for a double-storey semi-D.
  • Re-piping — original galvanised steel supply pipes degrade over 30+ years. uPVC replacement: RM9,000–RM18,000 for a semi-D.
  • Kitchen renovation — Damansara owners typically invest in mid-premium finishes: custom cabinetry, quartz or solid-surface worktops, quality appliances. Budget RM30,000–RM70,000 for a full wet-and-dry kitchen in a semi-D.
  • Bathroom overhaul — 2–3 bathrooms in a Damansara semi-D; full remodel with premium sanitaryware and tiling runs RM15,000–RM25,000 per bathroom.
  • Built-in carpentry — custom wardrobes, TV feature walls, shoe cabinets, home study furniture. Budget RM25,000–RM50,000 for a full semi-D.
  • Swimming pool (for bungalows) — many Damansara Heights bungalows have or plan lap pools. New pool installation: RM40,000–RM120,000; renovation of existing pool: RM15,000–RM35,000.

Condo renovation scope in Damansara

Condos in Tropicana, 1Damansara, Kiaramas Ayuria, Surian Residences and the Mutiara Damansara corridor attract a high-income demographic with discerning renovation expectations. A premium condo renovation in Damansara might include features less common in other areas:

  • Custom built-in cabinetry throughout (not just wardrobes) — island kitchen, full home-office built-in, custom vanity
  • Large-format floor tiles (900×900 or book-matched slabs) rather than standard 60×60
  • Smart home provisions — motorised curtains, smart lighting, home automation wiring added during renovation
  • Statement bathrooms — rain shower, heated towel rail, wall-hung toilet, frameless glass enclosure
  • Feature walls — fluted panels, microcement, stone cladding, premium wallpaper

A full premium renovation of a 1,200–1,500 sq ft Damansara condo (kitchen, 2–3 bathrooms, custom carpentry, large-format flooring, smart provisions) typically costs RM100,000–RM180,000.

Design-led renovation: Damansara finishes & expectations

Damansara homeowners consistently invest more in design quality than the Klang Valley average. The most visible cost uplifts in Damansara renovations versus a comparable property in, say, Cheras or Kepong:

  • Material specification. Quartz worktops are standard (not tiles); large-format or book-matched tiles rather than standard 60×60; imported sanitaryware (Hansgrohe, Grohe, Toto) rather than local brands.
  • Custom vs semi-custom joinery. Damansara owners more frequently commission fully custom cabinetry (solid timber or high-quality plywood, custom profiles) rather than semi-custom melamine. This adds 30–60% to carpentry line items.
  • Interior design consultant involvement. Many Damansara renovations are designed by an ID consultant, which adds 10–20% to the project cost as a design fee but typically results in higher specification, better space planning and a more cohesive outcome.
  • Landscaping. Damansara bungalow and semi-D owners commonly include garden landscaping, hardscaping, pool renovation and outdoor lighting as part of the renovation scope — adding RM20,000–RM100,000+.

Permits: MBPJ vs DBKL — which council governs your Damansara address?

Damansara straddles two local authority boundaries, which is a source of frequent confusion:

Sub-areaGoverning councilNotes
Damansara Utama (SS21, SS22), Damansara Kim (SS20), Damansara Heights (Bukit Damansara)MBPJ (Majlis Bandaraya Petaling Jaya)Most structural submissions go to MBPJ OSC
Damansara City, parts of Sri DamansaraDBKL (Dewan Bandaraya KL)Verify your address at DBKL or MBPJ portal before submission
Mutiara Damansara, Damansara PerdanaMBPJPetaling Jaya municipality
Tropicana (Petaling Jaya side)MBPJConfirm via land title / geran

For structural work (extensions, additional storeys, porch changes), always confirm your local authority via your land title or by calling MBPJ (03-7956 4033) or DBKL (03-2617 9000) before engaging a contractor or draughtsman. Submitting to the wrong council causes delays and potential rejection. Read our renovation permit guide → for the full permit process.

Strata & management approval (Damansara condos)

Condominiums in Damansara are typically well-managed and have thorough renovation approval processes. Buildings like Tropicana Golf & Country Resort, 1Damansara, Kiaramas and Surian Residences operate under professional management companies and enforce detailed house rules. Typical Damansara condo renovation approval requirements:

  • Detailed renovation plan and material schedule submitted to management in advance.
  • Renovation deposit (typically RM1,000–RM2,500, refundable).
  • Contractor’s public liability insurance and SOCSO coverage for workers.
  • Working hours compliance — most Damansara condos enforce 9am–5pm or 9am–6pm weekdays; no Sundays or public holidays.
  • Noise-sensitive works (hacking, drilling) may be restricted to morning slots only.

See our strata renovation rules guide → for the full Strata Management Act 2013 framework.

Common renovation projects in Damansara

  • Full semi-D renovation (Damansara Utama, Kim) — rewiring, re-piping, kitchen, 2–3 bathrooms, custom joinery, flooring: RM120,000–RM220,000.
  • Bungalow renovation and extension (Damansara Heights) — the most significant projects we handle, often combining structural extension, swimming pool, full interior redesign and landscaping: RM200,000–RM600,000+.
  • Premium condo fit-out (Tropicana, Kiaramas) — custom cabinetry, large-format tiles, smart home, statement bathrooms: RM100,000–RM180,000 for a 1,200–1,500 sq ft unit.
  • Design-led kitchen upgrade — Damansara owners frequently invest RM40,000–RM80,000+ in a kitchen alone when custom cabinetry, island and imported appliances are included.
  • Rental unit preparation (Damansara Perdana, Mutiara Damansara corridor) — landlords preparing for the expatriate and upper-income rental market: RM60,000–RM100,000.

