Davco K10 Plus Malaysia 2026: PU, Not Cementitious
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
Waterproofing & Leak Repair

Davco K10 Plus Waterproofing
A Water-Based PU Membrane, Not a Cementitious One (2026)

Davco K10 Plus is routinely ordered as if it were a cement-based slurry. Here is what the published data sheet actually specifies, and how to check it was applied to it.

📍 We serve KL, Selangor & Putrajaya.

Flexible waterproofing membrane brushed over a bathroom screed with corner reinforcement
Davco K10 Plus is not a cementitious product. Sika’s published data sheet describes it as a flexible, premixed, ready-to-use water-based polyurethane Class III waterproofing membrane for use under tile and stone — a liquid you brush or roll straight from the pail in a minimum of two coats to a stated dry film thickness, not a powder you mix with water. If your quotation groups it with cementitious slurries, the preparation, the priming and the waiting periods on that quotation are the wrong ones. WhatsApp ClickBina for a fixed quote.

What Davco K10 Plus actually is

Sika publishes the Davco K10 Plus data sheet — the Davco range sits under Sika — and the description it carries is worth reading word by word: a flexible, premixed, ready to use, water based polyurethane Class III waterproofing membrane, designed for use under tile and stone and other resilient finishes. Every clause in that sentence changes how the material is handled on site.

  • Premixed and ready to use means there is no mixing ratio, no pot life and no two-component discipline. It also means there is nothing to hide a diluted pail behind — the material either goes on as supplied or it does not.
  • Water based means it is low odour and solvent free, which is why the data sheet notes it as suitable for confined areas. It also means the drying is by water leaving the film, so humidity and ventilation matter.
  • Polyurethane is the part everyone skips. This is a liquid PU membrane, not a cement-based slurry, and the two families are prepared, primed, detailed and tested differently.
  • Under tile and stone means it is specified as a concealed membrane in a tiled build-up, not as a finished wearing surface.

It is supplied in 4 litre and 20 litre pails, in green or grey, and it is applied by thick brush or medium-nap roller. If you arrived here from cementitious waterproofing, this is a different chemistry from the products on that page, and the rest of this guide is mostly about what changes as a result.

Why a PU membrane gets ordered as a cementitious one

The confusion is structural rather than careless. In a Malaysian wet-area quotation the word “waterproofing” usually implies a grey powder mixed on site, because that is what most homeowners have watched a contractor do. So a product with a code, a pail and a wet-area use gets filed mentally under the same heading, and the differences only surface when something on site does not match — there is nothing to mix, the colour is wrong, or the tiler is told to wait a different length of time.

 Cementitious slurry systemsDavco K10 Plus, per the data sheet
What arrivesPowder, or a powder plus a liquid polymer to be mixed in a stated ratioA premixed, ready-to-use liquid in a 4 L or 20 L pail
ChemistryCement-based, often polymer modifiedWater-based polyurethane
Mixing on siteRatio and pot life both matter, and both get abusedNone — which removes one failure mode entirely
Consumption stated asKilograms per square metre per coatSquare metres covered per pail over two coats
What is measuredMaterial consumed per areaDry film thickness, with a wet film thickness per coat
Substrate toleranceBonds to sound concrete, render and screedData sheet calls for specific primers on lightweight blocks, metal and building boards
Waiting before tilingDepends on the product’s own data sheetData sheet states 6 to 8 hours before tiling, and 3 days before flood testing

Get a free quote on WhatsApp

WhatsApp us your job details — we'll reply as soon as we can with a free quote.

RM180 for the inspection visit. If you go ahead with the repair, we'll give you a discount. To quote faster, tell us your area, property type and the size or quantity.

💬 Get Your Free Quote
Free quoteFlat price, no hidden chargesExperienced KL & Selangor contractor

None of that makes one family better than the other — they are specified for overlapping situations and a competent contractor uses both. It does mean that a quotation which names this product but describes a cementitious method has not been thought through, and it is worth one question before anyone starts.

What the published data sheet states

The figures below come from Sika’s published Davco K10 Plus data sheet and product page. That documentation is published for the Australian market, which is where Sika publishes the Davco technical sheets; treat the numbers as the manufacturer’s stated values and ask your supplier for the data sheet edition that applies to the pack actually being delivered to you before you hold anyone to them. Editions are revised, and a figure copied out of a guide is not a specification.

ItemWhat the data sheet statesWhat it means on your job
FormatFlexible, premixed, ready to use, water based polyurethane membraneNothing to mix; nothing to dilute
ClassificationClass III, described as highly flexible with elongation greater than 500 per centAsk which standard that class is measured against for your pack
Packs and colour4 litre and 20 litre pails; green, or green and grey in the 20 litreDifferent-coloured coats make coat count checkable
CoverageAbout 13.3 m² from a 20 litre pail and about 2.75 m² from a 4 litre pail, at two coatsTurn this into a pail count for your measured area before work starts
CoatsMinimum two coats, applied at right angles to each other; further coats if requiredTwo is the floor, not the target
Film thicknessMinimum 1.0 mm total dry film thickness, from a minimum 0.75 mm wet film per coatThe number a stretched job actually fails on
Between coats1 to 2 hoursFast, but humidity extends it — it is a minimum, not a schedule
Before tiling6 to 8 hoursDo not let a tiler start on the same morning as the second coat
Before flood testing3 daysA flood test on day one proves nothing and can damage the film

Where the data sheet places it — and where it stops

Sika lists the product as suitable for interior and exterior application on commercial and domestic walls and floors, including wet areas such as showers, bathrooms, terraces, balconies, roofs and walkways, prior to tiling. It also notes that being water based and solvent free makes it suitable for confined areas — a genuinely useful property in a small internal bathroom with no ventilation, where a solvent-borne product is unpleasant and sometimes unworkable.

The phrase that does the limiting work is prior to tiling. This is specified as a concealed membrane under a tile or stone finish, not as an exposed wearing surface. If the intention is to leave a liquid membrane visible and walked on, that is a different specification and a different product class — the trafficable-coating conversation is covered in liquid waterproofing membranes. And as with any membrane, the data sheet describes what the product does; it does not describe your substrate. Falls to the trap, sound screed, a working floor trap and a sensible upstand height are all outside the pail and all decide whether the bathroom leaks. Those are set out in bathroom waterproofing and shower floor leak repair.

“Class III” and the elongation figure: what to ask

The data sheet describes the product as Class III and as highly flexible, with elongation greater than 500 per cent. Both are meaningful, and both are worth one clarifying question rather than being taken as self-explanatory.

A membrane class is a rating against a standard, and which standard applies depends on the market the data sheet was written for. So the question to put to a supplier is: “which standard is that class measured against, and does the pack you are supplying carry the same classification?” That is not pedantry — it is the difference between a specification you can hold someone to and a marketing phrase. If a specification for your project calls for a particular class, the classification has to be evidenced for the actual product supplied, not inferred from a family name.

The elongation figure is similar. High elongation is why a flexible membrane can accommodate movement that a rigid coat would crack over, but elongation is measured on a film at its stated thickness, which is another reason the dry film thickness below is the number that matters most. A membrane applied at half its specified thickness does not deliver half the performance; it delivers a film that fails where it is thinnest, which is always at the detail you cannot see.

Priming: the step that decides whether it bonds at all

This is where a PU membrane parts company most sharply from a cementitious slurry, and it is the step most often skipped because it is invisible and adds a visit. Sika’s data sheet calls for priming on specific substrates: two coats of a porous primer on lightweight blocks, an etching primer on metal surfaces, and a suitable Sika-branded primer on building boards.

Those three cases cover a lot of real Malaysian bathrooms and balconies — lightweight block partition walls, metal upstands and trims, and fibre-cement or building board on a stud wall behind a shower. If your job includes any of them and the quotation has no primer line, ask about it before the pails arrive, because a membrane that has not bonded is a sheet of plastic sitting under your tiles rather than a waterproof layer. Priming also has a second effect on a porous substrate: it reduces how much of the first coat gets sucked in, which is part of why the stated coverage assumes the substrate was prepared as specified.

Whatever the substrate, the underlying condition is the same as for any membrane: sound, clean, dry and free of anything that is already letting go. The wider pattern of what preparation failure looks like a year later is in why waterproofing fails.

Bond breakers at cracks, joints and sheet junctions

The data sheet calls for a 50 mm wide polyethylene or polypropylene tape over cracks and joints subject to movement, and at building board and sheeting joints. That tape is a bond breaker, and understanding what it does is the difference between a detail that survives and one that tears.

A membrane bonded tightly to the substrate on both sides of a moving crack has to absorb all of that movement across the width of the crack itself — effectively zero width, so any movement at all is a very large local strain, and the film tears no matter how elastic it is. Lay a strip of tape over the crack first and the membrane is now unbonded across 50 mm, so the same movement is spread across 50 mm of film instead of across a hairline. That is the entire mechanism, and it is why “we just put an extra coat over the crack” is not the same thing and does not work.

The joints that need it in a normal bathroom are the ones people forget: the junction between a lightweight block wall and the slab, the joints between sheets of building board behind a shower, and any construction joint in the floor. The wall-floor angle itself normally needs a detail too. If a quotation has no line for reinforcement or bond-breaker tape at junctions, it has priced a field coat and left out the places leaks actually start.

Two coats at right angles, and why the direction matters

The data sheet specifies a minimum of two coats applied at right angles to each other, with further coats if required, using a thick brush or a medium-nap roller. The right-angle rule is not a stylistic preference. Any roller or brush pass leaves a film that is thicker in some lines and thinner in others; laying the second pass across the first means the thin lines of one coat sit under the thick lines of the other, and the combined film is far more even than two passes in the same direction would be. In a membrane whose performance is defined by its thinnest point, evenness is the whole game.

The colour choice helps here. Where the pails come in two colours, applying the two coats in different colours makes the coat count and the coverage visible — any patch where the first colour still shows through is a place the second coat missed. Ask for that if it is available, and ask for photographs of each coat before the next one goes on.

“Minimum two” also deserves emphasis. Two is the floor set by the data sheet, and the sheet allows further coats if required. On a rough or porous substrate, or where the wet film thickness per coat is not being achieved, more coats are how the specified thickness is reached — not fewer, thicker ones.

Dry film thickness: the number a thin job fails on

Sika’s stated figures are a minimum 1.0 mm total dry film thickness, built from a minimum 0.75 mm wet film thickness per coat. Those two numbers together are the most useful thing on the data sheet, because they let you check the work with arithmetic rather than faith.

Start from the coverage: about 13.3 square metres from a 20 litre pail at two coats, and about 2.75 square metres from a 4 litre pail. Measure your area, including the wall upstands, and divide. A shower and floor area that works out at two pails and gets one has not received the specified membrane, whatever the surface looks like when it is dry. Write the pail count into the quotation, and count the empty pails at the end — that single habit catches more thin applications than any inspection.

A wet film thickness gauge is a cheap comb-shaped tool that an applicator dips into the wet coat to read its depth directly, and asking whether one will be used tells you a great deal about how the job will be run. It is standard practice on commercial membrane work and unusual on domestic work, which is precisely why domestic membranes are so often thin.

The waiting periods: recoat, tiling and the flood test

Three intervals appear on the data sheet, and each is broken for a different reason.

  1. 1 to 2 hours between coats. Fast enough that a bathroom can be membraned in a morning, which is exactly why it gets rushed further. These are drying times for a water-based product, so a humid, unventilated internal bathroom in the monsoon is not “normal conditions” — the interval is a minimum, not a schedule, and the coat is ready when it is ready.
  2. 6 to 8 hours before tiling. The commonest breach on a renovation programme, because the tiler is booked for the same day and everybody wants the job to move. Tiling onto a membrane that has not dried damages it under the adhesive, where nobody will ever see it.
  3. 3 days before flood testing. This one surprises people who expect to see a ponding test immediately. Flooding an immature film is both an unfair test and a way to damage it. Book the test, put the date on the programme, and be there when it is filled and when it is read.

The knock-on effect is scheduling: a membrane installed properly puts three days between the waterproofer and the tiler, and a renovation programme that has not allowed for that will apply pressure at exactly the wrong moment. Agree the sequence before the job starts rather than arguing about it on the day.

The application faults that show up later

FaultWhat happensWhat the data sheet asks for
No primer on lightweight block, metal or building boardThe membrane never bonds; it lifts as a sheet under the tilesTwo coats of porous primer on lightweight blocks, etching primer on metal, a suitable primer on building boards
Watering down the pail to stretch itFilm too thin to reach 1.0 mm dry, failing first at the detailsPremixed and ready to use — there is nothing to dilute
Both coats rolled in the same directionUneven film with thin lines running through itSecond coat at right angles to the first
No bond-breaker tape at moving jointsThe membrane tears along the crack it was meant to cover50 mm polyethylene or polypropylene tape over cracks and joints subject to movement
Tiling the same morningMembrane damaged under the adhesive where it cannot be inspected6 to 8 hours before tiling
Flood testing immediatelyAn unfair test on an immature film, and possible damage to it3 days before flood testing
Upstands stopped at skirting heightWater tracks behind the membrane at the wall, and the leak looks like a floor failureUpstands specified as a dimension on the quotation, not “as required”

What to ask before it is ordered

  • The full product name and pack size as printed on the pail, and the data sheet edition for that pack, sent to you as a file.
  • Which standard the Class III rating is measured against for the pack being supplied.
  • The number of pails being ordered for your measured area, worked from the stated coverage.
  • The primer for each substrate on your job — block, metal trim, building board — as a priced line.
  • The bond-breaker or reinforcement detail at cracks, joints, sheet junctions and the wall-floor angle.
  • The upstand height at every wall and kerb, stated as a dimension.
  • The coat count, and whether the coats will be in different colours so they can be checked.
  • Whether a wet film thickness gauge will be used, and what dry film thickness is being worked to.
  • The programme: the interval before tiling and the date of the flood test, written down.
  • What happens if the flood test fails, and who pays for the tiles that come off.

Two further guides make comparing quotations easier: how to read a waterproofing quotation and questions to ask a waterproofing contractor.

How to check it was applied properly

A concealed membrane is checkable for about a day and invisible for the next twenty years, so every check has to be booked in advance. Ask for a photograph of the prepared and primed substrate before the first coat. Ask for a photograph of the full area after each coat, including the upstands, the floor trap surround, the pipe penetrations and the corner behind the door — the four places leaks actually begin. Count the empty pails against the calculated number and photograph them.

Then insist on the flood test, three days after the last coat, with you present when it is filled and when it is read. Mark the water level, leave it for the agreed period, and read it against the mark rather than against a memory. Check the ceiling below at the same time if there is one. And do not let tiling start before the test simply because the tiler is available — once the tiles are down, a failed membrane costs the tiles as well as the membrane, and that is the whole argument for testing first. The general case is set out in toilet waterproofing without hacking and upstairs bathroom leaks.

What the installed wet-area job costs

The bands below are for the installed system — supply, preparation and application by a contractor — not for a pail on a shelf. Product retail prices move with pack size and dealer and are not quoted here; ask your supplier for the current price of the exact pack (market estimate 2026, indicative Klang Valley):

Installed systemMarket range (2026, Klang Valley)Notes
Flexible two-part membraneRM8 – RM14 per sq ftflexible membrane systems under tile in a wet area
Liquid PU membraneRM10 – RM18 per sq ftthe liquid-applied polyurethane family this product belongs to

For a bathroom, the figure most people actually want is the job price. ClickBina re-waterproofs a bathroom at RM1,500 – RM3,500 per bathroom without hacking, or RM4,500 – RM9,000 per bathroom with the tiles off and a new membrane laid — those are our prices, not a market range. Where water is already showing on the ceiling below and the path is unclear, leak detection and assessment is RM300 – RM800 per visit. The breakdown of what drives a bathroom figure up or down is in bathroom waterproofing cost, and the per-square-foot view is in waterproofing cost per square foot.

Why ClickBina

ClickBina waterproofs bathrooms, balconies and wet areas across Kuala Lumpur and Selangor, and on a membrane job the thing worth paying for is not a brand preference — it is a specification you can check. That means the exact product and pack named on the quotation with its data sheet attached, the primer for each substrate priced as its own line, bond-breaker and reinforcement detailing at the junctions rather than an extra coat over them, upstand heights given as dimensions, photographs of the primed substrate and of every coat, and a flood test after the data sheet’s waiting period with you present when it is read. Where the leak path is unclear we do a paid detection visit at RM300 – RM800 per visit. Browse all of our waterproofing and leak repair services, or send photographs of the bathroom and of any product already bought on WhatsApp for a fixed quote.

Ready to price your waterproofing job?

WhatsApp us your job details for a free quote — we'll reply as soon as we can.

💬 Get a Free Quote
Free quote on WhatsAppFlat price, no hidden chargesExperienced KL & Selangor contractor

Sources & official references

This guide refers to the laws, regulators, official bodies and references below. Rules, fees and procedures change — always confirm the current position with the source:

How we estimated prices: where this guide gives renovation or service price ranges, those RM figures are typical Klang Valley market ranges for 2026, compiled from contractor quotations and supplier price lists. They are not official or fixed rates — the final price depends on your site, so confirm it on site before you commit. Statutory fees, fines, tax rates and tribunal limits come from the law or official body concerned, not from market quotes.

Common Questions

Is Davco K10 Plus a cementitious waterproofing product?
No. Sika’s published data sheet describes Davco K10 Plus as a flexible, premixed, ready to use, water based polyurethane Class III waterproofing membrane for use under tile and stone. It arrives as a liquid in a pail and is brushed or rolled on; there is no powder and no mixing ratio. That matters because the preparation, the priming requirements and the waiting periods for a liquid PU membrane are not the same as for a cement-based slurry.
How many coats of Davco K10 Plus are needed, and how thick?
The data sheet specifies a minimum of two coats applied at right angles to each other, with further coats if required, to a minimum total dry film thickness of 1.0 mm built from a minimum wet film thickness of 0.75 mm per coat. Two coats is the floor rather than the target — on a rough or porous substrate, reaching the specified thickness may take more. Ask what dry film thickness the applicator is working to.
How much area does a 20 litre pail cover?
Sika’s published figures are about 13.3 square metres from a 20 litre pail and about 2.75 square metres from a 4 litre pail, at two coats. Measure your floor and wall upstand area, divide, and put the resulting pail count on the quotation before work starts. Then count the empty pails at the end. If the arithmetic and the pail count disagree, the film is thinner than specified, and that is worth raising before the tiles go down.
Does Davco K10 Plus need a primer?
On some substrates, yes, and the data sheet is specific: two coats of a porous primer on lightweight blocks, an etching primer on metal surfaces, and a suitable Sika-branded primer on building boards. Those three cover a great many Malaysian bathrooms — lightweight block partitions, metal trims and upstands, and fibre-cement or building board behind a shower. If your job includes any of them and the quotation has no primer line, ask about it before the pails arrive.
How long before I can tile over it?
The data sheet states 6 to 8 hours before tiling, and 1 to 2 hours between coats. Those are drying times for a water-based product, so a humid unventilated internal bathroom during the monsoon will take longer than the stated minimum — treat them as minimums rather than as a schedule. The commonest breach on a renovation programme is a tiler booked for the same day as the second coat, which damages the membrane under the adhesive where nobody can inspect it.
When can the flood test be done?
The data sheet states 3 days before flood testing. Flooding an immature film is both an unfair test and a way to damage it, so a ponding test on the same day proves nothing useful. Put the test date on the programme, be present when the water goes in and when it is read, mark the level rather than trusting a memory, and check the ceiling below at the same time. Do not let tiling start before the test simply because the tiler is free.
What is the bond-breaker tape for?
The data sheet calls for a 50 mm wide polyethylene or polypropylene tape over cracks and joints subject to movement, and at building board and sheeting joints. A membrane bonded tightly on both sides of a moving crack has to absorb all the movement across the hairline itself, which tears it however elastic it is. The tape leaves the membrane unbonded across 50 mm, so the movement is spread across that width instead. An extra coat over a crack does not do the same thing.
What does the Class III rating mean?
It is a classification against a standard, and which standard applies depends on the market the data sheet was written for. Sika publishes the Davco technical documentation for the Australian market and describes the product as Class III, highly flexible, with elongation greater than 500 per cent. If a specification for your project calls for a particular class, ask your supplier which standard that class is measured against and whether the pack being delivered to you carries the same classification — do not infer it from the family name.

Get a Free Quote

Tell us what you need — we'll reply as soon as we can.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote