Office Relocation Checklist
Fit-Out, IT & Landlord Handover (2026)

Moving office? Here is how to run the fit-out of the new space and the hand-back of the old one on one timeline, without paying for two offices longer than you must.

New office floor mid fit-out with glass partitions, data cables and moving boxes

An office relocation has two projects running at once: fitting out the new space and handing back the old one. Start with the leases — the new lease's fit-out period and approvals, the old lease's reinstatement clause — then survey the new space, lock the layout, order IT lines early, and book the reinstatement of the old office so it finishes before the lease does. On ClickBina's published guides, a basic office fit-out runs about RM80 – RM130 per sq ft and a standard reinstatement of the old space RM6 – RM12 per sq ft (indicative 2026, Klang Valley).

Why an office move needs a checklist

Moving an office is not moving house. The new space usually needs a fit-out before anyone can work in it, the internet and phone lines have their own lead times, the landlord of the new building has rules for contractors, and the landlord of the old one expects the unit back in the condition the lease describes. Miss one of these and the company pays rent on two offices, or moves in without internet, or loses its deposit.

A checklist keeps the two projects — fit-out in, reinstatement out — on one timeline, with one person inside the company owning it.

Step one: read both leases

  • New lease: the handover condition (bare shell or fitted), any rent-free fit-out period, the landlord's approval process for drawings, working hours, deposits and the building's contractor rules.
  • Old lease: the notice period, the reinstatement clause (back to bare shell, or to the condition at handover), who decides what must be removed, and when the deposit is returned.
  • Overlap: how many weeks you pay for both, and whether the new landlord will let works start before the lease starts.

ClickBina's commercial tenancy guide explains the usual commercial lease terms.

Step two: survey the new space

Walk the new unit with whoever will fit it out before the layout is final. Check what the landlord actually hands over: ceiling or no ceiling, raised floor or screed, aircon or just chilled-water points, lighting, toilets, and the capacity of the electrical supply. Note where the risers, water points and fire sprinklers are, because they decide where the pantry, server room and meeting rooms can go. Ask the building for its fit-out guide.

Step three: design and fit-out

Settle the headcount, the number of meeting rooms, the pantry and any server or comms room, then have the layout drawn and submitted to the landlord. Choices made now decide both the cost and the end-of-lease bill later: ClickBina's guides on demountable partitions and raised floor versus floor trunking compare options that are easier to take out when you leave.

Get the fit-out quoted on the approved drawings, line by line, and agree the programme with dates for the landlord's inspections.

Step four: IT, internet and phones

  • Order the new internet line as soon as the address is confirmed; installation lead times vary by building and provider.
  • Plan data points and power at every desk, meeting room screen, printer and access reader before the ceiling and partitions close.
  • Decide where the network cabinet or server lives, with cooling and a dedicated power circuit; see the server room guide.
  • Move or re-program access cards, the door access system and any CCTV.
  • Plan the cut-over weekend: back up, move, test, and keep the old line until the new one is proven.

Step five: aircon, power and safety

Check the aircon covers the new layout, especially meeting rooms and the server room; confirm the electrical load for the pantry, printers and servers; and make sure exits, fire extinguishers and sprinkler coverage still work with the new partitions. The building management and the fire authority's requirements come before the design.

Move week: people, packing and the first day

The move itself is the shortest part of the project, but it is the part everyone remembers. Book the movers and the service lifts at both buildings well ahead, and check each building's rules on weekend and after-hours moves, floor protection and loading bays. Give every team a packing deadline and a simple labelling system that matches the new floor plan, so crates land at the right desks.

  • Walk the new office before moving day: snag list, cleaning, keys and access cards ready.
  • Move IT first or last by plan, not by accident; test every desk, printer and meeting room screen before staff arrive.
  • Update the company address with banks, suppliers, SSM records, the website and delivery accounts.
  • Keep a small team on the first working day to fix the problems that only show up once people are in.

Step six: hand back the old office

Reinstatement is the half of the move that is most often left too late. Agree the scope with the old landlord in writing, ideally with a joint walk-through, then book a contractor early enough to finish, clean and pass the landlord's inspection before the lease ends. ClickBina's office reinstatement guide explains what a light make-good, a standard strip-out and a heavy reinstatement usually involve.

  • Remove partitions, carpets, ceilings and fittings the lease says must go; cap off electrical and plumbing points.
  • Repair and repaint walls; clean the unit.
  • Record the handed-back condition with dated images and get the landlord's written acceptance.
  • Follow up the deposit.

The relocation at a glance

PhaseMain tasksWatch out for
Decide and signCompare spaces, read leases, sign the new lease, give notice on the oldNotice period and overlap rent
Survey and designSurvey the new unit, draw the layout, submit to the landlordLandlord approval time
Order long-lead itemsInternet line, furniture, aircon changes, glass partitionsDelivery and installation queues
Fit-outBuild, M&E, IT cabling, inspectionsChanges after work starts
MovePack, move, set up IT, testWeekend building rules and lift bookings
Hand backReinstate, clean, inspect, depositFinishing after the lease ends

What a relocation costs

The two biggest building costs are the fit-out of the new space and the reinstatement of the old. These indicative Klang Valley figures (2026) are from ClickBina's published guides:

ItemIndicative priceSource guide
Office fit-out, basic / functionalRM80 – RM130 per sq ftOffice fit-out cost guide
Office fit-out, mid-range corporateRM140 – RM200 per sq ftOffice fit-out cost guide
Reinstatement, light make-goodRM3 – RM6 per sq ftOffice reinstatement guide
Reinstatement, standard strip-outRM6 – RM12 per sq ftOffice reinstatement guide
Reinstatement, heavy strip-out to bare shellRM12 – RM20+ per sq ftOffice reinstatement guide

Want this priced for your home?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Movers, furniture, IT equipment, internet installation and overlap rent come on top. The office fit-out cost guide breaks the fit-out down further.

How ClickBina can help

ClickBina is an experienced KL & Selangor contractor for whole-house refurbishment and trade coordination. For an office relocation, WhatsApp us your job details for a quote: the size and location of the new and old offices, what the new landlord hands over, what the old lease requires, and the move date. We reply within the hour, the price we agree is a flat price with no hidden charges, and a site visit is RM150, waived if you go ahead.

Sources & methodology

  • ClickBina office fit-out cost guide — fit-out prices by grade.
  • ClickBina office reinstatement cost guide — make-good and strip-out prices and scope.
  • ClickBina commercial tenancy, partition, cabling and server room guides — related decisions.

How we estimated prices: every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026, not fixed rates. Lease terms differ; your leases and the buildings' rules decide what applies.

Ready to get it sorted?

WhatsApp us your job details for a quote — we reply within the hour.

💬 WhatsApp for a quote
Reply within the hourFlat price, no hidden chargesExperienced KL & Selangor contractor

Common Questions

What should an office relocation checklist include?
Both leases, a survey of the new space, the layout and landlord approval, the fit-out, internet and IT, aircon and power, the move itself, and the reinstatement and hand-back of the old office.
When should we start planning an office move?
As soon as you start looking at spaces; the notice period, landlord approvals, fit-out and internet installation all take time.
Who pays to restore the old office?
Usually the outgoing tenant, as set out in the reinstatement clause of the old lease.
How much does an office fit-out cost?
On ClickBina's fit-out guide, about RM80–RM130 per sq ft for a basic functional office and RM140–RM200 for a mid-range corporate fit-out (indicative 2026, Klang Valley).
How much does office reinstatement cost?
ClickBina's reinstatement guide lists RM3–RM6 per sq ft for a light make-good, RM6–RM12 for a standard strip-out and RM12–RM20+ for a heavy strip-out to bare shell.
What is the most common relocation mistake?
Leaving the old office's reinstatement until the last weeks, so it overruns the lease and the deposit is held.
How do we avoid moving in without internet?
Order the new line as soon as the address is confirmed and keep the old line until the new one is tested.