Tired of old wallpaper? When you can paint straight over it, when you must strip it, and what each costs.
📍 We serve KL, Selangor & Putrajaya.

Strip it in most cases. Painting over wallpaper only works when the paper is non-vinyl, firmly stuck everywhere with tight seams, and sealed first with a suitable primer; even then the seams and texture may show, and the paper becomes much harder to remove later. In Malaysia's humidity, loose seams, vinyl paper and any hint of damp are reasons to remove it. On ClickBina's guides removing old wallpaper is RM0.50 – RM1.50 per sq ft for strippable paper and RM1.00 – RM3.00 per sq ft for vinyl on a paper backing (indicative 2026, Klang Valley).
Wallpaper went up in many Klang Valley homes as a feature wall or a full room. Years later the pattern is dated, a seam has lifted, or a new owner simply wants plain paint. Stripping looks messy and slow, so the obvious question is whether paint can just go over the top.
Sometimes it can. Often it should not. The answer depends on the type of paper, how well it is stuck, the condition of the wall behind it and how long you want the result to last.
| Point | Paint over the wallpaper | Strip, prepare, then paint |
|---|---|---|
| Speed | Faster at first | Slower: removal, drying, filling, priming |
| Mess | Little | Water, paste and scraps of paper |
| Finish | Seams, edges and texture may show through | Smooth, even painted wall |
| Risk | Bubbles and lifting seams when the paste softens | Low, once the wall is dry and prepared |
| Later removal | Much harder: paint seals the paper | Nothing left to remove |
| Hidden problems | Stay hidden | Damp, mould and cracks are found and fixed |
If all of that is true, the paper is sealed with a primer suitable for painting over wallpaper, which stops the water in the paint from soaking in and softening the paste, then painted in two coats.
Vinyl and PVC-coated papers are the usual problem. They are made to be wiped and to shed water, so paint sits on a plastic surface and peels. Loose seams are the second: the moisture in fresh paint softens the old paste, and the edges curl or bubble while the paint is still wet.
Humidity makes both worse. Wallpaper in a humid room is already prone to peeling, as ClickBina's wallpaper versus paint guide notes, and adding a layer of paint on top traps any moisture in the wall behind it.
Wallpaper hides what is happening on the wall. Before choosing either route, look for brown stains, dark spots or bubbling, especially near bathrooms, windows and outside walls, and peel back a small corner to see the paste and the plaster. Black spots behind the paper mean mould and moisture, and the paper has to come off so the cause can be fixed. ClickBina's anti-mould paint guide explains why the source of damp is fixed before any repaint.
Vinyl papers often peel off as a top layer, leaving their paper backing on the wall, which then has to be soaked and scraped as well. ClickBina's wallpaper cost guide prices removal by paper type for that reason.
Removing wallpaper often reveals a rougher wall than expected: torn plaster paper, old filler, or a wall that was never skimmed because the paper hid it. Small damage is filled and sanded. A wall that is rough all over may need a skim coat before painting for a smooth finish. Older houses sometimes have hollow plaster under the paper; tap the wall before painting.
Plan the room in the right order. Take off switch plates and socket covers before stripping, with the power off, so the paper can be removed cleanly behind them. Strip and repair every wall first, then prime and paint them together, so the colour and sheen match across the room. If you want a new feature wall, the stripped and skimmed wall is also the right base for fresh wallpaper.
These figures are already published on ClickBina's wallpaper guides (indicative 2026, Klang Valley).
| Item | Indicative price | Source guide |
|---|---|---|
| Removing strippable wallpaper | RM0.50 – RM1.50 per sq ft | Wallpaper cost guide |
| Removing vinyl on a paper backing | RM1.00 – RM3.00 per sq ft | Wallpaper cost guide |
| Skim coat, if the wall is rough | RM1.50 – RM4.00 per sq ft | Wallpaper cost guide |
| Professional removal and wall preparation (budget) | RM3 – RM8 per sq ft | Wallpaper versus paint guide |
| Professional painting, supplied and applied | RM1.50 – RM4 per sq ft | Wallpaper versus paint guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe spread comes from the paper type, how many layers there are, the state of the wall underneath and whether a skim coat is needed. A feature wall is a small job; a whole room of vinyl paper is a bigger one.
Stripping a single feature wall of strippable paper is a reasonable weekend job with a scorer, a sprayer and a scraper. Vinyl papers, several layers, high walls and stairwells, and walls that turn out to be damaged are easier with a contractor, who can strip, skim and paint in one sequence. Keep water away from sockets and switches, and switch off the circuit before soaking around them.
We install and remove wallpaper and paint walls as part of renovation work, so we can strip old paper, repair or skim the wall and repaint it in one job, or install new wallpaper if you prefer. WhatsApp us your job details for a quote: your area, the property type, which rooms, roughly how many sq ft of wall and the type of paper if you know it.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.