Choosing a local contractor for Damansara renovation

For Damansara renovations, contractor selection criteria are more exacting than the Klang Valley average:

  • Ask to see completed projects in Damansara specifically — not just general project photos. Contractors who have worked in these buildings and areas understand the access rules, management processes and finish expectations.
  • For premium or bungalow projects, confirm the contractor can work with ID consultants or architects and is experienced in delivering custom joinery and premium finishes to specification.
  • Confirm they handle MBPJ or DBKL submissions (as applicable) for structural works and can advise on which council governs your address.
  • Agree an itemised quotation with material specifications — not just dimensions. In Damansara, the difference between a RM90,000 and a RM160,000 renovation is often driven entirely by the material spec, not the scope.

See our contractor selection guide →.

Worked example: mid-range renovation of a Damansara Kim double-storey semi-D

An illustrative budget for a 2,200 sq ft double-storey semi-D in Damansara Kim (SS20), built circa 1988. A planning benchmark, not a quote.

ItemIndicative costNotes
Full rewiring (copper, new DB board, 3-phase)RM19,00018 circuits, ELCB, 3-phase 60A
Re-piping (uPVC, ground + first floor)RM12,000Replace corroded galvanised steel
Kitchen (wet + dry, custom MR plywood, quartz island)RM55,000~70 sq ft, quartz counters, quality hood & hob
3 bathrooms (full remodel, premium fittings)RM54,000RM18k each; rain shower in master
Large-format floor tiles (ground + first floor)RM28,000800×800 porcelain, ~1,400 sq ft
Custom built-in carpentry (wardrobes, TV wall, study)RM38,0003 bedrooms + living
Painting (full house, 2 coats premium paint)RM12,000Interior + exterior facade
Contingency (10%)RM21,800Structural surprises; pipe rerouting
Total~RM239,800Indicative only

A mid-range (not premium) version with standard tiles and semi-custom cabinets could come in around RM130,000–RM170,000. Adding a rear extension and landscaping could push the budget to RM350,000+.

⚠️ All costs are indicative 2026 Klang Valley ranges. For a fixed, itemised quote for your Damansara property, WhatsApp ClickBina — we reply within the hour.

Ready to price your job?

WhatsApp us your job details for a free quote — we reply within the hour.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & official references

This guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

How much does house renovation cost in Damansara?
Indicatively RM50,000–RM350,000+ depending on property type and finish level. Terrace and semi-D renovations in Damansara Utama and Kim typically run RM80,000–RM200,000; bungalows in Damansara Heights RM180,000–RM500,000+; condos in Tropicana or Kiaramas RM55,000–RM160,000 for a full mid-to-premium renovation.
Which council governs Damansara — MBPJ or DBKL?
Most of Damansara falls under MBPJ (Majlis Bandaraya Petaling Jaya): Damansara Utama (SS21/22), Damansara Kim (SS20), Damansara Heights (Bukit Damansara), Mutiara Damansara and Damansara Perdana. Parts of Damansara City and some Sri Damansara addresses fall under DBKL. Always verify via your land title or call MBPJ or DBKL before planning structural works.
Do older Damansara semi-Ds and bungalows need rewiring?
Almost always, yes. Homes built before 1990 in Damansara Utama, Heights and Kim frequently have undersized consumer units, two-pin sockets and wiring that cannot support modern appliance loads (multiple aircons, induction hob, EV charger). A full rewire for a semi-D costs RM14,000–RM25,000.
How much does a premium condo renovation in Damansara cost?
A full premium renovation of a 1,200–1,500 sq ft Damansara condo (Tropicana, Kiaramas, Surian) with custom cabinetry, large-format tiles, smart home provisions and premium sanitaryware typically costs RM100,000–RM180,000 in 2026.
Do I need management approval to renovate a Damansara condo?
Yes. All Damansara condos require written JMB or MC approval before renovation works begin. Buildings like Tropicana, 1Damansara and Kiaramas have detailed renovation approval processes: plan submission, renovation deposit (RM1,000–RM2,500), contractor insurance, and permitted working hours (typically 9am–5/6pm weekdays only).
What is the typical renovation cost for a Damansara Heights bungalow?
A mid-range full renovation (rewiring, re-piping, kitchen, 3 bathrooms, custom joinery, flooring, painting) of a Damansara Heights bungalow typically costs RM180,000–RM380,000. Premium projects with extensions, swimming pool renovation and landscaping commonly exceed RM400,000.
How long does a Damansara semi-D renovation take?
A mid-range full renovation (kitchen, bathrooms, rewiring, re-piping, flooring, carpentry) of a Damansara semi-D typically takes 12–18 weeks. If MBPJ building plan approval is required for structural work, add 8–16 weeks for the approval process before on-site works begin.
How do I choose a renovation contractor for a Damansara property?
Ask for completed projects in Damansara specifically, confirm they have experience with MBPJ or DBKL submissions as applicable, get itemised quotations with full material specifications, and verify they can work with an ID consultant if you are using one. WhatsApp ClickBina for an itemised quote — send your job details for a free quote, or book a free site visit.
Ready to start your Damansara renovation? See ClickBina’s renovation services in Damansara →

Get a Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote