Commercial Kitchen Flooring: PU Screed vs Epoxy vs Tiles
🏠 Renovation🏢 Office Fit-Out🛍 Shop Fit-Out💦 Waterproofing❄ Aircon⚡ Electrical & Plumbing🔨 Carpentry🧹 Deep CleaningGuidesDesign IdeasToolsAbout🔍 SearchFree Quote
🍳 Commercial Kitchens

Commercial Kitchen Flooring
PU Screed vs Epoxy vs Anti-Slip Tiles (2026)

Hot oil, boiling water, daily washdowns and staff moving fast: here is how the three kitchen floor systems compare, and what to ask before you choose.

📍 We serve KL, Selangor & Putrajaya.

Clean restaurant kitchen with a seamless red resin floor, coved edges and a drain channel

For a busy commercial kitchen, the choice is between polyurethane cement (“PU screed”), an epoxy system and anti-slip tiles — and the right one depends on heat, water, grease and how long the kitchen can close. PU screed is the resin system sold for hot, wet, heavily washed kitchens; epoxy is seamless and cheaper but less tolerant of hot spills and constant hot washdowns; anti-slip tiles are familiar and easy to patch, but every grout line is a place for grease and water. For reference, ClickBina's guides list self-levelling epoxy at RM10 – RM18 per sq ft and porcelain tile at RM18 – RM35 per sq ft, supply and lay (indicative 2026, Klang Valley).

Why a commercial kitchen floor is different

A home kitchen floor gets wet now and then. A restaurant or central kitchen floor is splashed with oil, sauce and boiling water all day, walked on by staff carrying hot pans, scraped by trolleys and hosed down every night. Slips are the obvious risk: the UK Health and Safety Executive's guidance on slips in catering says spills from food or cooking are among the main causes of slips in kitchens, and that most slips happen on wet or dirty floors.

The floor also has to be cleaned quickly and proved clean. Our commercial kitchen setup guide explains why a food-safe room needs washable, non-absorbent finishes, coving where the wall meets the floor and falls to the drains. The floor finish is where those requirements meet the daily abuse, and it is the part that fails first when the wrong system is chosen.

The three options at a glance

PU screed (polyurethane cement)Epoxy (self-levelling or screed)Anti-slip tiles
What it isA resin-and-cement floor laid as a thick trowelled layerA resin floor poured or trowelled over a primed slabCeramic, porcelain or homogeneous tiles with a textured surface
JointsSeamlessSeamlessGrout line around every tile
Hot water and hot oilThe system sold for hot, wet kitchensLess tolerant of repeated hot spills and hot washdownsTile copes; the grout is the weak point
Slip resistanceTexture set by the aggregateNeeds an anti-slip aggregate; smooth epoxy is slippery when greasySet by the tile's rating
RepairSpecialist patchSpecialist patch; colour match can showReplace single tiles, if spares were kept
DowntimeSpecialist install; ask for the cure timeSpecialist install; ask for the cure timeHacking, laying and grouting take longest

PU screed: the heavy-duty choice

Polyurethane cement, usually called PU screed or urethane cement on site, combines a polyurethane resin with cement and aggregate. It is laid thicker than a coating and is the system resin flooring suppliers position for food production and busy kitchens, where hot water, steam cleaning, animal fats and cleaning chemicals would attack a thinner floor. It is seamless, so there are no grout lines to hold grease, and it is usually laid with a textured finish for grip.

  • Ask for the product's data sheet and check what it says about hot water, thermal shock and the cleaning chemicals your kitchen uses.
  • Ask how thick the system will be laid and how the edges at drains, doors and walls are detailed, because PU screed is usually cut into the slab at the edges rather than feathered out.
  • Ask what the slab needs first: PU screed goes on a sound, clean concrete base, and loose or oily old screed must come out.
  • There is no ClickBina published rate for PU screed; price it from written quotes that name the product and thickness.

Epoxy: seamless and cheaper, with limits

Epoxy floors are common in shops, clinics and some kitchens because they are seamless, wipe clean and cost less than PU screed. ClickBina's epoxy floor guide lists self-levelling epoxy — primer, epoxy slurry and topcoat with a smooth gloss finish — at RM10–RM18 per sq ft, and names commercial kitchens among its uses. The limits show up in a hard-working kitchen: a smooth gloss epoxy becomes slippery under grease unless an anti-slip aggregate is added, and repeated hot spills and hot washdowns can make a thin epoxy coating lift or crack at the stoves and fryers.

Epoxy is often a sensible choice for the drier parts of a food business — dry stores, packing rooms, front-of-house service areas — with PU screed kept for the cookline and wash-up. Surface preparation decides whether any resin floor lasts; a coating on a damp or greasy slab will peel whatever it cost.

Anti-slip tiles: familiar, repairable, grout-dependent

Tiles are what most Malaysian shoplot kitchens already have. They are familiar to every contractor, easy to source and repairable one tile at a time. Our anti-slip tile guide explains the R rating: R12 is listed as high grip, for commercial kitchens and similar, and R11 as a common choice for wet floors. Ask for the rating on the tile's data sheet, not just the word “anti-slip” on the box.

The weak point is the grout. Ordinary cement grout soaks up oil and water, stains, and washes out under daily hosing, and then water gets under the tiles. In a kitchen, tiles should be laid on a full bed with epoxy or urethane grout; our grout types guide compares the options.

Commercial kitchen floor coating: thin coating or thick screed

“Floor coating” covers two very different products in a commercial kitchen. A coating is a thin resin layer rolled or poured over a primed slab, the way most epoxy floors are laid. A screed system such as PU screed is laid as a thick trowelled layer of resin, cement and aggregate. The difference shows at the stoves and fryers: repeated hot spills and hot washdowns can make a thin epoxy coating lift or crack, while PU screed is the system resin flooring suppliers position for hot, wet kitchens.

On price, ClickBina’s epoxy floor guide lists self-levelling epoxy (primer, epoxy slurry and topcoat) at RM10–RM18 per sq ft. There is no ClickBina published rate for PU screed, so price it from written quotes that name the product and thickness. Whichever you choose, ask for an anti-slip aggregate, because a smooth gloss coating becomes slippery once it is greasy, and make sure the slab is dry and clean first: a coating on a damp or greasy slab will peel whatever it cost.

Epoxy vs tile flooring for a restaurant kitchen

Anti-slip epoxyAnti-slip tiles
JointsSeamlessGrout line around every tile; use epoxy or urethane grout
Hot spills and washdownsLess tolerant; a thin coating can lift at the cooklineTile copes; the grout is the weak point
RepairSpecialist patch; colour match can showReplace single tiles, if spares were kept
Indicative price (2026, Klang Valley)RM10 – RM18 per sq ft (self-levelling epoxy)RM15 – RM30 per sq ft homogeneous, RM18 – RM35 porcelain, supply & lay; hacking old tiles RM3 – RM6 per sq ft

Epoxy usually suits cafes, light cooking, dry stores and front-of-house. Tiles suit shoplot kitchens on a tight budget or a short lease, laid on a full bed with proper falls to the drains. For a high-volume cookline with frying, steam and hot washdowns, neither is the first choice: PU screed is the system designed for it, and many kitchens split the floor by zone.

Slip resistance: the texture decides

Whatever the system, grip comes from the surface texture, and it has to survive the cleaning regime. A very rough floor grips well but is hard to clean; a smooth floor is easy to clean but slippery once greasy. Most kitchens settle on a medium texture with a strict cleaning routine. The HSE's catering guidance makes the same point from the other side: stop water getting onto the floor, fix leaks quickly, and clean spills straight away using the right products and equipment.

Falls, drains and coving

No floor finish can make up for a flat slab. The floor needs a fall towards floor drains or a covered drain channel, so water from washdowns runs away instead of standing at the stoves. The edge where the wall meets the floor should be coved, so dirt cannot collect in a right angle. Resin floors can be run up the wall as an integral cove; tiled floors use cove tiles or a coved skirting. Our floor screed guide explains how screed and falls are set before any finish goes down.

  • Check falls before the finish is laid: pour water and watch where it goes.
  • Detail the joint between the floor finish and every drain, gully and channel; this is where leaks and lifting start.
  • Keep equipment on legs or plinths so the floor under it can be cleaned.
  • If the kitchen is above another unit, waterproofing under the floor is a separate item; ask for it in writing.

Downtime: how long the kitchen must close

For an operating restaurant, closing the kitchen is often the largest hidden cost. Tiles need the old floor hacked, the bed laid, the tiles set and the grout cured. Resin systems usually go on faster once the base is sound, but they need a dry slab and time to cure before hot work and washing resume. Ask each quote for the number of days the kitchen will be closed and the cure time before light and full use, and plan around your quietest days.

What it costs

These figures are quoted from ClickBina's epoxy floor and anti-slip tile guides (indicative 2026, Klang Valley). PU screed is priced by specialist quote; there is no ClickBina published rate for it.

ItemIndicative priceSource guide
Self-levelling epoxy (primer, epoxy slurry, topcoat)RM10 – RM18 per sq ftEpoxy floor cost guide
Homogeneous (full-body) tile, supply & layRM15 – RM30 per sq ftAnti-slip tile guide
Porcelain tile, supply & layRM18 – RM35 per sq ftAnti-slip tile guide
Hack and dispose of existing tilesRM3 – RM6 per sq ftAnti-slip tile guide
PU screed (polyurethane cement)By specialist quoteNo ClickBina published rate

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

When comparing quotes, make sure each one states the system or tile, its thickness or rating, the edge and drain details, the preparation of the existing floor and the closure days.

Which one for which kitchen

  • High-volume cooking with hot washdowns, frying and steam (central kitchens, busy restaurants, food production): PU screed is the system designed for it.
  • Light cooking, cafes, dry stores, pantries and front-of-house: anti-slip epoxy can be enough, and costs less.
  • Shoplot kitchens on a tight budget or with short leases: good anti-slip tiles with epoxy or urethane grout, laid on a full bed with proper falls.
  • Mixed kitchens: split the floor by zone rather than choosing one system for everything.

Budgeting a full F&B project? Our restaurant fit-out cost guide shows where the floor sits in the wider fit-out.

How ClickBina can help

Commercial kitchen floors are priced per kitchen after the existing floor, falls and drains are checked. WhatsApp us your job details for a quote: the kitchen size, the current floor, what the kitchen cooks and how long it can close. ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is free.

Sources & methodology

  • ClickBina epoxy floor cost guide — self-levelling epoxy rate and uses.
  • ClickBina anti-slip tile guide — R ratings, tile supply-and-lay rates and hacking.
  • ClickBina commercial kitchen setup guide — hygiene finishes, coving and floor drainage.
  • UK Health and Safety Executive, “Slips and trips” in catering and hospitality — causes of kitchen slips and cleaning.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026. PU screed properties vary by product, so check the manufacturer's data sheet for heat, chemical and cure figures.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What is PU screed?
Polyurethane cement: a resin-and-cement floor laid as a thick, seamless, textured layer. It is the system sold for hot, wet, heavily washed commercial kitchens and food production.
Is epoxy good for a restaurant kitchen?
It can suit light cooking and dry areas, especially with an anti-slip aggregate. In hot, greasy cooklines with daily hot washdowns, a thin epoxy coating is more likely to lift or crack than PU screed.
Are anti-slip tiles enough for a commercial kitchen?
They can be, if the tile's rating suits a commercial kitchen (R12 is listed as high grip for commercial kitchens), the grout is epoxy or urethane and the floor has proper falls to drains.
How much does commercial kitchen flooring cost?
ClickBina's guides list self-levelling epoxy at RM10–RM18 per sq ft and porcelain tile at RM18–RM35 per sq ft, supply and lay (indicative 2026, Klang Valley). PU screed is priced by specialist quote.
Can a new floor go over the old kitchen tiles?
Sometimes, but in a working kitchen loose, hollow or oily tiles usually have to come out first; a new floor is only as good as what is under it.
How long will my kitchen be closed?
It depends on the system, the preparation and the cure time. Ask every quote for the closure days and the time before hot work and washing can resume.
Why does coving matter?
A coved junction between floor and wall has no right angle for dirt to collect in, so the kitchen can be cleaned quickly and properly.
Which floor coating suits a commercial kitchen?
For hot, wet cooklines with daily hot washdowns, PU screed is the system designed for the job; it is laid thicker than a coating. A thin epoxy coating with an anti-slip aggregate can suit light cooking, cafes and dry areas. Self-levelling epoxy is listed at RM10–RM18 per sq ft; PU screed is priced by specialist quote.
Epoxy vs tile flooring: which is better for a restaurant kitchen?
Epoxy is seamless and wipes clean but is less tolerant of repeated hot spills and hot washdowns. Anti-slip tiles cope with heat and can be replaced one at a time, but the grout must be epoxy or urethane and the floor needs proper falls. Busy cooklines are better served by PU screed.
Is epoxy flooring cheaper than tiles for a commercial kitchen?
On ClickBina’s guides, self-levelling epoxy is RM10–RM18 per sq ft and homogeneous tile RM15–RM30 per sq ft supply and lay, with RM3–RM6 per sq ft to hack out existing tiles (indicative 2026, Klang Valley). Compare closure days too, because hacking, laying and grouting tiles takes longest.

Free Quote

Tell us what you need — we reply within the hour.

WhatsApp ClickBina← All Guides
💬 Get Your Free Quote