Dry Season & Haze Home Checklist: Water Tank, Filters, Cracks
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
☀️ Seasonal Checklist

Dry Season & Haze Home Checklist
Water Tank, Filters, Dust & Cracks (2026)

Supply disruptions, haze and dust: what to check before and during the dry months, and what to fix while it is dry.

📍 We serve KL, Selangor & Putrajaya.

Terrace house with windows shut on a hazy afternoon, roof water tank and dry lawn

Before the dry months, clean the water tank and check its float valve so it can carry the house through a supply disruption; during haze, keep windows shut and rinse the aircon filters more often; after it, clean the dust out of curtains, windows and soft furnishings; and use the dry spell to seal cracks and finish outdoor jobs before the monsoon. ClickBina's guides put a rooftop tank clean at RM150 – RM400 and a regular aircon service at RM60 – RM120 per unit (indicative 2026, Klang Valley).

Why the dry months and haze need their own checklist

Most home checklists in Malaysia are built around the monsoon: gutters, roofs and leaks. The dry months bring a different set of problems. Water supply is more likely to be interrupted, the garden suffers, dust builds up, and in some years the haze arrives and every window in the house stays shut for weeks.

ClickBina's garden landscaping guide names two dry seasons for the Klang Valley: January–February and June–August. Haze, when it comes, usually overlaps with the second. This page is the checklist for those months. For the wet-season side, use the seasonal home maintenance checklist.

Water: your tank is the buffer

When the mains supply is interrupted, a landed house keeps running on whatever is in its roof tank. The plumbing rules require that tank for exactly this reason. ClickBina's roof water tank guide sets out the legal minimum and how long a tank really lasts a family:

FigureValueWhat it means
Legal minimum, urban house with its own tank1,300 litresOne day's demand under the plumbing rules
Legal minimum, rural or low-cost house800 litresOne day's demand under the plumbing rules
Planning figure per person150 litres per person per dayA family of four uses about 600 litres a day
1,000 litre tankAbout 1.5 days of bufferFor that family of four
2,000 litre tankAbout 3 days of bufferThe sensible size for a family terrace if the roof can carry it

If your house regularly runs dry during disruptions, the tank is probably too small or not filling fully. During a disruption, cut use that can wait: postpone the washing machine, take shorter showers, and do not water the garden from the tank. Store a little drinking water from the kitchen tap, which is fed straight from the main, in clean covered containers, and empty them when supply returns so they do not breed mosquitoes.

Before the dry months: clean the tank and check the float valve

A tank full of sediment holds less clean water, and the first water after a disruption often comes back cloudy as the mains are recharged. Cleaning the tank before the dry season means the water you are relying on is clean. The roof water tank guide says most homes clean the tank about once a year.

Check the float valve at the same time. It is the part that stops the inlet when the tank is full; a worn one either overflows all the time, wasting the water you are trying to save, or sticks and stops the tank filling. The same guide puts float valve replacement at every 3–5 years. Look also for cracks, brittle or faded plastic and a rusted stand, because a tank that fails during a disruption leaves you with nothing.

Haze: keep it out of the house

When the haze arrives, the aim is to keep outdoor air out and clean the air inside. Shut windows and doors, close the gaps you can (the bottom of the main door, unused ventilation louvres, the gap round a portable aircon hose) and keep the kitchen hood and bathroom fans off unless needed, since every exhaust fan pulls outside air in through the gaps.

The trade-off is stale air. ClickBina's fresh-air ventilation guide explains that a shut condo gets stuffy and that opening windows should wait for times without haze or peak heat. Air the house briefly when the air outside clears, then shut it again. Keep bedroom doors closed so the room you sleep in stays the cleanest.

Filters during and after the haze

Aircon filters catch the dust and some of the fine particles, so they clog much faster during haze. ClickBina's filter cleaning guide treats a home beside a main road or construction as a monthly-filter house; during a haze episode, treat every home that way and rinse the filters more often. A clogged filter cuts cooling and pushes dust onto the coil.

After a long haze, book the regular service you were going to do anyway. If the unit smells musty or the coil is visibly dirty, a chemical wash cleans what got past the filter. ClickBina's aircon servicing cost guide recommends a regular service every 3–6 months. If you use a portable air purifier, change or clean its filter on the maker's schedule; a full filter does nothing.

The dust clean-up after the haze

Haze leaves a fine grey film on everything. Wipe hard surfaces with a damp cloth rather than dusting, which just puts it back in the air. Then do the soft things that hold dust: curtains, sofa, mattress and rugs. ClickBina's curtain cleaning guide notes that curtains facing opened windows take in haze-season dust; steam cleaning them in place is priced per panel.

Windows and grilles collect the most. Wash the glass and the frames, clear the tracks of sliding windows and doors, and wipe every grille bar. ClickBina's window cleaning guide suggests the period after the haze as one of the useful times to book it. For a whole house, a single deep clean after the haze is usually easier than room by room.

Cracks: the dry season is the time to find and seal them

A dry spell shows up cracks that are hidden when walls are damp, and it is the right time to seal them. ClickBina's home checklist puts it simply: a hairline crack found in the dry season is a cheap seal, while the same crack found in December is a soaked ceiling. Walk round the outside of the house and look at the external walls, the joint where walls meet columns, the parapet, and the porch and apron slab.

Fine hairline cracks in plaster are usually shrinkage and only need filling and repainting. Cracks that are wide, diagonal, growing, or in a beam, column or slab need a closer look. ClickBina's guide to cracks between walls and columns explains which is which. Mark the ends of any crack with a pencil and the date, and check again in a few weeks.

Use the dry weather for outdoor jobs

Exterior work goes better in dry weather. Paint, sealants and waterproofing need dry surfaces and time to cure; ClickBina's exterior repainting guide describes two topcoats of weatherproof paint applied in dry weather. Rain stopping the job halfway is less likely in the dry months, so this is the time to book an exterior repaint, a roof repair or a waterproofing job you have been putting off.

It is also the time to fix what the monsoon will test: re-seal loose roof flashing, clear and check gutters before the year-end rains, and repair the porch or perimeter drain. Doing these in August is far easier than in a November downpour.

The garden in a dry spell

Grass and plants suffer first. ClickBina's lawn problems guide lists too little water in dry spells as one of the main causes of brown grass, especially for new turf. Water deeply and less often rather than a little every day, so the roots go down.

Water early in the morning, when less is lost to the sun, as the garden irrigation guide advises, and adjust any timer between the dry season and the monsoon. Mulch beds to hold moisture, move pots into shade, and during a supply disruption leave the garden until the mains are back, rather than draining the house tank.

What the related jobs cost

Most of this checklist costs nothing: shutting windows, rinsing filters, watering at the right time. The jobs you may want to book cost the following, quoted from ClickBina's guides (indicative 2026, Klang Valley).

JobIndicative priceSource guide
Rooftop water tank clean (drain, scrub, refill)RM150 – RM400Roof water tank guide
Float valve replacement, including labourRM80 – RM200Roof water tank guide
Aircon regular service, per unitRM60 – RM120Aircon servicing cost guide
Aircon chemical wash, per unitRM120 – RM250Aircon servicing cost guide
Curtain steam clean, on site, per panelRM20 – RM45Curtain cleaning guide

Want this priced for your home?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

How ClickBina can help

If you want the tank cleaned before the dry months or the house cleaned after the haze, WhatsApp us your job details for a quote: area, property type and the jobs you need. ClickBina cleans and replaces water tanks, does deep cleaning including sofas and mattresses, and does painting and roofing; as an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination it can group the outdoor jobs into the dry weather. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.

Sources & methodology

  • ClickBina roof water tank guide — legal minimum storage, daily use, buffer days, float valve and tank cleaning.
  • ClickBina garden landscaping, lawn problems and garden irrigation guides — the dry seasons, dry-spell lawn damage and watering times.
  • ClickBina fresh-air ventilation, filter cleaning, aircon servicing, curtain cleaning and window cleaning guides — haze, filters and the dust clean-up.
  • ClickBina home maintenance checklist, crack and exterior repainting guides — sealing cracks and outdoor work in dry weather.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.

Ready to get it sorted?

WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.

💬 WhatsApp for a quote
Reply on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

When is the dry season in the Klang Valley?
ClickBina's garden guide names two dry seasons: January–February and June–August. Haze, when it happens, usually overlaps with the second.
How long will my water tank last during a supply disruption?
On ClickBina's planning figure of 150 litres per person per day, a family of four uses about 600 litres a day, so a 1,000 litre tank gives about 1.5 days and a 2,000 litre tank about 3 days.
Should I clean my water tank before the dry season?
Yes. A clean tank holds more clean water for a disruption. Check the float valve at the same time so the tank fills fully and does not overflow.
Should I run the aircon during haze?
Running it with windows shut keeps the room air cleaner than opening windows, but rinse the filters more often, because they clog quickly in haze.
How do I clean the house after the haze?
Wipe hard surfaces with a damp cloth, wash windows, tracks and grilles, then clean curtains, sofa, mattress and rugs. A single deep clean is often easiest.
Why is the dry season a good time to fix cracks?
Cracks are easier to see when walls are dry, and fillers, sealants and paint cure better without rain. Sealing them before the monsoon stops water getting in.
How should I water the garden in a dry spell?
Water deeply and less often, early in the morning, and mulch the beds. During a supply disruption, leave the garden until the mains are back.

Free Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote