SS and USJ terraces: frontage, porch extensions and MBSJ’s forms decide the gate.
📍 We serve KL, Selangor & Putrajaya.

Most Subang Jaya and USJ autogates go on terraces built between the 1970s and 2000, where the plot frontage, an extended car porch and the drain in front decide the gate long before the motor brand does. MBSJ governs the whole area; its forms list an automatic gate as a small-works item and, for detached houses, cap the driveway gate width. ClickBina’s worked example for a typical terrace double-leaf swing gate comes to about RM5,300, inside a Klang Valley range of RM2,500–RM8,000.
The Edge describes Subang Jaya as a former rubber estate developed by Sime UEP Properties in the 1970s, covering SS12 to SS19, Taman Wangsa Baiduri, Taman Mutiara Subang and Taman Bukit Pelangi. In the late 1980s the same developer started UEP Subang Jaya, better known as USJ, now 27 numbered sections plus the lettered sub-sections of USJ 3, Subang Heights and USJ Heights. Residential supply is mostly terraced houses, with condominiums clustered around SS15, SS16 and the lake in SS12.
| Example | What property records show | Why it matters for the gate |
|---|---|---|
| SS12–SS19 | Developed from the 1970s on a former rubber estate (The Edge) | The oldest gates and pillars in the area; check hinges and posts before re-using them |
| USJ 6 | Terraces completed in the early 1990s; intermediate lots from 20 ft by 60 ft, corners 45 ft by 60 ft (StarProperty) | A narrow frontage on intermediate units; corners have room for wider or sliding gates |
| USJ 20 | Two-storey terraces completed in 2000 on 24 ft by 75 ft lots; some with extended car porches (StarProperty) | Extensions often move the porch roof right up to the gate line |
| USJ Heights, Subang Heights | Named separately from the numbered sections (The Edge) | Larger landed homes, where MBSJ’s detached-house checklist applies |
ClickBina’s USJ area page covers the wider renovation rules for these sections, and the Subang Jaya area page covers the SS terraces.
On an intermediate terrace the opening is whatever is left of the plot width after the boundary pillars, so the gate type is mostly decided already. The cost guide puts the standard terrace porch at a 10–14 ft opening and recommends a double-leaf swing gate for it. A sliding gate is the alternative for a short porch, but it needs clear space along one side equal to the opening width, which an intermediate unit in a row rarely has. Corner lots are the exception: the side frontage often makes a sliding or folding gate practical.
Decades of add-ons are part of the USJ landscape; StarProperty notes that some USJ 20 owners extended their car porches, living rooms or kitchens. For an autogate that changes three things: the porch columns may now sit where a swing leaf needs to open, the porch roof may drain onto the gate track, and a motor arm may have nowhere to bolt except an old pillar. Measure the swing arc against the porch columns before choosing double-leaf swing, and ask whether the pillars need rebuilding; the pillar and hinge guide shows what a tired pillar looks like.
Guarded-street schemes have a contested history in USJ. The New Straits Times reported on 1 January 2018 that the council, then MPSJ, dismantled the guardhouse, boom gate and speed bumps funded by the USJ 4 Casablanca residents association. The association said more than three-quarters of residents had consented and that it held council letters, while its application to the land office to occupy the land was still being processed. Whatever the rights of that case, it shows that a street barrier can be removed; the gate at your own porch stays your responsibility. The guarded community guide sets out how such schemes are supposed to be approved.
Subang Jaya floods fast rather than for long. In August 2019 the council said intense rain, around 100mm by its estimate, overwhelmed the secondary drains and flooded the junctions of Persiaran Kewajipan, Persiaran Perpaduan and Persiaran Tujuan; videos showed cars swept along in USJ 8. The drains were not clogged, it said; they lacked capacity. In November 2023 Sinar Daily reported 0.3 m of water in a Subang Jaya mall basement, with floods along Jalan Persiaran Subang and parts of USJ. For a house on those roads, keep the motor and control box clear of the yard’s low point and plan a backup battery; the manual release guide explains what to do if the power goes.
| MBSJ document | What it says that touches a gate job |
|---|---|
| Small-works permit form | “Memasang pagar automatik” (installing an automatic gate) is listed item 12 |
| Pelan setara form for fences and car porches | The first standard plan is a masonry (brick) fence; the form carries a registered architect, engineer or draughtsman and the contractor’s company registration (SSM) |
| Detached-house plan checklist | Driveway gate no wider than 6,096 mm (20 ft) with a hinged mild-steel grating; fence height up to 1,524 mm (5 ft); bin chamber beside the main gate |
In short: an autogate on an existing opening is a small-works item, while rebuilding a brick fence goes through the pelan setara route, and a bungalow plan has its own width and height limits. MBSJ is headquartered in USJ 5 on Persiaran Perpaduan (03-8026 3131); ask its Building Department if your job mixes these.
ClickBina’s cost guide builds up a 12 ft double-leaf mild steel swing gate, the common terrace set-up, like this:
| Component | Indicative cost |
|---|---|
| Gate panels, two leaves, powder-coated mild steel | RM1,800 |
| Swing motor, arm operator with two remotes | RM1,600 |
| Safety sensors (infrared pair) | RM300 |
| Gate posts, if replacing | RM600 |
| Wiring and control board | RM400 |
| Installation and ground works | RM600 |
| Total | about RM5,300 |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteAluminium panels add about RM800–RM1,200 to that, and on a busy through-road a loop detector, RM400–RM800, adds vehicle sensing to the infrared beams. Every line is in the autogate cost guide, and the autogate cost calculator lets you change the inputs.
Re-using an old gate leaf with a new motor is common in the older SS sections, and it works only if the leaf swings freely by hand first. The DC vs AC motor guide explains which motors keep running on battery, and the safety sensor guide covers auto-reverse checks on streets where children walk past the porch.
We do autogate supply and installation as an experienced KL & Selangor contractor, and we serve KL, Selangor & Putrajaya. Tell us your section, house type and opening width on WhatsApp; we reply within the hour, with a flat price and no hidden charges.
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.