What pest control costs in the Klang Valley, pest by pest, and how to compare quotes.
📍 We serve KL, Selangor & Putrajaya.

Pest control price in Malaysia: in the Klang Valley a one-off general pest treatment is about RM120 – RM350 a visit and an annual home package about RM400 – RM900 a year; the specialist jobs cost more — termite soil treatment RM1,500 – RM4,000, a baiting system RM2,500 – RM6,000, and bed bugs RM250 – RM800 per room (ClickBina indicative 2026). The pest, the size of the property, how bad the infestation is and how many visits it takes move the price. Treatment is carried out by a pest control company; the building repairs that stop pests coming back are separate work. An inspection for those repairs is RM180, deducted from the repair bill if you go ahead.
These are the indicative 2026 Klang Valley ranges published across ClickBina's pest guides, gathered in one place. Each links back to a guide with the detail behind the number.
| Treatment | Indicative price | Source |
|---|---|---|
| General pest treatment, one-off | RM120 – RM350 per visit | Pest control services guide |
| Annual home package (quarterly visits) | RM400 – RM900 per year | Pest control services guide |
| Cockroach gel-baiting, single home treatment | RM150 – RM400 | Cockroach control guide |
| Heavy or long-standing cockroach infestation | RM400 – RM800 per visit | Cockroach control guide |
| Ant colony baiting, home | RM120 – RM350 | Ant control guide |
| Rat proofing and baiting, home | RM200 – RM500 | Rat & rodent control guide |
| Rodent proofing only | RM150 – RM600 | Rat & rodent control guide |
| Ceiling or roof-void rat job | RM300 – RM800 | Rat & rodent control guide |
| Termite corrective soil treatment, existing home | RM1,500 – RM4,000 | Termite control guide |
| Termite baiting system with first-year monitoring | RM2,500 – RM6,000 | Termite control guide |
| Bed bugs, chemical treatment per room | RM250 – RM800 | Bed bug treatment guide |
| Bed bugs, chemical treatment whole home | RM800 – RM2,500 | Bed bug treatment guide |
| Mosquito fogging, landed home or compound | RM150 – RM350 | Mosquito fogging guide |
| Small, accessible wasp or hornet nest | RM150 – RM350 | Bee & wasp nest removal guide |
| Pigeon proofing, aircon ledge or small area | RM300 – RM800 | Bird & pigeon control guide |
WhatsApp us your job details for a quote on the repairs — we reply within the hour.
💬 WhatsApp for a quoteTreat the table as a starting point for comparing quotes, not a quote in itself. The pest control services guide explains what a general treatment includes and when a contract makes more sense than a one-off visit.
Most searches for pest control cost come down to one question: what will my home actually pay? The answer depends on the pest more than the town — the ranges on this page are indicative Klang Valley figures for KL, Klang and the rest of Selangor. These typical home situations use the same figures as the table above:
| Home situation | Usual treatment | Indicative price |
|---|---|---|
| Condo or apartment with cockroaches or ants | One-off general treatment | RM120 – RM350 a visit |
| Landed house with pests that keep returning | Annual home package, quarterly visits | RM400 – RM900 per year |
| House with termites in a door frame or skirting | Corrective soil treatment or a baiting system | RM1,500 – RM4,000 soil; RM2,500 – RM6,000 baiting, then RM600 – RM1,500 a year |
| Rental unit with bed bugs | Chemical treatment, usually two visits | RM250 – RM800 per room; RM800 – RM2,500 whole home |
| Rats in the ceiling | Proofing and baiting | RM300 – RM800 for a ceiling or roof-void job |
The cheapest pest control price is not always the cheapest job: check whether the follow-up visits are included before you compare quotes, as set out in comparing quotes below.
A one-off visit suits a single problem that has a clear cause: ants trailing into the kitchen, a wasp nest under the eaves, cockroaches after a neighbour's renovation. A package or contract suits a problem that keeps returning, a landed house backing onto a drain or a field, and any business that has to show a pest record.
| Contract type | Indicative price | Source |
|---|---|---|
| Home package, quarterly visits | RM400 – RM900 per year | Pest control services guide |
| Small outlet, monthly or quarterly plan | RM80 – RM250 per visit | Commercial pest control contract guide |
| Restaurant with a full kitchen, monthly | RM150 – RM400 per visit | Commercial pest control contract guide |
| Annual contract, small premises | RM1,000 – RM3,000 per year | Commercial pest control contract guide |
| Termite baiting renewal and monitoring | RM600 – RM1,500 per year | Termite control guide |
The commercial pest control contract guide covers what a shop, café or JMB contract should include and the records an inspector expects to see.
Termite work is priced in the thousands because it protects the structure. The termite control guide lists corrective soil treatment of an existing home at RM1,500 – RM4,000 and a baiting system with first-year monitoring at RM2,500 – RM6,000, then RM600 – RM1,500 a year to keep the stations active. Termite damage to door frames, skirting and cabinets is a separate repair once the colony is dealt with.
Bed bugs are priced by the room because every room with a bed or sofa has to be treated. The bed bug treatment guide lists a chemical treatment at RM250 – RM800 per room, usually two visits to catch the eggs, RM800 – RM2,500 for a whole home, and heat treatment at RM800 – RM2,500 per room. Landlords facing an infested mattress after a tenant also have to decide whether to keep or discard it.
Rats keep coming back until the way in is sealed, so a proper rodent job is proofing first and baiting second. ClickBina's rat guide lists proofing and baiting at RM200 – RM500, proofing alone at RM150 – RM600 and a ceiling or roof-void job at RM300 – RM800. The rats chewing ceiling wiring guide explains the damage they leave behind.
Outdoor pests are priced per session or per job. Fogging a landed home or compound is RM150 – RM350, rising to RM400 – RM800 for a larger compound or small strata round, with larviciding of breeding water added at RM80 – RM200. A small, accessible wasp or hornet nest is RM150 – RM350 and a large, high or hidden one RM350 – RM800, while a live honey-bee colony is usually relocated by a beekeeper for around RM250 – RM600. Pigeon spikes run RM25 – RM60 per metre and netting RM10 – RM30 per sq ft.
A cheap quote that leaves out the follow-up visit is often the most expensive one by the time the problem is gone.
Treatment kills the pests that are there; the building decides whether more arrive. Gaps around pipes under the sink, open weep holes, broken ceiling boards, gaps at the roof eaves, missing door bottom seals and unsealed floor traps are the usual ways in. The pest-proofing guide walks through sealing them, ideally while a renovation already has the walls and cabinets open.
This is ClickBina's part of a pest job. Pest treatment itself is carried out by a pest control company; ClickBina handles the building work around it — sealing gaps and pipe penetrations, replacing damaged ceiling boards, closing gaps at the eaves and fitting door seals — as part of whole-house refurbishment and trade coordination.
A few ants or the odd cockroach can often be handled with baits from a hardware shop and better housekeeping: food sealed, crumbs cleared, sinks dry at night. Call a pest control company when the problem is spreading, when you see termite mud tubes or winged termites indoors, when bed bugs are confirmed, when rats are in the ceiling, or when a nest is high or large. Do not spray a wasp nest yourself.
WhatsApp us your job details for a quote on the building side: the pest, where you think it is getting in, and the property type. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination; our house renovation services page covers the wider work. We reply within the hour, and the price agreed is a flat price with no hidden charges. A renovation site visit is free, and a repair inspection is RM180, deducted from the bill if you go ahead.
Methodology: every figure is a ClickBina indicative 2026 Klang Valley range copied from the guide named beside it; pest treatment prices are set by the pest control company that carries out the work.
WhatsApp us your job details for a quote on the repairs — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.