After a Big Storm: Home Inspection Checklist
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
⛈️ Storm Damage

After a Big Storm
Home Inspection Checklist (2026)

The storm has passed. Here is a safe, ordered way to check the house, from the roof line to the drains.

📍 We serve KL, Selangor & Putrajaya.

Water-stained sagging ceiling with a bucket catching drips in a living room after a storm

After a big storm, check the house in a set order: make it safe first, then walk round the outside looking at the roof, gutters, trees, awnings and gates from the ground, then go inside to check ceilings, windows, power and electronics, and finally the drains. Record what you find before anything is moved, for insurance. Small fixes are often modest: ClickBina's roof leak guide puts clearing valleys, gutters and downpipes at RM150 – RM500 (indicative 2026, Klang Valley).

Safety first

  • Stay off the roof. Wet tiles and metal sheets are slippery, and storm damage may have weakened what you would stand on.
  • Keep away from fallen wires. If a tree or branch is touching overhead power lines, the tree cutting guide is blunt: call TNB, and nobody else.
  • If water is near sockets, a DB box or appliances, switch off at the DB box only if you can reach it without standing in water.
  • Do not stand under a tree with cracked or hanging branches while you look.

The walk-round, in order

Work from the outside in, and from the top down. The table is a checklist you can follow on your phone.

AreaWhat to look forNext step
Roof, from the groundSlipped or missing tiles, lifted metal sheets, bent flashingArrange a roof check; do not climb
Gutters and downpipesOverflowing, sagging, full of leaves, detached bracketsClear and re-fix
Trees and branchesCracked limbs, leaning trunk, lifted roots, branches on the roofPrune or remove; TNB if near wires
Awning, car porch, gate, fenceLoose sheets, twisted frames, gate off its trackSecure loose parts; get them checked
Aircon outdoor unitsDebris in the fins, bracket movement, water around the unitClear debris; test before running for long
Ceilings and walls insideNew stains, sagging ceiling boards, damp patchesTrace the leak before repainting
Windows and doorsWater on sills, wet curtains, leaks at framesCheck seals and drainage slots
Power and electronicsTripped breakers, dead sockets, devices not workingReset once; if it trips again, call an electrician
Drains and floor trapsSlow drains, debris, sewage risingClear debris; check the inspection chamber

Roof and gutters

Most storm leaks come from three places: overflowing gutters and valleys, slipped or cracked tiles, and flashing that has lifted at walls and edges. ClickBina's roof leak in heavy rain guide explains why a roof may only leak in heavy rain and why a stain can appear metres from the actual entry point. Look along the roof from the street, and from an upstairs window if you can see across it.

Wind-driven rain is the other storm culprit: water blown sideways under tiles that keep ordinary rain out. Our wind-driven rain guide covers the sarking and underlay fix. If the storm season is still running, the monsoon roof checklist sets out what to fix before the next one.

Trees and fallen branches

Storms find the weak points in trees: cracked unions where two main stems join, dead branches, and roots loosened in saturated soil. A tree that has started to lean after a storm, or has lifted the ground at its base, needs assessing before the next one. Branches lying on the roof can crack tiles and block gutters, so have them removed rather than left to slide off.

Ceilings, walls and windows

Inside, look up. New brown stains, bubbling paint and sagging ceiling boards all point to water above. A plasterboard ceiling that is sagging and heavy with water should be kept clear underneath, because it can come down. Check window sills, the bottom of sliding door tracks and curtains on the windward side; water that got in only during the storm often points to blocked drainage slots or failed seals rather than broken glass.

Do not repaint a stain straight away. Let it dry and watch whether it returns in the next rain, which tells you whether the leak is still active. If the source is hidden, ClickBina's leak detection is a separate paid visit at RM300 – RM800.

Power and electronics after lightning

Lightning nearby can send a surge through power, phone and data cables. A breaker that trips once and resets may be nothing; one that trips again, a burning smell, or sockets that stay dead need an electrician. For CCTV, ClickBina's CCTV lightning and surge guide gives a clear after-storm routine: check every channel on the recorder, not just the app, confirm it is still recording, play back the storm period, and check the router, because it sits on the same paths and fails quietly. Write down the date; a part that fails weeks later may still be storm damage.

Aircon units, awnings, gates and fences

Clear leaves and debris from aircon outdoor units, and check that brackets have not moved. If a unit was sitting in water or will not cool properly after the storm, ClickBina's aircon diagnostic is RM120 – RM400. Look at awnings and car porch roofs for lifted sheets and loose fixings, and at auto-gates for a motor that stalls or a gate that has come off its track. Loose sheets can become flying debris in the next storm, so secure or remove them.

Drains, floor traps and sewage

Storms wash leaves, silt and sand into drains and floor traps. Clear the grating over outside drains and check that water runs away freely. If sewage rose in a ground-floor toilet or floor trap during the storm, that is a sign the sewer line was full; our guide to sewage backing up in heavy rain explains how to check the inspection chamber and what fixes it.

Recording damage for insurance

Before moving or repairing anything, record the damage: what, where, and when you found it, with notes of the date and time of the storm. Keep damaged items until the insurer has seen them or said you can discard them. ClickBina's guide to fire insurance and water damage perils explains which kinds of storm and water damage a home policy may or may not cover.

What common storm repairs cost

These are ranges from ClickBina's guides (indicative 2026, Klang Valley). Larger damage, such as a roof section torn off or a fallen tree through a structure, is quoted after a look.

RepairIndicative priceNotes
Clear valleys, gutters and downpipesRM150 – RM500Often solves leaks that are really overflows
Replace cracked or slipped tilesRM300 – RM1,000Access and tile matching drive the price
Repair or renew flashingRM500 – RM2,000A common heavy-rain culprit on tiled roofs
Aircon diagnosticRM120 – RM400Unit not cooling or tripping after the storm
Leak detection (ClickBina)RM300 – RM800Separate paid visit

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Fix the things that let water in first. Stains, paint and ceiling boards come last, once the leak has stopped and the area has dried.

How ClickBina can help

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, which suits storm damage that spans the roof, the ceiling and the electrics. WhatsApp us your job details for a quote: what you found on the walk-round, and where. We reply within the hour, and the price we agree is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.

Sources & methodology

  • ClickBina roof leak in heavy rain guide — common storm leak causes and repair prices.
  • ClickBina CCTV lightning and surge guide — the after-storm routine for recorders and routers.
  • ClickBina tree cutting guide — trees near power lines and storm failure points.
  • ClickBina aircon repair and shoplot guides — aircon diagnostic and leak detection prices.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina roof leak, aircon repair and shoplot guides, where they are published as indicative 2026 ranges for the Klang Valley.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What should I check first after a storm?
Safety: fallen wires, trees near power lines and water near electrics. Then walk round outside from the ground before checking inside.
Should I go on the roof to check for damage?
No. Look from the ground or an upstairs window and have a roofer check it. Wet roofs are slippery and may be weakened.
A tree branch is touching the power lines. Who do I call?
TNB. Do not ask a tree cutter or handyman to deal with anything near overhead conductors.
My ceiling has a new stain after the storm. Should I repaint?
Not yet. Let it dry and see if it returns in the next rain. Trace and fix the leak first; ClickBina's leak detection is a separate paid visit at RM300–RM800.
My CCTV seems fine after lightning. Is it?
Check every channel on the recorder, confirm it is still recording, play back the storm period and check the router. Surge-damaged parts can fail weeks later.
How much does clearing gutters after a storm cost?
ClickBina's roof leak guide lists clearing valleys, gutters and downpipes at RM150–RM500 (indicative 2026, Klang Valley).
What should I record for insurance?
What was damaged, where, and when you found it, with the storm's date and time. Keep damaged items until the insurer agrees they can go.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote