Heaps of droppings and squeaking at dusk? How to confirm a bat roost, let the bats out safely and close the roof for good.
📍 We serve KL, Selangor & Putrajaya.

Small dark droppings piling up in one place, squeaking from the roof around dusk and dark rub marks at a gap under the roof tiles usually mean bats are roosting in the roof space. Do not seal them in or poison them: find the exits at dusk, let the bats leave, then close every gap and clean up the droppings safely. On ClickBina's guides, bird netting supplied and installed is RM10 – RM30 per sq ft and replacing cracked roof tiles RM600 – RM2,500 (indicative 2026, Klang Valley).
Bats that live in houses in Malaysia are usually small, insect-eating species. They rest in the roof space by day and fly out to feed at dusk. Because they are small and quiet, many owners only notice them once the droppings build up.
The simplest check is to stand outside at dusk and watch the roof line. Bats leaving one after another from the same gap confirm both the problem and the main exit.
People often mistake a bat roost for rats. The droppings are the easiest way to tell.
| Check | Bats | Rats |
|---|---|---|
| Where | Heaped below the roost or under the exit gap | Scattered along walls, beams and runs |
| Texture | Dry and crumbly; breaks into a powder with fragments of insects | Hard and firm; does not crumble |
| Noise | Squeaking and fluttering, mostly at dusk and dawn | Scurrying and gnawing through the night |
| Damage | Stains and smell; little or no gnawing | Gnawed cables, pipes and packaging |
| Exit | One or a few gaps high on the roof line | Many small holes at any level |
If the signs point to rats, follow ClickBina's rat and rodent control guide instead; the proofing work is similar, but the treatment is not.
A roof space gives bats what they need by day: darkness, shelter from rain and a steady, warm temperature. They squeeze in through surprisingly small gaps: under the first row of roof tiles at the eaves, behind a loose fascia board, through an unscreened gable vent or the gap at a ridge. Houses near trees, open land or water, where insects are plentiful at night, are the most likely to have them.
Droppings and urine soil the ceiling boards and insulation below a roost. Treat them as contaminated. Do not sweep them up dry, because that puts dust into the air. Wear gloves and a mask, wet the droppings first, and bag them. ClickBina's rat droppings clean-up guide describes the same safe method for a ceiling void.
Never pick up a bat with bare hands, alive or dead. A frightened bat can bite. If one is inside a room, close the internal doors, open a window, switch off the lights and let it find its own way out at dusk.
Insect-eating bats are useful animals: they feed on insects at night. Killing them with poison or sealing the exits while they are inside leaves dead bats in the roof space, which brings a lasting smell and more cleaning, and trapped bats may find their way down into the house instead.
Bats are wild animals. In Peninsular Malaysia, wildlife disturbance is handled by PERHILITAN, the Department of Wildlife and National Parks; ClickBina's snake and monitor lizard guide notes that PERHILITAN says it acts on complaints within three working days and charges nothing for its help. Ask PERHILITAN or a pest-control operator for advice before anything is done to the bats themselves, especially for a large colony.
The idea is simple: the bats leave at dusk as usual, and cannot get back in. In practice it is done in stages, after advice from PERHILITAN or a pest-control operator:
If you see young bats, or hear a lot of squeaking from the roof during the day, wait and ask for advice before closing anything, because young bats cannot fly out on their own.
The permanent fix is a tight roof edge. That can mean re-bedding the first row of roof tiles and their closures at the eaves, replacing cracked or slipped tiles, renewing a rotted fascia or a sagging soffit, and screening gable and roof vents. The fascia and soffit guide explains why soffit vents must be screened rather than blocked, because the roof space still needs to breathe.
Inside, ceiling boards stained by droppings and urine are cut out and replaced, and soiled insulation is removed and renewed before the ceiling is repainted.
These ranges are already published on ClickBina's pest-proofing, roof, ceiling and clean-up guides (indicative 2026, Klang Valley). Advice on or removal of the bats themselves is a separate matter for PERHILITAN or a pest-control operator.
| Work | Indicative price | Source guide |
|---|---|---|
| Bird netting, supplied and installed (to screen larger openings) | RM10 – RM30 per sq ft | Bird and pigeon control guide |
| Replace cracked or broken roof tiles | RM600 – RM2,500 | Roof repair cost guide |
| Fascia and soffit repair (rotted or cracked boards) | RM800 – RM3,500 | Fascia and soffit guide |
| Ceiling patch-and-repaint section | RM400 – RM1,200 | Ceiling repair guide |
| Home disinfection, landed or larger | RM300 – RM600 per visit | Rat droppings clean-up guide |
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteThe spread depends on how many gaps there are, how high the roof is and how easy it is to reach, and how much of the ceiling and insulation has been soiled. A civet in the roof is handled in a similar order; ClickBina's civet in the ceiling guide covers it.
We do the building side of the job: closing the gaps at the eaves and roof line, re-bedding and replacing roof tiles, renewing fascia and soffit boards, screening vents, and replacing stained ceiling boards and insulation before repainting. Once the bats are out, WhatsApp us your job details for a quote: your area, the property type and what you have noticed.
ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We'll reply as soon as we can, and the price we agree is a flat price with no hidden charges.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates.
WhatsApp us your job details for a quote — we'll reply as soon as we can. A renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteTell us what you need — we'll reply as soon as we can.