How to choose the bathroom drain that suits your floor, your tiles and your shower, and keeps the smell out.
📍 We serve KL, Selangor & Putrajaya.

A floor trap is a single point drain, usually in a corner or the middle of the shower; a linear drain is a long, narrow channel along one edge of the floor. A floor trap is cheaper and suits most bathrooms; a linear drain lets the floor fall in one direction, which suits large tiles, step-free showers and heavy rain showers. Either way the anti-smell part is the trap below the grating. Swapping one for the other means re-screeding and re-waterproofing the floor: on ClickBina's guides, re-screeding with falls is RM500 – RM1,000 and a full hack-and-redo of a standard bathroom is RM4,500 – RM9,000 (indicative 2026, Klang Valley).
| Work | Indicative price | Source guide |
|---|---|---|
| Clearing a sink, floor trap or shower | RM120 – RM350 | Drain smell guide |
| Basic plumbing call-out or minor repair | RM80 – RM250 | Drain smell guide |
| Hacking and debris disposal, bathroom floor | RM900 – RM1,600 | Walk-in shower guide |
| Re-screed with falls | RM500 – RM1,000 | Walk-in shower guide |
| Waterproofing membrane | RM700 – RM1,300 | Walk-in shower guide |
| Full hack-and-redo including retiling, standard bathroom | RM4,500 – RM9,000 | Walk-in shower guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteThe drain itself is a small part of these figures. What costs money is that the drain sets the falls of the screed, and the screed sits under the waterproofing and the tiles, so changing the drain type means redoing the floor.
A floor trap, often called a floor waste or floor drain, is a round or square grating over a short body that drops into the waste pipe. The floor around it is screeded to fall towards that one point, so the screed is shaped like a shallow funnel. It is the drain in almost every Malaysian bathroom, wet kitchen, yard and balcony.
A linear drain, also called a channel or slot drain, is a long, narrow channel with a grating, a slot or a tile tray on top, set along one wall or across the shower entrance. The floor falls in a single plane towards it, like a gently tilted table. The water still leaves through one outlet and trap at one end or in the middle of the channel.
| Floor trap (point drain) | Linear drain | |
|---|---|---|
| Floor falls | Towards one point from several directions | One direction, single plane |
| Tiles | Cuts around the trap; large tiles need envelope cuts | Large tiles can be laid whole |
| Step-free shower | Possible, but water spreads further | The usual choice |
| Handling heavy flow | Depends on the trap size | Long inlet catches water along the whole edge |
| Cleaning | Lift the grating, clean the trap | Lift the grating or tray, clean the channel and the trap |
| Cost | Lower | Higher, more labour to set level |
| Retrofit | Easy to replace like for like | Means a new screed and membrane |
Neither type is waterproof by itself. Both depend on the membrane being properly bonded to the drain body, and on the falls being correct.
What stops sewer smell and cockroaches is not the grating but the trap below it. The drain smell guide explains the water seal: a small pocket of water that blocks gas from the pipe. When a trap is not used for weeks, the water evaporates and the smell comes straight up. That is the commonest cause of a smelly bathroom, and refilling the trap fixes it.
A linear drain needs the same thing: check that its outlet has a proper trap, and that the trap can be reached for cleaning through the channel.
With a floor trap, every tile has to follow a funnel. On small mosaic or small floor tiles that is easy. On large-format tiles, the tiler must make diagonal envelope cuts from the corners to the trap so each piece can tilt, or the tiles will rock and leave lippage. The large-format tile guide explains why big tiles need a flat, planned substrate.
With a linear drain, the floor is one tilted plane, so large tiles can be laid whole and the grout lines stay straight. A tile-insert linear drain takes a strip of the floor tile in its tray, so the drain almost disappears. Whichever you choose, a wet floor needs grip: the anti-slip tile guide explains the ratings.
The drain is where most bathroom leaks start. The membrane must be dressed down into the drain body or clamped by its flange, not stopped short at the grating. Pipes through the slab need their own collar or sealing. The guide to floor trap leaks shows what happens when that detail is skipped: water tracks along the pipe and appears on the ceiling below.
A linear drain has a longer edge to seal, along its whole length, and most channels come with a bonding flange or membrane collar for that reason. Before tiling, the floor should be ponding-tested with the drain plugged, so a fault shows while it is still cheap to fix.
| What you see | Likely cause | First step |
|---|---|---|
| Water pools away from the drain | Wrong falls in the screed | Check with water; re-screed if severe |
| Sewer smell | Dry trap, or a damaged seal | Run water into the trap first |
| Slow draining | Hair and soap in the trap or channel | Lift the grating and clean |
| Cockroaches at night | Open grating, dry trap or gaps around it | Insert or anti-cockroach grating |
| Stain on the ceiling below | Membrane not sealed to the drain or pipe | Leak detection before any hacking |
ClickBina's leak detection visit is RM300 – RM800, the step to take when a stain appears below a floor trap and the source is not obvious.
In a condo, the existing outlet position through the slab usually stays where it is; moving it means core-drilling and management approval. The channel is placed to suit the outlet, not the other way round.
WhatsApp us your job details for a quote: which room, whether you want a floor trap or a linear drain, and whether the whole floor is being redone. ClickBina handles whole-house refurbishment and trade coordination, so the plumber, the waterproofing applicator and the tiler work to the same drain and the same falls. We reply within the hour, and the price agreed is a flat price with no hidden charges. A site visit is free. A ClickBina defect inspection also checks the falls and traps in a new home. See also defect inspection.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each. Slope ratios, flow rates and seal depths are not quoted, because they depend on the product and the plumber's design; ask for them on the drawing.
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteTell us what you need — we reply within the hour.