Fitting out a centre where patients exercise, recover and move slowly, from the entrance to the exercise floor.
📍 We serve KL, Selangor & Putrajaya.

A physiotherapy or rehab centre is two premises in one: quiet, private treatment cubicles and an open exercise area, both used by people who may walk slowly, use a walking frame or arrive in a wheelchair. The fit-out is driven by step-free access, a floor that suits both exercise and wheels, walls strong enough for bars and mirrors, power at every bed, and an accessible toilet. Confirm with the Ministry of Health and the council what registration your centre needs before you design. ClickBina's guides put mid-range SPC flooring at RM7 – RM13 per sq ft installed and an accessible-standard WC at RM350 – RM1,200 (indicative 2026, Klang Valley). A site visit is free.
A GP clinic is built around a consultation room and a short wait. A physiotherapy centre is built around movement. Patients spend most of an appointment on a treatment bed or in an exercise area, they may come back two or three times a week, and many arrive after surgery, a stroke or an injury that makes steps and slippery floors a real hazard. The rooms are less about equipment rooms and more about space, privacy and safe movement between them.
That changes the order of decisions. Access and floor finish come first, then the split between cubicles and open floor, then the walls and power that the equipment needs. The clinic interior design guide covers the general clinic layout; this page covers what is different for rehab.
The Private Healthcare Facilities and Services Act 1998 lists the physiotherapist among healthcare professionals and defines a healthcare facility as any premises in which members of the public receive healthcare services. Which registration applies to your centre depends on how it is set up and who runs it, so confirm it with the Ministry of Health before you sign a lease or draw a layout. Ask the council at the same time: turning a house or an office floor into a centre can be a change of use, which the change of use guide explains.
Two practical checks before signing: whether the unit can be reached without steps, and whether the building allows the opening hours and noise of an exercise area. A first-floor shoplot with no lift rules out many patients.
Most centres need the same five zones. Sizes depend on how many therapists work at once, but the relationships between zones matter more than the square footage.
| Zone | What it needs | Finish priorities |
|---|---|---|
| Reception and waiting | Space to turn a wheelchair, seats with arms, a low counter section | Durable floor, no loose rugs |
| Assessment and treatment cubicles | Room for a bed with access on both sides, privacy, a socket at each bed | Washable walls, curtains or partitions |
| Exercise and gym area | Open floor, wall bars, parallel bars, a mirror wall, steps for practice | Impact-tolerant floor, reinforced walls |
| Accessible toilet and changing | Step-free entry, grab bars, space beside the WC | Anti-slip floor |
| Store and staff area | Equipment storage off the exercise floor, linen, records | Lockable, ventilated |
Keep the route from the entrance to the cubicles, the exercise area and the toilet short and level. Patients should not have to cross the exercise area to reach a treatment bed.
The floor has to be firm enough for wheelchairs and walking frames, forgiving enough for exercise, and easy to clean. Vinyl or SPC planks suit reception, corridors and cubicles: smooth for wheels and simple to wipe. The exercise area often takes a rubber floor where weights and drops are expected; the gym rubber flooring guide explains types and thicknesses. Wherever two floors meet, the junction should be flush or ramped, never a lip that catches a foot or a castor.
Wet areas need an anti-slip surface. The commercial flooring guide compares the options by business type.
Cubicles can be full-height partitions with doors, half-height partitions with curtain track, or curtains alone. Full partitions give the best sound privacy for assessments and sensitive conversations; curtains are cheaper and flexible but carry speech. Many centres mix them: a few closed rooms for assessments and women's health, and curtained bays for routine treatment.
Each bed needs room for the therapist to work from both sides, a socket close by for electrotherapy and ultrasound units, a hook or shelf, and good, glare-free light. The acoustic privacy guide explains how partitions leak sound over the ceiling.
Every route a patient uses should be step-free: the entrance, the corridor, the cubicles, the exercise area and the toilet. Doors should be wide enough for a wheelchair and easy to push, and door closers set so they do not swing shut on a slow walker. The accessible toilet and ramp guide covers ramp gradients, toilet layout and grab bars for business premises.
Handrails along the corridor and beside the practice steps double as therapy equipment. The handrail guide explains continuous rails and which side to fit them on.
Wall bars, parallel bars fixed to the wall, pulley systems and mirror walls all put load on the wall. Plan them before the partitions go up: a drywall partition needs timber or steel backing behind every fixing point, and brick or block walls need suitable anchors. A mirror wall in the exercise area should be safety glass or backed mirror, fixed so it cannot drop if a patient leans on it. The gym mirror installation guide covers fixing and safety.
Electrotherapy, ultrasound, hydraulic beds and treadmills mean more sockets than an office of the same size. Put a socket at the head of each bed and plan circuits so a fault at one cubicle does not darken the whole centre. Exercise raises heat and humidity, so the exercise area needs its own cooling and fresh air rather than sharing a unit with the quiet cubicles. Electrical work is for a registered wireman.
Treatment beds, mats and equipment are wiped many times a day, and so are the walls and floors around them. Choose washable paint or wall panels in cubicles, seal floor junctions, and put a hand-wash basin where therapists can reach it between patients. The clinic infection-control finishes guide sets out the finishes in detail.
A whole centre is priced from a site visit and a layout. These published ClickBina figures cover the items a rehab fit-out usually involves (indicative 2026, Klang Valley):
| Item | Indicative price | Source guide |
|---|---|---|
| Mid-range SPC flooring, installed | RM7 – RM13 per sq ft | Commercial flooring guide |
| Anti-slip epoxy for wet areas | RM10 – RM16 per sq ft | Elderly parents home modification guide |
| New WC, supplied and installed | RM350 – RM1,200 | Elderly parents home modification guide |
| Basic full bathroom (re-tile, new toilet, basin, tap, shower set) | RM6,000 – RM10,000 | Elderly parents home modification guide |
| Concealed (chased-in) socket | RM200 – RM400 | Add power points guide |
| Small GP / medical clinic fit-out, for scale | RM150 – RM220 per sq ft | Clinic interior design guide |
WhatsApp us your job details for a quote — we reply within the hour.
💬 WhatsApp for a quoteWhatsApp us your job details for a quote: the premises, its size, how many therapists will work at once, and the equipment you plan. ClickBina is an experienced KL & Selangor contractor for commercial renovation and fit-out, and coordinates the trades, so flooring, partitions, wall backing, plumbing, wiring and aircon are planned in the right order as one job. We reply within the hour, and the price agreed is a flat price with no hidden charges. A site visit is free.
Methodology: prices are ClickBina indicative 2026 Klang Valley ranges from the guide named beside each. This page names no registration rule; the Ministry of Health and your council confirm what applies.