Before Raya or CNY: Home Repair & Refresh Checklist
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🎉 Festive Home Prep

Before Raya or CNY
Home Repair & Refresh Checklist (2026)

Guests are coming. Here is what to fix, what to book and in which order, so the house is ready on the day.

📍 We serve KL, Selangor & Putrajaya.

Freshly washed porch at dusk with shoes lined up by the open door, ready for festive guests

Before Hari Raya or Chinese New Year, fix first, then service, then clean: repair leaks, lights, doors and anything broken; service the aircon; touch up marked walls and reseal bathrooms; clear the gutters; and leave the deep clean, sofa and curtains for last so they stay fresh for guests. Book the trades early, because repairs and cleaning slots tend to fill in the run-up to a festival. ClickBina's published Klang Valley ranges put a regular aircon service at RM60 – RM120 per unit and a deep clean of a 3-bedroom condo at RM400 – RM650 (indicative 2026).

Why the festive run-up needs a plan

Hari Raya and Chinese New Year put more pressure on a house than any other week of the year. There are guests in every room, the kitchen runs for days, the aircon works harder, and everyone notices the stained ceiling or the dripping tap that the family has stopped seeing. At the same time, contractors, cleaners and aircon teams are busiest in the same few weeks, so the jobs left late are the ones that do not get done.

The fix is simple: make a list early, split it into repairs, servicing and cleaning, and book them in that order. Repairs make dust and mess, so they go first; cleaning goes last so the house is fresh on the day.

Work backwards from the festival

WhenWhat to doWhy then
A month or two beforeWalk the house with a list; book repairs, painting touch-ups and any bigger jobTrades are easier to book and there is time to fix what the repair uncovers
A few weeks beforeBook aircon servicing, gutter cleaning and any pest treatmentServicing slots fill up; gutters matter if the monsoon is still on
The fortnight beforeBook the deep clean, sofa and curtain cleaningCleaning after the repairs keeps it fresh
The last few daysTest lights, fans, aircon, gate and locks; stock spare bulbs and batteriesSmall failures are easy to fix before guests arrive
Before balik kampungSecure the house if you are travellingAn empty house needs a short checklist of its own

If the list includes anything bigger, such as a kitchen or bathroom refresh, start it well before the festival or leave it until after. A half-finished bathroom at open house is worse than an old one.

Repairs first: what guests will notice

  • Water stains on ceilings, and the leak behind them. Fix the cause before painting over it.
  • Dripping taps, running toilets, slow drains and a smelly floor trap in the guest bathroom.
  • Dead lights, flickering downlights, loose sockets and fans that wobble.
  • Doors that stick, broken handles and hinges, and the main gate or autogate that is slow to open.
  • Mouldy silicone and dirty grout in bathrooms and the kitchen.
  • Cracked or loose floor tiles in the hall and on the porch, where guests leave their shoes.

ClickBina's home maintenance checklist is a useful companion: the festive list is the same routine, brought forward and done in one go.

Aircon: service before the crowd

An aircon that cools a family of four struggles with a living room full of guests and the kitchen door open. A dirty filter and coil make that worse and can start the indoor unit dripping. A regular service cleans the filter, wipes the coil, checks the drainage and tests for water leaks; a chemical wash strips the unit down for a deeper clean. ClickBina's aircon servicing cost guide lists both.

Book it a few weeks ahead, run each unit afterwards, and check the indoor units for drips before the first visitors arrive.

Walls: touch up, do not repaint the whole house

A full repaint is rarely needed for a festival. What guests see are the marked walls in the hall, the stairs and the dining area, the scuffed skirting and the old nail holes from last year's decorations. A targeted touch-up of those walls, with holes filled and stains sealed first, does most of the work. ClickBina's guide to patching walls before repainting explains why a patch shows through new paint when the preparation is skipped.

Paint a week or more before the festival where you can, so the smell has gone and the walls are fully dry before furniture is pushed back against them.

Bathrooms and the kitchen

The guest bathroom works harder over a festival than at any other time. Strip and redo mouldy silicone around the basin, the shower and the bathtub; ClickBina's silicone resealing guide explains how it is done. Clean or regrout stained grout, fix any leak under the basin, and make sure the floor trap drains and does not smell.

