Opening a pet shop or a grooming salon? Plan the wet workroom first, then the shop around it.
📍 We serve KL, Selangor & Putrajaya.

A pet shop with grooming is a retail shop with a small wet room inside it. Plan the grooming area first: raised wash tubs on their own drain with a hair trap, hot water, a drying zone with strong exhaust, and floors and lower walls that take water, claws and disinfectant every day. The retail front can be a standard shop fit-out. ClickBina has no published pet-shop rate, so the nearest guides are a basic salon at RM120 – RM170 per sq ft and a standard retail shop at RM80 – RM150 per sq ft (indicative 2026, Klang Valley).
Most shop fit-outs are dry: shelving, a counter, lighting and a nice frontage. A pet shop that also grooms dogs and cats is two premises in one unit. The front is retail, with food, accessories and a till. The back is a wet, noisy, hairy workroom where animals are bathed, dried, clipped and held until their owners come. Water, hair, smell and barking are the four things that make or break the fit-out.
The closest relatives on ClickBina are the salon interior design guide (wash points, stations, mirrors and ventilation) and the vet clinic fit-out guide (keeping animals apart, washable finishes and drainage). A grooming salon takes the wash area of the first and the hygiene thinking of the second, without the medical rooms.
Before you sign the tenancy, check the things that are expensive or impossible to change later. A ground floor shoplot with a rear lane is usually easier than an upper floor or a mall unit, because water, drainage and exhaust can run to the back and animals do not share a lift with shoppers.
ClickBina's commercial fit-out process guide explains the order of lease, design, approvals and works, and why the approvals should start first.
Think of the shop as a one-way route. Customers and clean products stay at the front; dirty animals, water and hair stay at the back; the two meet only at the reception counter.
| Zone | What goes there | What it needs |
|---|---|---|
| Retail front | Shelving, food display, accessories, the counter | Good lighting, easy-clean floor, a door that animals cannot slip out of |
| Reception and check-in | Counter, waiting bench, a gate or half door | A barrier between the shop floor and the workroom |
| Wash area | Raised tubs, hand shower, hot water | Own drain with a hair trap, waterproofed and tiled walls |
| Drying and clipping | Grooming tables, dryers, tool storage | Strong exhaust, plenty of power points, washable walls |
| Holding | Cages or pens for animals waiting | Ventilation, a washable floor, no direct sun |
| Back of house | Laundry for towels, storage, staff toilet | Water and drainage for a washing machine, a mop sink |
Keep the wash area next to the drying area so wet animals are not carried across the shop. Put the holding cages where staff can see them from the grooming tables. A half door or gate at the entrance to the workroom stops a loose dog reaching the front door.
The wash area is where most of the money and most of the problems sit. Raised tubs save the groomer's back, and each one needs hot and cold water, a hand shower and a drain. Pet hair is the enemy of drains: it binds with shampoo and soap into a mat that blocks pipes quickly. Every tub should drain through a hair trap that staff can empty daily, and the floor trap needs a removable basket too.
The plumbing points, falls and sewer connection are set out by the plumber; ClickBina's shop plumbing fit-out guide explains how new water points and drains are surveyed and who owns which pipe. Ask early whether the water heater for the tubs is a storage or an instant type, because it decides the power supply the electrician must plan.
The wash corner itself is renovation work: waterproofing the floor and the walls behind the tubs, a proper fall to the trap, and tiles or another washable finish to a good height. That is the part most often skimped and most often redone after a leak into the unit below.
A grooming floor is wet most of the day, cleaned with disinfectant every night, and scratched by claws. It has to be slip-resistant when wet, because staff carry animals across it. Two finishes do this well:
Avoid vinyl plank and laminate in the workroom; they look fine on day one but water gets into the joints. On the walls, tile the wash area to a good height and use a washable, scrubbable finish elsewhere in the workroom. In the retail front you can use whatever floor suits the brand, as long as it mops easily.
Wet dogs, shampoo and dryers make the workroom humid and smelly, and fine hair floats everywhere. The aircon contractor and the ventilation designer need to know this at the start, because a normal shop aircon will struggle. The usual answers are an exhaust fan in the wash and drying area that pulls air out of the back, a supply of fresh air, and aircon filters that are easy to reach for frequent cleaning.
Keep the workroom slightly lower in pressure than the shop, so smells move towards the exhaust and not into the retail front. Closed cabinets instead of open shelves in the grooming area keep hair off clean towels and tools.
Barking and dryers are loud, and shoplots share party walls. If the unit is next to a sensitive neighbour, build the workroom walls as an insulated partition, seal gaps around doors and pipes, and keep noisy dryers away from the shared wall. ClickBina's wall soundproofing guide explains which wall build-ups actually reduce noise and which only look like they should.
The retail side is a normal shop fit-out. Plan heavy food bags at low level near the door and the counter, light accessories at eye level, and a stockroom with shelving that keeps sacks off the floor and away from pests. A counter with a low section lets customers lift a small dog onto it at check-in.
Pet food attracts rats and cockroaches. Seal the gaps under counters and cabinets, use closed storage for open bags, and keep the stockroom dry. ClickBina's retail fit-out cost guide covers shelving, counters, lighting and the shopfront.
ClickBina has no published rate for pet shops, so these are the nearest published ranges (indicative 2026, Klang Valley). A grooming salon sits close to a salon because of the wash area; a pet shop with no grooming sits closer to a standard retail shop.
| Reference item | Indicative price | Source guide |
|---|---|---|
| Basic / budget salon fit-out (closest rate for a grooming salon) | RM120 – RM170 per sq ft | Salon interior design guide |
| Mid-range salon fit-out | RM170 – RM230 per sq ft | Salon interior design guide |
| Standard retail shop fit-out | RM80 – RM150 per sq ft | Retail fit-out cost guide |
| Anti-slip epoxy floor for wet areas | RM10 – RM16 per sq ft | Epoxy floor guide |
| Porcelain tile, supply and lay | RM18 – RM35 per sq ft | Anti-slip tiles guide |
WhatsApp us your job details for a quote — we reply within the hour. A site visit is free. We serve KL, Selangor & Putrajaya.
💬 WhatsApp for a quoteWhat moves the price: the size of the grooming area, the number of tubs and how far they are from the drain, the exhaust and aircon work, whether the unit is bare or was a previous shop, and how much of the frontage you change. Approval fees and drawings are separate from the build.
A pet shop or grooming fit-out is quoted from the unit and a short brief. WhatsApp us your job details for a quote with:
ClickBina is an experienced KL & Selangor contractor and does the renovation works itself: partitions, wet-area waterproofing and tiling, floors, cabinets and counters, ceilings and paint, and it coordinates the other trades on the job. Approvals with the council or DVS are made by the owner or their consultant. We reply within the hour, and the price we agree is a flat price with no hidden charges.
How we estimated prices: ClickBina has no published pet-shop rate, so every RM figure on this page is quoted unchanged from the ClickBina guides named above; they are indicative Klang Valley ranges for 2026.