Renovation Contractor in Sri Hartamas – ClickBina
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📍 Serving Sri Hartamas

Renovation Contractor
in Sri Hartamas

Three-storey townhouses, semi-Ds, terraces and low-rise condos from the 1980s and 1990s — renovation in Sri Hartamas planned with DBKL’s setback and semi-D rules.

New timber decking on a low-rise townhouse balcony garden in Sri Hartamas
Sri Hartamas has more housing types per street than most KL neighbourhoods, and DBKL treats each type differently. Semi-detached houses have their own renovation guideline, townhouses fall outside the terrace guideline altogether, and garden structures such as pergolas, decks and gazebos follow DBKL’s landed-housing setback rules. This page sets out those rules and the practical side of renovating on Sri Hartamas’s busy, narrow roads.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.

Sri Hartamas was developed from the 1980s on former rubber estate land, with Desa Sri Hartamas following in the 1990s; The Edge describes the Desa Sri Hartamas land as a 260-acre former rubber plantation, originally developed by Sri Hartamas Development. The homes range from three-storey townhouses and three-storey detached houses to two-storey terraces, plus low-rise condominiums such as Sunway Palazzio, Puncak Prima and Menara Hartamas, with built-ups from about 958 to 4,187 sq ft. Plaza Damas and the Jalan Sri Hartamas 1, 7 and 8 area form the commercial core.

Most of the landed stock is now thirty to forty years old. That age, the mix of types and the neighbourhood’s parking pressure are what shape a renovation here, more than any single design trend.

Sri Hartamas quick facts

ItemDetail
Local authorityKuala Lumpur City Hall (DBKL)
Developed1980s (Sri Hartamas); 1990s (Desa Sri Hartamas)
Landed homes3-storey townhouses, 3-storey detached houses, 2-storey terraces, semi-Ds
CondominiumsSunway Palazzio, Puncak Prima, Menara Hartamas and others
Commercial corePlaza Damas and Desa Sri Hartamas

DBKL rules by house type

Semi-detached houses. DBKL’s renovation guideline for existing semi-Ds (approved by its One Stop Centre technical committee in May 2013) sets how an added storey looks: the roof follows the original design, finish and colour, with the original pitch or at most 30°; the new floor-to-ceiling height is capped at 3,000mm; the party wall is cement-rendered and painted to match; no windows may be put in the party wall, nothing may project over the neighbour’s lot, and cat-ladder stairs are not allowed. A registered engineer has to confirm the original structure can carry the new floor.

Townhouses. DBKL’s standard-lot terrace guideline expressly excludes townhouses, cluster homes and strata-titled homes, so an addition to a Sri Hartamas townhouse is a full building-plan submission — and, if the townhouse is on a strata title, the JMB or MC is involved from the start.

Garden structures. DBKL’s setback guideline for landed homes allows an unroofed pergola anywhere but keeps a roofed pergola 1.5m from the lot boundary; a gazebo also keeps 1.5m; a ground-level deck may run to the boundary but an elevated deck keeps 2.3m, as do elevated stairs and ramps; and a pond deeper than 1m keeps 2.3m. On a terrace, eaves and gutters may project up to 0.45m past the rear boundary, but nothing may project past a side boundary.

Townhouses, semi-Ds and 1990s condos

Three-storey townhouses and detached houses. Tall, narrow plans put a lot of staircase and wet area on each floor. At thirty-plus years, the typical brief is to renew bathrooms on every level, re-pipe, and rethink the top-floor rooms that take the most heat and roof water.

Semi-Ds and terraces. Owners often want a covered outdoor room at the back or side. The pergola and deck setbacks above decide whether that is a roofed pergola 1.5m off the boundary or an open structure right up to it.

Low-rise condominiums. Blocks of the 1990s are at the age where inter-floor leaks and original plumbing dominate. Kitchen upgrades are also common — we have a dedicated Sri Hartamas kitchen guide.

Small jobs with their own permit. DBKL’s 2025 minor-works guideline lets a landed owner apply directly for items such as a new gate, a replacement fence or new plaster ceilings, at RM100 per item; each permit covers a single item and the work must finish in three months. For a townhouse on a strata title, the same guideline sends the application through the JMB or MC instead.

Narrow roads, parking and scaffolding

In The Edge’s 2019 cover story, a local interviewee described Desa Sri Hartamas’s roads as narrow and heavily congested at peak hours, with only two entries and exits, limited parking and rampant double parking. For a renovation that is not a side issue: skip bins, lorries and material deliveries all compete for the same kerb.

DBKL’s 2025 minor-works guideline adds a formal step: if the work needs scaffolding or a lorry crane standing outside the lot, the owner must declare it on the application and get approval from DBKL’s urban transport department. Construction waste may not be left outside the premises, such as on the road shoulder, without a DBKL permit. We plan deliveries for off-peak hours and size loads to the street.

Sri Hartamas jobs we quote

Start with our Sri Hartamas kitchen guide, then the wider guides for other jobs:

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Sri Hartamas on the map

We cover Sri Hartamas and Desa Sri Hartamas, from the townhouse streets to the Plaza Damas area.

Neighbouring areas

Close to Sri Hartamas:

Sri Hartamas renovation questions

Can I add a floor to my Sri Hartamas semi-D?
DBKL’s semi-D guideline allows it with conditions: roof to match the original (max 30° pitch), added floor height up to 3,000mm, no windows in the party wall, and a registered engineer’s confirmation of the structure.
Does the terrace guideline apply to my townhouse?
No. DBKL’s standard-lot terrace guideline excludes townhouses, cluster homes and strata-titled homes; an addition needs a full building-plan submission.
How close to the boundary can I build a pergola?
A roofed pergola keeps 1.5m from the lot boundary under DBKL’s landed setback guideline; an unroofed pergola needs no setback.
Can I build a timber deck up to my fence?
A deck at ground level may go to the boundary; an elevated deck keeps 2.3m, according to the same DBKL guideline.
Do I need approval to put scaffolding on the road?
Yes. DBKL’s 2025 minor-works guideline requires scaffolding or a lorry crane outside the lot to be declared and approved by its urban transport department.
Can you price my job without visiting?
Usually. Send your job details over WhatsApp for a free quote and we reply within the hour; if a visit is needed, it is free.

Sources & official references

The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:

Need a Contractor in Sri Hartamas?

WhatsApp us your property details — free quote within the hour.

WhatsApp ClickBina← Home
💬 Get Your Free Quote