Saw Fosroc on a waterproofing quote? Here is what each range is, where it fits, and what to check before you agree.
📍 We serve KL, Selangor & Putrajaya.

Fosroc is a specification-tier construction-chemicals brand that Malaysian homeowners usually meet on a contractor's quotation rather than a shop shelf. Its waterproofing ranges are Brushbond (cementitious and polymer-modified coatings), Nitoproof (liquid-applied coatings and membranes) and Proofex (sheet membranes), and each fits a different job. A Brushbond coating suits tanks and wet areas, a flexible Brushbond or Nitoproof membrane suits decks and roofs, and Proofex is mainly for new basements. On our guides a Brushbond set retails from about RM98 per 22 kg (indicative 2026), but an applied system is priced per square foot, not per pail.
Our waterproofing brand map describes Fosroc as a British-heritage construction-chemicals house whose name Malaysian buyers usually meet on a contractor's quote rather than a shelf. Its centre of gravity is trade: tanks, basements, podium decks and specified wet areas. If Fosroc appears on a good contractor's quote, it is a competent specification-tier answer; if it does not, that is not a problem in itself.
Brand names matter less than the system, the preparation and the detailing. Our Mapei waterproofing guide and Sika waterproofing guide cover two of the other names you will see on quotations.
| Product | What Fosroc says it is | Uses Fosroc lists |
|---|---|---|
| Brushbond | A cementitious coating for concrete and brickwork that provides a waterproof barrier | Water tanks, reservoirs, toilets and bathrooms, balconies, basements |
| Brushbond RFX | A two-component acrylic polymer modified cementitious coating | Mixed on site; applied by brush, roller, trowel or spray |
| Brushbond FLXIII | A two-component polymer modified waterproof membrane, elastomeric | Buried structures and concrete roof decks with protective finishes |
| Brushbond TGP | An economical cementitious coating against low positive or negative water pressure | Treatment plants, water tanks, concrete pipes, manholes |
| Nitoproof 10 | A bitumen emulsion protective coating | Protective coating and curing membrane |
| Nitoproof 600PF | A continuous, seamless water and vapour proof membrane for concrete | Roofs, podiums, balconies, planters, bathrooms, basements |
| Proofex Engage | A pre-applied membrane that mechanically bonds to poured concrete | Below-ground structures before the concrete is cast |
The descriptions above are Fosroc's own, from its product pages listed in the sources. Always read the datasheet for the exact grade on your quotation.
Brushbond is the name most homeowners see. The basic Brushbond coating is a rigid cementitious barrier that Fosroc lists for water tanks, toilets and bathrooms, balconies and basements, and describes as breathable. Brushbond RFX adds an acrylic polymer, and Brushbond FLXIII is the elastomeric grade for surfaces that move, such as roof decks under protective finishes. Brushbond TGP is aimed at structures holding or resisting water, such as tanks and manholes. Our cementitious waterproofing guide explains why rigid and flexible grades suit different surfaces.
The Nitoproof name covers more than one chemistry, so check the grade. Fosroc describes Nitoproof 10 as a brown or black liquid blend of bitumens emulsified with water, used as a protective coating and curing membrane. Nitoproof 600PF is described as a continuous, seamless water and vapour proof membrane for concrete, listed for roofs, podiums, balconies, planters and bathrooms among others. Our bituminous waterproofing guide covers bitumen coatings in general.
Proofex Engage is a pre-applied membrane: it is laid before the concrete is poured, and the poured concrete locks into its mesh to form a mechanical bond. That makes it a new-build product for basements and other below-ground structures, not something applied to an existing home. If a quotation for a renovation mentions Proofex, ask where and how it will be used. Our basement waterproofing guide explains the options for existing basements. Fosroc also lists water vapour and gas protection among the system's uses, which is why it appears in specifications for basements rather than in bathroom quotes.
| Job | Ranges that can be specified | Check before you agree |
|---|---|---|
| Water tank lining | Brushbond or Brushbond TGP | Potable-water suitability for the exact grade |
| Bathroom or wet kitchen floor under tiles | Brushbond grades | Flexible grade at corners and joints; tile adhesive compatibility |
| Balcony or planter | Brushbond FLXIII or Nitoproof 600PF | Protective finish and drainage |
| Flat roof or podium deck | Nitoproof 600PF or Brushbond FLXIII with protection | Exposure and foot traffic |
| New basement | Proofex Engage | Specified at design stage |
Our brand map notes that some Fosroc sets do reach retail in Malaysia, but most lines are quoted through contractors. The product pages on Fosroc's global site cover many markets, so ask the supplier which grades are actually stocked locally, and get the Malaysian datasheet for the grade you will use.
Most waterproofing failures come from the surface, the detailing and the curing, not the brand on the pail. Ask the contractor how the surface will be prepared, how corners, pipe penetrations and floor traps will be detailed, how many coats go on, and how long it cures before tiling or testing. A water test before tiling is worth insisting on in wet areas. If you already have a leak, find it first: leak detection pinpoints the source before anything is hacked.
Whichever brand is named, the quotation should state:
A quotation that simply says "Fosroc waterproofing" with a lump sum is hard to compare. Asking for the grade and the method turns it into something you can check against the maker's datasheet, and against a second quote.
These are indicative 2026 figures from the ClickBina guides named in the sources section. Material is the minority of a real job's cost; an applied system is priced per square foot.
| Item | Indicative price | Source guide |
|---|---|---|
| Brushbond two-part set, retail | From about RM98 per 22 kg | Waterproofing brands guide |
| Brushbond TGP, retail | About RM179 | Waterproofing brands guide |
| Flexible Brushbond grade, retail | About RM348 | Waterproofing brands guide |
| Conventional applied waterproofing systems | RM6 – RM18 per sq ft | Waterproofing brands guide |
| Leak detection visit | RM300 – RM800 | Concealed pipe leak detection guide |
WhatsApp us your job details for a quote — we reply within the hour.
A repair inspection is RM180, deducted from the repair bill if you go ahead. To quote faster, tell us your area, property type and the size or quantity.
💬 WhatsApp for a quoteClickBina is an experienced KL & Selangor contractor handling whole-house refurbishment and trade coordination. WhatsApp us your job details for a quote: the area, the problem, and any quotation you already have. We reply within the hour, the price we agree is a flat price with no hidden charges, and a repair inspection is RM180, deducted from the repair bill if you go ahead. If there is an active leak, leak detection is RM300–RM800 and is charged separately.
How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above. They are indicative 2026 figures, not fixed rates. Product descriptions are the maker's; ClickBina is not affiliated with Fosroc.