A bang in the night and a shower screen in a thousand pieces? Here is why tempered glass breaks by itself, and what to do next.
📍 We serve KL, Selangor & Putrajaya.

Tempered glass can shatter with nobody touching it, and it is usually not your fault. Wikipedia's article on tempered glass lists the usual causes: tiny nickel sulphide inclusions left from manufacture that grow over time, chips or nicks on the edges from handling and installation, glass that binds in its frame as it expands and contracts, and thermal stress. Tempered glass is designed to break into small blunt pieces, which is why it is used in shower screens and doors. A replacement framed sliding shower screen is RM500 – RM900 supplied and installed on ClickBina's shower screen guide (indicative 2026, Klang Valley).
Owners describe the same scene: a loud bang, often at night or when nobody is in the room, and a shower screen, a glass table top or a glass door turned into thousands of small cubes. Sometimes the panel stays in its frame for a few seconds, crazed all over, before it collapses. It is alarming, but the way it breaks is the safety feature working. Wikipedia notes that tempered glass is about four times stronger than annealed glass, and it is made so that it shatters into small pieces rather than long, sharp shards.
Spontaneous breakage is uncommon, but it is a known behaviour of tempered glass, not proof that the glass was fake. Understanding the causes helps you decide what to replace it with and how to stop it happening again.
| Cause | What happens | Typical clue |
|---|---|---|
| Nickel sulphide inclusion | A tiny impurity from manufacture changes structure over time and grows, building stress inside the glass | Can happen years after installation; a figure-eight pattern at the origin |
| Edge damage | A nick or chip from handling, tools or a badly angled fixing grows as the glass expands and contracts | Break radiates from a point on the edge |
| Binding in the frame | No room for the glass to move, so stress builds as temperature changes | Tight frames, glass touching metal, no setting blocks |
| Thermal stress | One part of the glass heats up much more than another | Mostly large sealed or coated units in strong sun |
Wikipedia explains that nickel sulphide inclusions most often come from stainless-steel machinery used in glassmaking, and that small shavings containing nickel change structure over time and grow until the stress exceeds the strength of the glass. This is why a panel can break years after it was fitted.
Many owners report the bang at night or when nobody is in the room. That is a pattern, not a mystery: none of the four causes needs a knock at the moment of failure. Stress builds inside the glass or at its edges and is released when it passes the strength of the glass.
Temperature swings add to that stress. Glass expands and contracts as it warms and cools — a hot afternoon followed by a cooler night, or hot shower water followed by an air-conditioned room. A panel that binds in its frame or has a nicked edge is under most stress during those changes, and a nickel sulphide inclusion can reach its breaking point at any hour, sometimes years after installation. A break at night is the same four causes, released when the stress finally exceeds what the panel can hold.
Before the pieces are swept up, look for the origin. A tempered panel usually has a point where the fracture started, with lines radiating out from it. Wikipedia describes the nickel sulphide break as a distinctive figure-eight pattern, with each loop approximately 30 mm in diameter. If the origin is at an edge or a corner, especially near a hinge, clamp or screw, edge damage or binding is the more likely cause. If it is in the middle of the panel, an inclusion is more likely. Knowing which it was tells the installer what to change when the new panel goes in.
Shower screens are the most common case: the glass is held by hinges and clamps at a few points, is knocked and slammed daily, and goes through hot and cold water every day. Frameless doors and screens put more stress on the fixing points than framed ones. Glass table tops break where they rest on metal legs or brackets without a soft pad. Sliding and folding glass doors break where a frame has settled and pinches the panel, or where a door has been slammed repeatedly against a hard stop. Our shower screen types guide compares framed and frameless screens, and our bi-fold glass door guide covers folding glass doors. Where privacy matters as well, our frosted film versus frosted glass guide explains the options for bathroom and window glass.
Toughened glass and tempered glass are two names for the same heat-treated safety glass, so everything on this page applies to both. Spontaneous breakage is uncommon, but it is a known behaviour of tempered glass, not proof that the glass was fake. This page does not quote a breakage rate, because the risk for a given panel depends on the batch, its size, how it was handled and how it is fixed.
What you can change is the risk for your own panel: heat-soaked tempered glass, which is tested at 290°C to trigger latent nickel sulphide failures before shipment; laminated glass where a break must not fall; and clean edges, soft setting blocks and hardware sized for the weight, as set out below.
Nothing makes tempered glass immune to spontaneous breakage, but several things reduce the risk.
A safety window film applied to a tempered pane can hold the pieces if it breaks, which Wikipedia mentions as a precaution where glass is overhead or in public areas.
Tempered glass cannot be cut, drilled or trimmed after tempering, so the replacement has to be measured and made to size, with every hole and notch in place before it is tempered. That usually means a measurement visit and a wait for the new panel. Ask for the same or better specification, the thickness to suit the opening, and whether heat-soaked or laminated glass is worth it for your location. Replace worn hinges, clamps and seals at the same time. For glass stair railings and balustrades, our glass railing guide explains where laminated glass is used.
These indicative Klang Valley figures (2026) come from ClickBina's shower screen guide. Table tops, doors and railings are priced by size and glass type.
| Item | Indicative price | Source guide |
|---|---|---|
| Framed sliding shower screen (aluminium), supply and install | RM500 – RM900 | Shower screen types guide |
| Framed hinged shower screen, supply and install | RM600 – RM1,000 | Shower screen types guide |
| Frameless hinged shower screen (standard), supply and install | RM1,200 – RM2,000 | Shower screen types guide |
| Frameless hinged shower screen (premium, large), supply and install | RM2,000 – RM3,000 | Shower screen types guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteHeat-soaked or laminated glass, new hardware and any frame repair add to these figures and are quoted for the specific opening.
ClickBina is an experienced KL & Selangor contractor for home refurbishment and trade coordination. Glass replacement is priced case by case: WhatsApp us your job details for a quote, including what broke, where it is, and the size of the opening. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guide named above; they are indicative Klang Valley ranges for 2026, not fixed rates. The cause of a particular break can only be judged by examining the pieces and the fixings.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.