Per-foot-run prices, what DBKL and your condo management actually require, and how to fit storage into a small unit.
📍 We serve KL, Selangor & Putrajaya.

Custom cabinets in Kuala Lumpur are priced per foot run: about RM180–RM800 per foot for a built-in wardrobe depending on the board, RM280–RM600 per foot for a floating TV console, and from RM180–RM300 per foot for melamine kitchen cabinets. DBKL puts installing a built-in cabinet on its list of work that needs no minor-works permit, so in a landed house the job goes straight to measurement. In a condo the rules that matter are the building’s own by-laws, enforced by its JMB or MC, which usually control delivery, working times and debris.
Strata homes in Kuala Lumpur keep getting smaller. EdgeProp’s analysis of National Property Information Centre (Napic) transaction data found that the median built-up of KL condos fell from 1,140.98 sq ft in 2010 to 1,102.66 sq ft in 2020, and that the 751–1,000 sq ft band rose from 23% to 27% of transactions over the same decade to become the most traded size. The article puts the shrinking down to the “scarcity of land and high land cost in the capital city”.
For carpentry this changes the brief. In a unit in that most-traded band there is rarely a spare room for a stand-alone wardrobe, so built-in storage has to run full height, sit flush with the window wall and share space with a bed, a desk or a TV. The cabinet becomes part of the floor plan rather than furniture added afterwards, and the measurements that decide it are ceiling height, beam drops, the depth of the window ledge and where the aircon trunking and power points already are.
| Home type in KL | Cabinet work people ask for most | What decides the design |
|---|---|---|
| Newer condo or serviced residence | Full-height wardrobes, a TV wall with storage, a compact kitchen run | Small rooms, sliding versus swing doors, building by-laws on delivery and working times |
| Older apartment or walk-up flat | Replacing tired kitchen cabinets and wardrobes, often with mould behind them | Damp walls, uneven floors, narrow stairs or small lifts for carrying in panels |
| Terrace or linked house | Kitchen cabinets for wet and dry kitchens, wardrobes in every bedroom | Longer runs, wet-kitchen moisture, whether other renovation work needs a DBKL permit |
| Semi-detached or bungalow | Walk-in wardrobes, feature TV walls, larger kitchens | Finish level, hardware brand, coordinating with other trades |
DBKL’s own guidelines page reflects this mix: it publishes separate renovation guidelines for 1, 2 and 3-storey terraced houses on standard and small lots, for semi-detached houses, and a separate set for strata buildings. Cabinet work sits at the light end of all of them.
No. DBKL’s Garis Panduan Permit Kerja Kecil (the minor-works permit guideline, third edition) has a list headed “work that does not need a minor-works permit from DBKL”, with no conditions or procedure attached. Item (m) on that list is “Memasang kabinet bina dalam (built-in cabinet)”. The same list covers panel ceilings other than plaster, wallpaper and factory-made grilles. No fee is charged for these items; if you want a paper trail for a future sale, DBKL issues a notification letter for record purposes on request.
Two notes in the same guideline still touch a cabinet job. Building materials and construction waste may not be left outside the premises, such as on the road shoulder or a public area, without a DBKL permit, and disposal of construction waste must follow SWCorp’s requirements. Old cabinets and offcuts count, so plan how they leave the house. If the cabinet is part of a bigger job, such as hacking a kitchen wall or replacing floor tiles, those other items can need their own permit; the DBKL renovation permit guide lists them.
For residential strata, including landed strata, DBKL’s guideline says applications are made through the joint management body (JMB) or management corporation (MC), not directly to DBKL. Cabinets need no council permit in the first place, so in practice the building management is the only approval you deal with.
The Strata Management Act 2013 (Act 757) is why that approval carries weight. Under section 32(3) a JMB may, by special resolution, make additional by-laws for the control, management, use and enjoyment of the building, covering matters such as safety and security, restricted common property, floor coverings, refuse control, behaviour and architectural guidelines, with a capped fine for breaches; section 70 gives an MC the same power once strata titles are issued. Renovation rules sit in these by-laws and the house rules made under them, which is why two condos on the same road can set different renovation deposits, working times and lift arrangements. Ask management for the renovation form before the carcasses are made, and read ClickBina’s strata renovation rules guide for what these forms usually ask.
These are the market bands on ClickBina’s three cabinet cost guides. They are Klang Valley figures, not a special KL rate: no source we use shows KL cabinets priced differently from Selangor.
| Cabinet | Per foot run | A typical job |
|---|---|---|
| Built-in wardrobe | RM180 – RM800, by board and finish | Standard 3-door wardrobe: RM2,500 – RM6,000 |
| Floating or low TV console | RM280 – RM600 | 6 to 8 foot console: RM1,800 – RM4,800 |
| Kitchen cabinets, melamine | RM180 – RM300 | 15–20 foot kitchen, cabinets only: RM4,500 – RM12,000 |
| Kitchen cabinets, laminate door on MR plywood | RM350 – RM600 | Countertop priced separately |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe spread inside each band is mostly the board and the door. A melamine wardrobe and a solid-timber one can be the same width and differ several times in price, and a 2-track aluminium sliding system adds RM200–RM500 per door set. The full breakdowns are on the built-in wardrobe cost guide, the TV cabinet cost guide and the kitchen cabinet cost guide.
MetMalaysia describes the national climate as one of “uniform temperature, high humidity and copious rainfall”, and Kuala Lumpur is no exception. Built-in wardrobes sit tight against walls, and in older KL flats with damp external walls or poor ventilation the back panel is where mould starts. Three choices help: a moisture-resistant (MR) plywood carcass, which the wardrobe cost guide prices at RM350–RM550 per foot run against melamine’s lower band; a small air gap or ventilated back; and fixing the damp wall before the new cabinet hides it. The guide on a mouldy wardrobe back panel covers the repair side.
Kitchens are the other wet zone. In a KL condo the wet and dry kitchens are often one small room, so the sink run is where an MR plywood carcass earns its place, while a dry pantry run can stay on a cheaper board.
| Before you sign | Why it matters in KL |
|---|---|
| Board type per cabinet | Wet kitchens and damp walls need MR plywood; dry rooms may not |
| Door system and hardware brand | Sliding versus swing changes depth and price in small bedrooms |
| Delivery and debris plan | Condo by-laws and DBKL’s note on leaving waste outside the premises |
| Building management form | Approval comes from the JMB or MC, not DBKL, for strata homes |
ClickBina is an experienced KL & Selangor contractor. We design, fabricate and install built-in wardrobes, TV cabinets and kitchen cabinets, and coordinate them with the other trades when cabinets are part of a bigger renovation. The price we agree is a flat price with no hidden charges, itemised per cabinet. The custom cabinets page shows the range, and the KL condo renovation guide covers jobs that go beyond carpentry.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.