Walls full of old screw holes and bracket marks? Here is how each kind of hole is repaired so it disappears under the new paint.
📍 We serve KL, Selangor & Putrajaya.

Holes are patched according to the wall and the size of the damage: small screw and anchor holes are filled with ready-mixed filler, larger holes in brick or plaster are built up in layers with a patching compound or mortar, holes in gypsum board are cut back and patched with a board piece or mesh, and cable chases are filled with mortar and finished flush before the wall is skimmed, sanded, primed and painted. The patch must be sealed with primer, or it shows through the new paint. On our guides, prep work such as crack filling, skimming and sanding typically adds RM0.50–RM2 per sq ft to a painting job (indicative 2026, Klang Valley).
A Malaysian home usually has two kinds of internal wall: brick or block walls finished with plaster and skim coat, and gypsum board partitions on a metal frame, common in condos and newer layouts. Knock on the wall: a solid, dull sound is masonry; a hollow sound is board. The repair is different for each.
| Hole | Masonry wall (brick / block, plastered) | Gypsum board wall |
|---|---|---|
| Nail, screw or wall hook | Fill with ready-mixed filler, sand flush | Same: filler, sand flush |
| Wall plug / anchor hole | Pull or cut the plug back, fill in two passes | Remove the anchor, fill; large toggles may need a small patch |
| Old TV bracket (several bolt holes) | Fill each hole; skim over the area if the surface is torn | Fill small holes; replace a damaged section of board if the face has pulled out |
| Fist-sized hole or door-handle dent | Build up with patching mortar in layers | Cut back to a neat square, fix a board piece or mesh patch, joint and skim |
| Cable or pipe chase | Fill with mortar, finish flush, skim the whole strip | Usually not chased; cables run inside the frame |
Filling each hole as a neat, flat spot is what makes the difference. A patch that is sanded flush and primed disappears under the paint; one left rough or unprimed shows as a dull or shiny spot in side light.
When a TV bracket, shelf or cabinet comes off the wall, it often leaves several large holes close together and sometimes a torn surface around them. On masonry, fill each hole and then skim the whole area so it reads as one smooth surface. On gypsum board, if the board face has pulled out around the fixings, cut out that section and patch it rather than trying to fill a crumbling edge.
If you are moving the TV rather than removing it, plan the new position first; our wall plugs and anchors guide explains which fixing each wall needs, so the new holes are the last ones.
For a big hole in a masonry wall, remove anything loose, dampen the edges and build it up with a patching mortar in layers rather than one thick fill, then skim to finish. For gypsum board, the clean method is to cut the damaged area back to a neat square, add a timber or board backing behind if needed, fit a matching piece of board, tape the joints and skim over them. Self-adhesive mesh patches work for smaller holes.
A dent from a door handle is a sign the wall needs a door stopper; our door hinges and stoppers guide covers the options.
After rewiring or re-piping, walls are left with long grooves (chases) where cables or pipes were set in. These are filled with mortar, left to cure, then finished flush. Because a chase is long, the filled strip often shows as a line under paint; skimming a wider band over it, or the whole wall, gives a much better result. Chases that crack along their length later usually mean the fill was too thick in one go or dried too fast.
Filler hides holes, not problems. If a crack keeps reopening, or a patch of wall stays damp, painting over it will not last. Damp walls need the source found first; our paint bubbling and peeling guide explains why paint fails on wet walls. Cracks that keep growing may be structural and need a closer look.
Our DIY painting tools and checklist lists the filler knife, sanding block and primer you need, and the paint types guide explains which primer and topcoat to use.
Holes from wall hooks, shelves and TV brackets are among the most common items at a tenancy handover. Whether they are fair wear or damage depends on the tenancy agreement and how many there are. Our rental unit damage guide explains how landlords and tenants usually treat them, and the turnover repair guide covers the repairs landlords do between tenants.
Patching is rarely priced alone; it is part of the prep in a painting job. These are indicative Klang Valley ranges for 2026, quoted from the ClickBina guides named in the sources section.
| Item | Indicative price | Source guide |
|---|---|---|
| Prep work (crack filling, skimming, sanding) added to painting | RM0.50–RM2 per sq ft | Painting cost guide |
| Repaint touch-up, condo (scuffs, patches, single stained wall) | RM400 – RM900 | Turnover repair guide |
| Bedroom repaint (standard) | RM400 – RM700 | Painting cost guide |
| Internal skim coat | RM1.50 – RM4.00 per sq ft | Render and skim coat guide |
| Single room skim coat (four walls, one coat) | RM600 – RM1,200 | Render and skim coat guide |
| TV wall mounting (new position) | RM80 – RM200 | Wall plugs and anchors guide |
WhatsApp us your job details for a quote — we reply within the hour.
A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.
💬 WhatsApp for a quotePatching, skimming and repainting are one sequence, and they often come with rewiring, a new TV position or a tenancy turnover. ClickBina handles whole-house refurbishment and coordinates the trades, so the holes are repaired before the painters start. WhatsApp us your job details for a quote: the rooms, the kind of wall and roughly how many holes or chases there are. We reply within the hour, the price we agree is a flat price with no hidden charges, and a repair inspection is RM180, deducted from the repair bill if you go ahead.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are indicative Klang Valley market ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.