Sika 107 vs SikaTop 107 Malaysia: Which to Order
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesToolsAbout🔍 SearchFree Quote
Waterproofing & Leak Repair

Sika 107 vs SikaTop 107
Which Pack You Are Actually Ordering (2026)

The number 107 sits on two different Sika Malaysia products with different components, packs and coverage schedules — here is how to make sure the quotation names the one you need.

Two pails of grey cementitious waterproofing slurry with mixing paddle and trowel
There is no Sika product called simply “Sika 107”. In Sika Malaysia’s own published range the number 107 sits on two different products: SikaTop Seal-107 (MY), a two-part polymer-modified cementitious slurry supplied as a 25 kg set, and SikaTop Seal-107 Fibre MY, a one-component cement-based waterproofing mortar in a 20 kg bag. They mix differently, cover differently and are listed for different jobs, so a quotation that says only “Sika 107” has not yet told you what you are buying. WhatsApp ClickBina for a fixed quote.

“Sika 107” is a shorthand, not a product name

Ask around a Klang Valley hardware shop for “Sika 107” and you will be handed something. Ask two shops and you may be handed two different things, because the number on its own is not a product. Sika Malaysia’s published waterproofing-mortars range lists three products in that family — SikaTop Seal-107 (MY), SikaTop Seal-109 MY and Sikalastic-1 KMY — and the 107 designation also appears on a separate one-component product, SikaTop Seal-107 Fibre MY, listed under Sika Malaysia’s home-improvement range. Nothing is listed as plain “Sika-107”.

That matters far more than it sounds. The two products carrying 107 are not variants of one another in the way “same thing, one has fibre in it” suggests. One is a two-component set where a liquid polymer is mixed with a cement powder. The other is a single cement-based bag you add water to. They arrive in different pack weights, they are mixed by different people to different rules, and Sika lists different coverage schedules for them. If your quotation, your material order or your WhatsApp message to a supplier says only “Sika 107”, the decision about which one lands on your bathroom floor has been delegated to whoever picks the stock.

This page is only about that ordering confusion. If you want the wider map of Sika’s categories — the plugging compounds, the liquid roof membranes, the sealants — that is covered in the Sika waterproofing guide, and choosing a brand at all is covered in best waterproofing products. Neither is repeated here.

The two products that actually carry 107

Everything in the table below is taken from Sika Malaysia’s own product pages for the two products. Read it as the specification difference, not as a ranking — neither one is “better”, they are listed for different situations.

 SikaTop Seal-107 (MY)SikaTop Seal-107 Fibre MY
What Sika calls itTwo part polymer modified cementitious waterproof mortar slurryOne component waterproofing mortar, cement based, with selected aggregates and admixture
ComponentsTwo — a liquid polymer component and a cement-based powder componentOne — a single cement-based powder
PackPart A 5 kg can plus Part B 20 kg bag, sold as a 25 kg set20 kg bag
What the polymer or fibre is there forSika describes the product as polymer modifiedSika describes it as incorporating synthetic resins and being “slightly more flexible than a normal mortar”
Vapour behaviourListed as a waterproofing slurry and protective coatingSika states it is waterproofing but permeable to water vapour, and that it slows the progression of carbonation
Minimum coatsMinimum 2 coats; 3 in areas of high infiltrationMinimum 2 layers; possibly 3 where leakage is extremely strong
Stated layer thicknessApplied to Sika’s stated coverage per coatMinimum 1 mm and maximum 2 mm per layer

Get a free quote on WhatsApp

Got a quote that just says “Sika 107”? Send us the quote line — we will tell you which of the two products it could mean and what is missing from the line.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

The single most useful row is the first one: two components versus one. That difference decides who can mix it, what goes wrong when it is mixed badly, and what the finished coat is being asked to do.

SikaTop Seal-107 (MY): the two-part set

Sika Malaysia describes SikaTop Seal-107 (MY) as a two part polymer modified cementitious waterproof mortar slurry, made up of a liquid polymer and a cement based mix incorporating special admixtures, applied to concrete and mortar to prevent water infiltration. It is supplied pre-batched — a 5 kg liquid can and a 20 kg powder bag making a 25 kg set — and Sika lists pre-batched components as one of the product’s advantages, because the correct ratio is in the box rather than in someone’s judgement.

That pre-batching is also where site practice goes astray. Sika’s own guidance is that mixing the full quantities of both components gives a slurry consistency, and that the consistency can be altered by reducing the amount of Part A used — for trowel application, to around 90 per cent of Part A, roughly 4.5 kg to a 20 kg bag of Part B. Note the direction of that instruction: it permits less liquid for a stiffer trowel mix. It is not an invitation to add water to make a thin coat go further. A crew that stretches the set by watering it down has changed the product, and no coverage figure on the datasheet applies any more.

Sika lists the uses as interior and exterior waterproofing and damp-proofing of concrete, cementitious rendering, brickwork and blockwork; exterior waterproofing of basement walls in new construction and refurbishment; and waterproofing of concrete surfaces including bathrooms, roofs, balconies, basements and water tanks. The stated advantages are pre-batched components that mix and apply easily, good adhesion to sound prepared substrates, non-toxic and suitable for contact with drinking water, and non-corrosive to steel or iron.

SikaTop Seal-107 Fibre MY: the one-bag mortar

SikaTop Seal-107 Fibre MY is a different animal despite the shared number. Sika describes it as a one component waterproofing mortar, cement based, with selected aggregates, recycled material and admixture; it incorporates synthetic resins, and Sika describes the result as slightly more flexible than a normal mortar while remaining waterproofing but permeable to water vapour. Sika also states that it slows the progression of carbonation.

The listed uses overlap with the two-part product but are worded differently and are worth reading closely: rigid waterproofing of water tanks, bathrooms and toilets; interior and exterior waterproofing of concrete, rendering, brickwork and blockwork; exterior waterproofing of basement walls; sealing hairline cracks in concrete; and filling pores and blowholes. Two of those — crack sealing and blowhole filling — are repair and make-good jobs rather than membrane jobs, which tells you something about where this product sits in a system.

It comes as a 20 kg bag, not a set, and Sika’s stated application is a minimum of two coating layers, possibly three where leakage is extremely strong, at a minimum of 1 mm and a maximum of 2 mm per layer. If someone hands you a single 20 kg bag when your quotation said “Sika 107” and you were expecting a two-part set, that is not a substitution error you should wave through — it is a different specification, and it deserves a conversation before the bag is opened.

The 109 trap: the word “flexible” sits on a different number

Here is the detail that trips up people who are trying to do the right thing. In Sika Malaysia’s waterproofing-mortars listing, the word flexible is attached to two products, and neither of them is 107. SikaTop Seal-109 MY is described as a polymer-modified, flexible, cementitious waterproofing coating. Sikalastic-1 KMY is described as a one component fibre reinforced, flexible cementitious waterproofing compound. Seal-107 (MY) is described as polymer modified; Seal-107 Fibre is described as slightly more flexible than a normal mortar.

So if the reason you are buying a cementitious product is that the substrate moves — a screed with hairline cracking, a balcony slab, a roof deck that heats and cools every day — the number you have written down may not be the number that carries the property you actually need. This page will not tell you that one product bridges cracks and another does not, because that is a datasheet claim and it belongs to Sika, not to us. What it will tell you is the question to ask: “what crack-bridging figure does the datasheet state for the exact product you are quoting, and at what thickness?” If the answer is a shrug, you do not yet have a specification. The wider comparison between rigid and flexible systems is set out in cementitious waterproofing and flexible waterproofing membranes.

Coverage and coats: the figures to hold an applicator to

Coverage is the number that decides whether you got a membrane or a coloured wash, and it is the number most often quietly abandoned on site. Both Sika Malaysia product pages publish one, and they are not the same schedule — another reason the shared “107” is misleading.

ProductSika’s stated consumptionCoats
SikaTop Seal-107 (MY)1.0 kg/m² per coat for bathrooms and terraces; 1.5 kg/m² per coat where water pressure is high; 2.0 kg/m² per coat as a protective coatingMinimum 2 coats, 3 in areas of high infiltration; the data sheet also specifies an upturn height — ask for that figure and hold the applicator to it as a dimension
SikaTop Seal-107 Fibre MYUp to 1.5 kg/m² per layer below one metre height and up to 2 kg/m² per layer above it, to a maximum of 4 kg/m² per layerMinimum 2 layers, possibly 3 where leakage is extremely strong; 1 mm minimum and 2 mm maximum per layer

Use those figures as arithmetic, not as trivia. Multiply the stated rate per coat by your floor and upstand area, multiply by the number of coats, and compare the answer with how much material actually turns up on site. A bathroom that should have consumed two full bags and consumed one did not get the specification you paid for, whatever the finished surface looks like. Sika Malaysia publishes the current figures on the product page for each item, and versions are revised — ask for the data sheet edition for the pack being delivered rather than relying on a number from a guide, this one included. That single habit is the difference between a specification and a hope, and it is the theme of why waterproofing fails.

Which one is listed for which job

Both products are listed by Sika for overlapping situations, which is exactly why the ordering confusion survives. The differences that actually decide a job are below, drawn from the two product pages.

SituationWhat to look forWhy
Bathroom or toilet floor before tilingBoth are listed for bathrooms and toilets; confirm the coverage schedule and coat count for whichever is suppliedThe failure here is thin application and missed upstands, not the choice of pack
Concrete water tankBoth are listed for water tanks; if the tank holds drinking water, check the potable-contact statement on the exact productOnly one of the two carries an explicit drinking-water statement on its Sika Malaysia page
Basement wall, external faceBoth are listed for exterior waterproofing of basement wallsThe harder question is positive versus negative side, not the pack — see basement waterproofing
Hairline cracks, pores and blowholes in concreteSika lists crack sealing and blowhole filling among the Fibre product’s usesThat is a make-good task, and it often precedes rather than replaces a membrane
A substrate that movesAsk for the stated crack-bridging figure; Sika applies the word “flexible” to Seal-109 and Sikalastic-1 K, not to either 107A rigid coat over a moving crack telegraphs the crack straight through
Exposed flat roofCementitious is one option among several; liquid membranes are the other conversationSee flat roof waterproofing and liquid membranes

Water tanks and drinking water: the one claim worth checking

Among the advantages Sika Malaysia lists for SikaTop Seal-107 (MY) is that it is non toxic and suitable for contact with drinking water, and the page names potable concrete water tanks among its uses. It also lists the product as non-corrosive to steel or iron. Those are meaningful statements for anyone lining a domestic tank, and they are exactly the sort of claim that must be read off the current data sheet for the product actually being supplied rather than assumed from a family name.

The practical rule for a potable tank is simple and worth following even when the paperwork looks fine. Confirm the drinking-water statement in writing for the exact product and pack. Confirm what the applicator will do about cleaning and flushing before the tank is returned to service. And confirm the waiting period the data sheet requires before the tank is filled, because a coat that is filled too early has not finished becoming what it is supposed to be. Tank work in general, including the sequence for taking a tank out of service and recommissioning it, is covered in RC water tank internal waterproofing and water tank leak repair.

How the mix-up actually happens when you order

Nobody sets out to buy the wrong product. The substitution happens through a chain of small, reasonable-looking steps, and knowing the chain is how you break it.

  1. The quotation abbreviates. A line reads “waterproofing — Sika 107, 2 coats”. Everyone reading it pictures something slightly different.
  2. The number gets typed differently everywhere. The same family appears in the wild as SikaTop Seal-107, Sika Top Seal 107, SikaTop 107 and Sikatop-107. Search results and listing titles blur them together, and component letters get transposed in listing titles too. The pack in your hand is the authority, not the listing that sold it.
  3. Stock decides. Whatever is on the shelf that morning goes into the van. A 20 kg bag and a 25 kg set both satisfy “Sika 107” to a storeman.
  4. Nobody re-reads the pack. Two-part or one-part is visible on the packaging in seconds, and that check almost never happens because the number matched.
  5. The coverage schedule silently changes. The two products have different stated consumption rates, so the material quantity that was right for one is wrong for the other, and the shortfall shows up as a thin coat rather than as a missing bag.

Breaking the chain costs one sentence in your quotation and one photograph on delivery day. How to read a waterproofing quotation covers what else belongs on that document.

What to ask before the material is ordered

  • The full product name as printed on the pack, not a number — including whether it is the Fibre product and whether it is the Malaysian pack.
  • Whether it is one component or two, and the pack weight being delivered.
  • The data sheet edition for that pack, sent to you as a file before the job starts.
  • The coverage rate per coat the applicator is working to, and the number of coats.
  • The total quantity of material being ordered for your measured area, so the arithmetic is on the record.
  • The upstand height at every wall and kerb, stated as a dimension rather than “as required”.
  • What surface preparation is included, and what happens if the substrate turns out to be unsound when it is exposed.
  • For a potable tank, the drinking-water statement for the exact product, in writing.
  • The waiting period before covering or filling, and what test is done before anything hides the work.

The wider vetting list is in questions to ask a waterproofing contractor, and the patterns worth walking away from are in waterproofing scams.

How to check it was applied properly

A cementitious waterproofing coat is checkable for a short window and invisible afterwards, so the checks have to be booked rather than remembered.

  • Photograph the empty packs. Before anything is thrown away, photograph the packaging with the product name legible and count them. That is your evidence that the quantity matched the calculated coverage.
  • Photograph each coat. Different-coloured coats are easier to verify; ask for a photograph of the full area after each one, including corners and behind the door.
  • Check the upstands. Walk the perimeter and confirm the coat continues up the wall to the stated height everywhere, not just where it is easy to see.
  • Check the details. Floor traps, pipe penetrations and the wall-floor angle are where leaks start. They should be visibly detailed, not simply painted over.
  • Ask for a ponding test before tiling, and be present when it is filled and when it is read. The method is set out in bathroom waterproofing.
  • Do not accept tiling over a coat that has not had its waiting period. Once the tiles are down, the evidence is gone and so is the cheap moment to fix anything.

When a 107-class product is the wrong tool entirely

Plenty of Malaysian leaks get a cementitious slurry thrown at them when the problem is not one a surface coat can solve. Three cases come up constantly.

Water is already coming through to the floor below. If a ceiling downstairs is wet, the water has found a path through the slab, and a coat applied to the top face of a tiled floor does not close it. That is injection or a full re-waterproof, and the choice between them is set out in injection versus membrane waterproofing and PU injection for a leaking ceiling.

The substrate moves. A rigid coat over a crack that opens and closes fails at the crack, and reapplying the same product produces the same result. That is the case for a flexible system, and it is a specification decision to make before ordering, not after the second failure.

The real problem is grout, not waterproofing. Water going through open grout joints into a sound slab is a re-grouting job with a completely different price. Grouting versus waterproofing separates the two, and it is worth reading before anyone hacks a floor.

What the installed job costs

The figures below are for the installed system — supply and apply by a contractor — not for a pack on a shelf. Product retail prices move with pack size, grade and dealer, and this page deliberately does not quote them; ask your supplier for the current shelf price of the exact pack. These are market bands for a first conversation (market estimate 2026, indicative Klang Valley):

Installed systemMarket range (2026, Klang Valley)Notes
Cementitious slurryRM6 – RM10 per sq ftthe family both 107-designated products belong to
Flexible two-part membraneRM8 – RM14 per sq ftwhere the substrate moves and a rigid coat would crack

For a bathroom, the number most people actually want is the job price rather than the rate. ClickBina re-waterproofs a bathroom at RM1,500 – RM3,500 per bathroom without hacking, or RM4,500 – RM9,000 per bathroom with tiles off and a new membrane — those are our prices, not a market range. Where the leak path is unclear, leak detection and assessment is RM300 – RM800 per visit. The per-square-foot bands and what drives them are broken down in waterproofing cost per square foot and bathroom waterproofing cost.

Why ClickBina

ClickBina waterproofs bathrooms, tanks, balconies and roofs across Kuala Lumpur and Selangor, and on a job like this the useful thing we bring is not a brand preference — it is a written specification. That means the exact product name and pack on the quotation rather than a number, the coverage rate and coat count stated up front, the upstand height given as a dimension, photographs of each coat before anything covers it, and a ponding test you are invited to watch. Where the leak path is not obvious we do a paid detection visit at RM300 – RM800 per visit. Browse all of our waterproofing and leak repair services, or send photographs of the area and of any product already bought on WhatsApp for a fixed quote.

What pushes a 107-class waterproofing quote up or down

Which 107 pack is on the quotation matters less to the final number than the system around it. On this page's own figures, these are what move it:

  • Rigid or flexible. A cementitious slurry is RM6–RM10 per sq ft installed; if the slab moves and you need a flexible two-part membrane instead, that band is RM8–RM14 per sq ft.
  • Tiles on or tiles off. Re-waterproofing a bathroom without hacking is RM1,500–RM3,500; stripping the tiles and laying a new membrane is RM4,500–RM9,000.
  • Coats and coverage. Three coats in a high-infiltration area, or Sika's heavier per-coat rate where water pressure is high, means more material on the order for the same floor.
  • Upstands and details. Floor traps, pipe penetrations and a stated upstand height at every wall add labour that a quote reading only “Sika 107, 2 coats” tends to leave out.
  • An unclear leak path. If water is already reaching the ceiling below, a detection visit comes first, at RM300–RM800 per visit, charged on its own.

WhatsApp us the floor size, photos of the floor trap and wall-floor angle, and a photo of any pack already bought with its label legible, for a free quote.

What happens when you WhatsApp us about a 107 job

  1. Send details of the area to be waterproofed, the floor trap and any pipe penetrations, plus the product name of anything a previous contractor or shop has supplied.
  2. We'll reply as soon as we can with a free quote that names the full product as printed on the pack, the coverage rate and the coat count — not just a number.
  3. Where the floor and upstands need a site visit, a renovation site visit is free; a repair inspection visit is RM180, and if you go ahead with the repair we'll give you a discount.
  4. The figure is a flat price for that written specification, with no hidden charges when the packs are counted on delivery day.

Ready to price your waterproofing job?

Already have a 20 kg bag or a 25 kg set on site? A photo of the pack label and the bathroom floor lets us say whether it suits the job and what the installed price looks like.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & official references

This guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

Is Sika 107 the same as SikaTop 107?
“Sika 107” is a shorthand rather than a product name. Sika Malaysia’s published range carries the number on two different products: SikaTop Seal-107 (MY), a two-part polymer modified cementitious waterproof mortar slurry supplied as a 25 kg set, and SikaTop Seal-107 Fibre MY, a one component cement based waterproofing mortar in a 20 kg bag. Nothing is listed as plain Sika-107, so a quotation using the bare number has not specified anything yet.
What is the difference between SikaTop Seal-107 and SikaTop Seal-107 Fibre?
Component count and pack, first of all: the Seal-107 set is two parts, a 5 kg liquid can plus a 20 kg powder bag, while the Fibre product is a single 20 kg bag. Sika describes the first as polymer modified and the second as one component with synthetic resins, slightly more flexible than a normal mortar and permeable to water vapour. Sika also publishes different consumption schedules for the two, so the material quantity for one is wrong for the other.
Which Sika cementitious product is the flexible one?
In Sika Malaysia’s waterproofing-mortars listing, the word flexible is attached to SikaTop Seal-109 MY, described as a polymer-modified flexible cementitious waterproofing coating, and to Sikalastic-1 KMY, described as a one component fibre reinforced flexible cementitious waterproofing compound. Neither 107 product carries that wording. If movement in the substrate is your reason for buying, ask for the crack-bridging figure stated on the data sheet of the exact product being quoted.
How much SikaTop Seal-107 do I need for my bathroom?
Work it from Sika’s stated consumption rather than from a rule of thumb. Sika Malaysia lists 1.0 kg/m² per coat for bathrooms and terraces, 1.5 kg/m² per coat where water pressure is high, and 2.0 kg/m² per coat as a protective coating, at a minimum of two coats and three in areas of high infiltration. Multiply the rate by your floor and upstand area and by the coat count, then check what actually arrives on site against that figure.
Can SikaTop Seal-107 be used in a drinking water tank?
Sika Malaysia lists SikaTop Seal-107 (MY) among its uses for potable concrete water tanks and states in the product advantages that it is non toxic and suitable for contact with drinking water. Read that off the current data sheet for the exact product and pack being supplied rather than assuming it from the family name, and confirm with your applicator the waiting period required before the tank is filled and what cleaning and flushing happens before it goes back into service.
My contractor delivered a 20 kg bag but the quote said Sika 107. Is that wrong?
It is not automatically wrong, but it is a different specification and it deserves a conversation before the bag is opened. A 20 kg single bag is consistent with the one component Fibre product; the two-part Seal-107 set arrives as a 5 kg liquid can plus a 20 kg powder bag. Ask which product is being supplied, ask for its data sheet, and check that the coverage schedule and coat count on your quotation still match what has turned up.
Why does the same product appear under so many different names?
Because the family name gets typed a dozen ways — SikaTop Seal-107, Sika Top Seal 107, SikaTop 107, Sikatop-107 — and listing titles are written by many different hands, including ones that transpose the component letters. Treat the printed pack as the authority and the listing title as a rough guide. The reliable fix is to put the full product name as printed on the pack into your quotation, and to photograph the delivered packs before anything is opened.
What should I check before the waterproofing is tiled over?
Photograph the empty packs with the product name legible and count them against the calculated coverage. Get a photograph of the full area after each coat, including corners and behind the door. Walk the perimeter and confirm the coat continues up the wall to the stated upstand height everywhere. Check that floor traps, pipe penetrations and the wall-floor angle are visibly detailed. Then ask for a ponding test, and be there when it is filled and when it is read.