For the kitchen, clean the hood filters and the wall behind the stove before the cooking starts, fix any leak under the sink, and check that there are enough working sockets, so nobody runs a rice cooker, an oven and a kettle off one extension lead.

Outside: gutters, porch and gate

The porch and the gate are the first things guests see. Clear the gutters and downpipes, especially if the festival falls in a rainy month; ClickBina's gutter cleaning guide explains why an overflowing gutter becomes a wall stain later. Wash the porch, clear the drains, fix loose porch tiles, and oil the gate and grilles.

If you plan to hang festive lights outside, plug them into a proper outdoor socket, not an extension lead trailing through a window, and keep plugs off the wet porch floor.

Cleaning last: deep clean, sofa and curtains

Once the repairs and the painting are done, the deep clean pulls everything together: kitchen, bathrooms, windows, fans, cabinets and floors. Soft furnishings are the other half: sofas that guests sit on for days, and curtains that have not been washed since last year. ClickBina's sofa cleaning guide and curtain cleaning guide explain the options, including steam cleaning curtains in place so they do not have to come down.

If the house will be empty over the holiday

Many families balik kampung or travel over the festival, and the house sits empty for days. Before leaving, switch off the water heater and non-essential circuits, turn off the main water valve if you are away for long, clear the fridge, check the gutters and the roof drains, and ask a neighbour to keep an eye on the gate. A slow leak found after a week away is far more expensive than one found the same evening.

What the usual festive jobs cost

These are ClickBina's published ranges (indicative 2026, Klang Valley). Your total depends on the size of the house and how long the list is.

JobIndicative priceSource guide
Aircon regular service, per unitRM60 – RM120Aircon servicing cost guide
Aircon chemical wash, per unitRM120 – RM250Aircon servicing cost guide
Deep clean, 3-bedroom condoRM400 – RM650Move-in / move-out cleaning guide
Sofa cleaning, typical full setRM150 – RM400Sofa cleaning guide
Curtain steam cleaning, per panelRM20 – RM45Curtain cleaning guide
Gutter cleaning, terrace houseRM200 – RM600Gutter cleaning guide
Repaint touch-up, condo (scuffs, patches, one stained wall)RM400 – RM900Patching walls guide
Silicone resealing, basin or sink jointRM60 – RM150Silicone resealing guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

How ClickBina can help

WhatsApp us your job details for a quote: your list, the property type, your area and the date you need it done by. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination, so repairs, painting touch-ups and bathroom resealing can be run as one job ahead of the festival, with servicing and cleaning quoted on the same list. We reply within the hour, and the price we agree is a flat price with no hidden charges. A repair inspection is RM180, deducted from the repair bill if you go ahead.

Sources & methodology

  • ClickBina aircon servicing cost guide — regular service and chemical wash prices.
  • ClickBina move-in / move-out cleaning, sofa cleaning and curtain cleaning guides — cleaning prices.
  • ClickBina gutter cleaning, patching walls and silicone resealing guides — prices for those jobs.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026. The timing advice is general planning guidance, not a promise of availability.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

How early should I book repairs before Raya or CNY?
A month or two ahead for repairs and painting, a few weeks ahead for aircon servicing, and the fortnight before for cleaning. Late bookings are the ones that get squeezed out.
What should I do first: clean or repair?
Repair first. Repairs and painting make dust, so cleaning goes last.
Do I need to repaint the whole house for the festival?
Usually not. Touch up the marked walls guests see, after filling holes and sealing stains.
How much does aircon servicing cost before the festive season?
ClickBina's servicing guide lists RM60–RM120 per unit for a regular service and RM120–RM250 for a chemical wash (indicative 2026, Klang Valley).
Should I paint over a ceiling stain before guests come?
Only after the leak behind it is fixed, or the stain comes back.
What should I check before leaving the house empty over the holiday?
Switch off the water heater and non-essential circuits, turn off the main water valve for long trips, clear the fridge and gutters, and ask a neighbour to watch the gate.
Can one contractor handle repairs, painting and the other jobs?
Yes. ClickBina coordinates trades, so the list can be quoted and scheduled as one job.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote