Thumps in the roof at night and a stain that keeps spreading? What a civet does to a roof and ceiling, and the right order to fix it.
📍 We serve KL, Selangor & Putrajaya.

Heavy thumps and running in the ceiling late at night, a strong musky smell and yellow-brown stains spreading on the ceiling boards usually mean a civet (musang), not rats. The order of work matters: the animal has to leave, or be removed by PERHILITAN or a pest-control operator, before anyone seals the way in; then the entry points at the eaves, roof tiles, fascia and soffit are closed and the soaked ceiling boards replaced. On ClickBina's guides, replacing cracked roof tiles is RM600 – RM2,500 and fascia and soffit repair RM800 – RM3,500 (indicative 2026, Klang Valley).
Civets, called musang in Malay, are cat-sized, tree-climbing animals that are active at night. In towns across the Klang Valley they live alongside people, feed on fruit trees in gardens, and move along walls, branches and overhead cables. A quiet, dark roof space above a bedroom is an attractive place to rest during the day.
Both animals make noise in the ceiling at night, and both leave droppings, so people often call for rat treatment first. The pattern of the noise and the damage usually tells you which one you have.
| Sign | Civet (musang) | Rats |
|---|---|---|
| Sound | Heavy, slow thumps; sounds like a cat walking | Light, fast scurrying and scratching |
| Timing | Comes and goes at night; often quiet by day | Night and day once the colony is large |
| Droppings | Larger droppings, often with seeds, piled in one spot | Small droppings scattered along runs |
| Ceiling marks | One growing urine stain, sometimes a sagging board | Gnawed cables, pipe lagging and nesting material |
| Entry | Larger gaps: a missing tile, an open soffit, a broken vent | Small gaps and holes; climbs inside wall cavities |
If the signs point to rats, ClickBina's rat and rodent control guide explains proofing, baiting and trapping. Some roofs have both problems, which is one more reason to find and close every gap.
A roof space is dry, dark and undisturbed, and it is warm in the evening. Gardens with fruit trees, such as papaya, banana or rambutan, give the animal a reason to visit. Terrace rows give it a long, connected roof line to travel along, so an animal that gets into one house can often reach the roofs of the neighbours. Older houses with timber fascia boards, cracked tiles or unscreened openings offer the easiest way in.
A female may also raise young in a quiet roof space. That changes the plan: sealing the roof while young are inside traps them, and the mother will try to tear her way back in.
Civets need a larger opening than a rat, so the entry point is usually visible from the ground or from the roof space with a torch. The common ones:
Civets are wild animals. In Peninsular Malaysia, wildlife disturbance is handled by PERHILITAN, the Department of Wildlife and National Parks. ClickBina's snake and monitor lizard guide notes that PERHILITAN says it acts on complaints within three working days and charges nothing for its help. A pest-control operator is the other route. Ask either one how they will remove the animal and whether young may be present.
ClickBina's part is the building: opening the ceiling or roof for access, closing the entry points and repairing the damage once the animal is out.
Most failed jobs get the order wrong. Sealing a roof with a civet inside either traps it, which ends with a dead animal and a smell, or leads it to rip open a soft spot such as a ceiling board or a soffit panel. The sequence that works:
Urine soaks into gypsum ceiling boards and insulation in one spot over weeks. The board stains, softens and sags, and the smell stays in the board even after the animal is gone. Painting over the stain does not work: the stain and the smell come back through the paint. The soaked section has to be cut out and replaced, and the area cleaned before the new board goes in.
Treat the droppings and soaked material as contaminated. Wear gloves and a mask, wet the droppings before removing them, and do not sweep them dry. The rat droppings clean-up guide explains the same safe method, which applies here too.
These ranges are already published on ClickBina's roof, ceiling and clean-up guides (indicative 2026, Klang Valley). The animal removal itself is a separate matter for PERHILITAN or a pest-control operator.
| Work | Indicative price | Source guide |
|---|---|---|
| Replace cracked or broken roof tiles | RM600 – RM2,500 | Roof repair cost guide |
| Fascia and soffit repair (rotted or cracked boards) | RM800 – RM3,500 | Fascia and soffit guide |
| Ceiling patch-and-repaint section | RM400 – RM1,200 | Ceiling repair guide |
| Replace a sagging ceiling area | RM500 – RM1,500 | Ceiling repair guide |
| Home disinfection, landed or larger | RM300 – RM600 per visit | Rat droppings clean-up guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe spread comes from how many entry points there are, how high and how easy the roof is to reach, and how much of the ceiling has soaked through. The roof repair cost guide explains the other roof items if the inspection finds more.
We do the roof and ceiling side of the job: finding and closing the entry points at the eaves, replacing broken tiles and rotted fascia or soffit boards, screening openings, and cutting out and replacing soaked ceiling boards before repainting. Once PERHILITAN or a pest-control operator has the animal out, WhatsApp us your job details for a quote: your area, the property type and what you have noticed.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.