Renovation Contractor in Gombak – ClickBina
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
📍 Serving Gombak

Renovation Contractor
in Gombak

Kampung houses along Jalan Gombak, terrace estates and flats near the LRT terminus — renovation under the Selayang council or DBKL, depending on the side of the boundary.

Roofers replacing clay tiles on an older terrace house roof with forested hills behind in Gombak
Gombak is both a Selangor district and a stretch of homes along Jalan Gombak, and it is split between the Selayang council (MPS) and DBKL at the Kuala Lumpur boundary. On the Selangor side two things have changed recently: MPS brought in its first new valuation list since 1992, with added floor space among the reasons bills differ, and it has been demolishing structures built without approval. Both are reasons to get extensions approved before building.

Local facts last reviewed 29 September 2026. Sources are listed at the end of the page.

Gombak district was created on 1 February 1974, on the very date Kuala Lumpur became a Federal Territory. Its district office describes hilly country to the east, north and west and lower ground in the middle, drained by the Sungai Gombak, Sungai Klang and Sungai Batu. The district covers 652.70 sq km and had 942,433 people in 2020, making it the fifth most populous district in the country; the P.098 Gombak parliamentary seat alone counted 349,207.

Along Jalan Gombak itself, the older settlement pattern is still visible. The district office lists village committees at Kampung Sungai Chinchin (Batu 7¾), Kampung Simpang 3 (Batu 6¾), Kampung Tengah (Batu 6¼), Kampung Changkat and Kampung Sungai Pusu, between newer estates such as Taman Desa Gombak, Setapak Garden and Taman Ibukota and the Gombak LRT station at the end of the Kelana Jaya Line.

Gombak key facts

ItemDetail
CouncilsSelayang Municipal Council (MPS) on the Selangor side; DBKL on the Kuala Lumpur side
Districtcreated 1 Feb 1974; 652.70 sq km; 942,433 people (2020)
PopulationP.098 Gombak 349,207 (Census 2020)
EstatesTaman Desa Gombak, Setapak Garden, Taman Ibukota, villages along Jalan Gombak
RailGombak LRT station (Kelana Jaya Line terminus)

The Selayang council’s rules, and why assessment matters now

Approval first. MPS’s Building Department enforces the Street, Drainage and Building Act 1974 and the Uniform Building By-Laws 1984 over building and renovation work, handles applications for additions to houses, and investigates complaints about unauthorised buildings, renovation without permission and illegal connections. On 9 February 2026 it led a 90-strong joint operation that demolished 12 structures built without approval on lots in Kampung Sungai Chinchin, Mukim Setapak, acting under Section 70 of that Act.

The 2025 revaluation. Until 2025, MPS assessment tax was based on rental values from 1992. Its new valuation list, advertised in April 2024, lowered the rate for terrace, detached and strata homes from 8.6% to 5% but applied it to current rents: the council’s own worked example is a two-storey terrace whose assessment rises from RM309.60 to RM900 a year. Among the reasons it gives for bills differing between similar homes is added space and structures. An approved extension is therefore reflected in your bill; an unapproved one can also bring enforcement.

Strata homes. MPS’s Commissioner of Buildings department registers joint management bodies and management corporations and enforces the Strata Management Act 2013 in the Selangor part of Gombak, so a flat owner’s first stop is the JMB or MC. On the Kuala Lumpur side, DBKL’s permits and strata rules apply instead.

Gombak homes: kampung, taman and flats

  • Kampung houses along Jalan Gombak. Houses like these have often grown room by room over the years. Before adding more, it is worth confirming what the council has on record, because unapproved additions are exactly what recent MPS operations targeted.
  • Terrace estates such as Taman Desa Gombak: kitchens, bathrooms and roofs are the usual renewal items, with an MPS application for anything that adds floor space.
  • Flats and apartments near the LRT terminus: interior work under the JMB or MC, and leaks between floors.

Valley drainage and flash-flood hotspots

With hills on three sides and rivers running through the centre, drainage is the recurring local issue. In May 2025 the housing ministry’s local government department visited Sri Gombak to assess an MPS project, BP.1, that upgrades urban drains at flash-flood hotspots in the area. That tells you where the council itself has seen water collect.

For a house on low ground, the renovation choices follow: keep the perimeter drain open and unbridged, set the new floor level of a kitchen or porch extension so rain runs away from the house, and choose finishes low on the walls that survive getting wet. For a kampung house on a slope, check where the roof water goes before you pave the yard.

Jobs Gombak homeowners ask us about

Start with these guides:

Get a free quote on WhatsApp

WhatsApp us your job details — we reply within the hour with a free quote.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

Gombak on the map

We cover the Gombak valley from the LRT terminus and Taman Desa Gombak up Jalan Gombak, and the Kuala Lumpur side of the boundary.

Neighbouring areas

Pages for the areas around Gombak:

  • Setapak — south, split between DBKL and MPS.
  • Selayang — the Selayang council’s own township to the west.
  • Melawati — Taman Melawati, under the Ampang Jaya council.
  • Wangsa Maju — DBKL’s township next to the Gombak boundary.
  • Rawang — the north of the Selayang council area.

Gombak renovation FAQ

Which council covers my Gombak house?
The Selayang council (MPS) on the Selangor side and DBKL on the Kuala Lumpur side. Your assessment bill shows which one.
Why did my MPS assessment go up?
MPS replaced its 1992 valuation basis with a new list in 2025. Rates fell (8.6% to 5% for most homes) but are applied to current rents, and added space or structures also change the valuation.
Does MPS demolish unapproved extensions?
It does act on them: in February 2026 MPS demolished 12 unapproved structures in Kampung Sungai Chinchin under Section 70 of the Street, Drainage and Building Act 1974.
Where does MPS see flash floods in Gombak?
Sri Gombak is one of the hotspots covered by MPS’s BP.1 drain-upgrading project, assessed by the housing ministry in May 2025.
I live in a Gombak flat. Who approves my renovation?
Start with your JMB or MC; MPS’s Commissioner of Buildings oversees them under the Strata Management Act 2013.
How do I get a quote?
WhatsApp us your job details for a free quote; we reply within the hour. If a visit is needed, it is free.

Sources & official references

The local facts on this page were checked against the sources below on 29 September 2026. Council procedures, forms and fees change — confirm the current position with the council before you start work:

Need a Contractor in Gombak?

WhatsApp us your property details — free quote within the hour.

WhatsApp ClickBina← Home
💬 Get Your Free Quote